I Duke Energy.
DAVE BAXTER Vice President Oconee Nuclear Station Duke Energy ONOI VP / 7800 Rochester Highway Seneca, SC 29672 864-873-4460 864-873-4208 fax dabaxter@dukeenergy.com June 10, 2009 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C., 20555-0001
Subject:
Duke Energy Carolinas, LLC Oconee Nutlear Station, Units 1, 2, and 3 Renewed Facility Operating License, DPR-38,.DPR-47, and DPR-55 Docket Numbers 50-269, 50-270, and 50-287 Interim 30-Day Response to Reference 2.
Duke Letter from Dave Baxter to NRC Document Control Desk, "Request for Extension of Duke Response Time to Referenced Letter [Reference 2]" dated May 20, 2009.
References:
1.
- 2.
NRC Letter from Joseph G. Glitter to Dave Baxter, 4Evaluation of Duke Energy Carolinas, LLC (Duke), September 26, 2008, Response to Nuclear Regulatory Commission (NRC) Letter dated August 15, 2008, Related to External Flooding at Oconee Nuclear Station, Units 1, 2, and 3 (Oconee) (TAG Nos. MD8224, MD8225, and MD8226)," dated April 30, 2009.
On May 11, 2009, Duke Energy Carolinas, LLC (Duke), Federal Energy Regulatory Commission (FERC) and Hydropower Consultant HDR-DTA personnel participated in a closed meeting at NRC headquarters with representatives from the Office of Nuclear Reactor Regulation (NRR) and Region I[. At that meeting, Duke presented information regarding preliminary inundation studies and sensitivity analyses involving a postulated failure of the Jocassee Dam and potential flooding at Oconee.
By letter dated April 30, 2009 (Reference 2), the NRC requested that Duke provide its plan and schedule for completing the final inundation studies and sensitivity analyses within 30 days following the May 11, 2009, meeting. In addition, the letter stated that the NRC and Duke
"'*%irth
-tet-and att mentcontain ecurity nsitifvej:
rmatip.
u Disc under
.390
,]4Z.~
www.duke-energy.com
U. S. Nuclear Regulatory Commission June 10, 2009 Page 2 will begin holding monthly status meetings in June 2009 to further discuss these issues. On May 20, 2009, Duke responded to the April 30, 2009, letter by committing to provide an interim response within 30 days following the May 11, 2009, meeting and a final response within 60 days following that meeting.
The purpose of this letter is to provide Duke's interim 30 day response which includes, "Tentative Project Schedule for Completing the Final Inundation Studies and Sensitivity Analyses." This schedule will be discussed with the NRC staff during the monthly meeting scheduled for June 11, 2009.
Since this letter and the attachment contain commercially sensitive information, Duke hereby requests the NRC withhold the letter and the attachment from public disclosure pursuant to 10 CFR 2.390 (d) (1), "Public inspections, exemptions, requests for withholding."
If you have any questions on this matter, please contact Jeff Thomas, Fleet Regulatory Compliance Manager, at 864-873-2790 (Oconee) or 704-382-3438 (Charlotte).
Sincerely, Dave Baxter, Vice President Oconee Nuclear Station
Attachment:
- 1. Tentative Project Schedule for Completing the Final Inundation Studies and Sensitivity Analyses This I ter and a chment con ecurity sen tive form tion.
ithhold from lic D osur der CFR 23 (1)
U. S. Nuclear Regulatory Commission June 10, 2009 Page 3 bc:
Mr. Luis Reyes USNRC - Region II Sam Nunn Atlanta Federal Center, Suite 23T85, 61 Forsyth St., SW, Atlanta, GA 30303-8931 Mr. J. F. Stang, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission.
Mail-Stop 0-8 G9A Washington, DC 20555 Mr. Andy Hutto NRC Senior Resident Inspector Oconee Nuclear Station Susan E. Jenkins, Manager, Infectious and Radioactive Waste Management, Bureau of Land and Waste Management Department of Health & Environmental Control 2600 Bull Street, Columbia, SC 29201 Tentative Project Schedule for Completing the Final Inundation Studies and Sensitivity Analyses 2l 4
73 May Jun Jul Aug 5"lified Analysis of West Oconee Yard inundation Orgnlo 4Analysis 7120 7/1 t7/20 VerificadIon oi AnalYL 7/21 8/17 Final Report Oct Nv.
13 15 16 It, 20 Modeling and Analysis of West Oconee Yard inundation 6 12 2 L.7115 Development_ý Eourdr 20 Hydraulic Analysis Preiiminary Reypo 9/16 5/3'0 DuRe viaew 1011 10115 Final Report Key Parameter Selection and Determination of Variation 5/16 6/26 Identification of Key Parameters 6129 7115 Determination of Variation of Kly Parameters 7116 7131 Documentation of Selected Paramneters and their Variation B
5/25 HEC-RAS Sensitivity Inundation Analysis Pretirn~nary Antaysis RASUlIt 9.16
- 1. /*
Duke Review 10/2 10/15 Final Report 21 22 24 3eWfe aoo&
10.19 as,
("ogress Sunimnal Task~s
.Dal Spo Mies one 4
rqe~ Simrmary w
ElenMioon rid ptp andttachment raiatamn -wsmtity cniipaformatinniWsin T5hisIpnt ro a
'L.
~
.~z l CI.9l()