P Duke SPEnergy STEVEN D CAPPS Vice President McGuire Nuclear Station Duke Energy MG0J VP / 12700 Hagers Ferry Rd.
tIuntersville, NC 28078 980-875-4805 980-875-4809 fax Steven. Capps@duke-energy. corn December 13, 2012 10 CFR 50 Appendix E.IV.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555.,
Subject:
Duke Energy Carolinas, LLC (Duke Energy)
McGuire Nuclear Station (MNS), Units 1 and 2 Docket Nos. 50-369 and 50-370 Renewed License Nos. NPF-9 and NPF-17 Submittal of Evacuation Time Estimates (ETE) Analysis
Reference:
- 1. 10 CFR 50 Appendix E, Emergency Planning and Preparedness for Production and Utilization Facilities,Section IV, Content of Emergency Plans
- 2. KLD Engineerirng, P.,;. gtps1
,TR,,5O1,:cGtdire1'uclear Station, Development ottEvacuation Time Estimates, Revision 1, "December 2012 Section IV.4 of Reference 1 requires, in parrt, t'hat nuclear reactor power licensees develop an ETE analysis using the most recent decennial census data, and to submit this report within 365 days of the later of the date of, the aailability of the most recent decennial census data or December 23, 2011.
This submittal comprises thf aforementioned 365 day response for MNS. The enclosure (Reference 2) is the evacuation time estimates report for MNS, using U.S. Census Bureau data files for the year 2010. The enclosure is providc-d e&,3ctronically via CD-ROM.
i This letter contains no new regulatory commitronts.
ew. duke-energy corn
United States Nuclear Regulatory Commission December 13, 2012 Page 2 Should you have any questions concerning this letter, or require additional information, please contact Michael K. Leisure at (980) 875-5171.
Respectfully submitted, Steven D. Capps Enclosure
United States Nuclear Regulatory Commission December 13, 2012 Page 3 xc:
V. M. McCree, Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257 J. H. Thompson, Project Manager U. S. Nuclear Regulatory Commission One White Flint North, Mailstop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 J. Zeiler NRC Senior Resident Inspector McGuire Nuclear Station
United States Nuclear Regulatory Commission December 13, 2012 Enclosure ENCLOSURE McGuire Nuclear Station Development of Evacuation Time Estimates Report