Beaver Valley Power Station, Units 1 and 2, Assessment Follow-up Letter (Report 05000334-12-008 and 05000412-12-008
ML12349A204
Person / Time
Site: Beaver Valley
Issue date: 12/14/2012
From: Roberts D J
Division Reactor Projects I
To: Harden P A
FirstEnergy Nuclear Operating Co
Roberts D J
References
Download: ML12349A204 (3)


See also: IR 05000334/2012008

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 December 14, 2012

Mr. Paul A. Harden, Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Route 168 P.O. Box 4 Shippingport, PA 15077-0004

SUBJECT: ASSESSMENT FOLLOW-UP LETTER FOR BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (REPORT 05000334/2012008 AND 05000412/2012008)

Dear Mr. Harden:

As a result of its continuous review of plant performance, the U. S. Nuclear Regulatory Commission (NRC) updated its assessment of Beaver Valley Power Station, Units 1 and 2. The NRC's evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRC's assessment of and its plans for a future inspection at your facility. This letter supplements, but does not supersede, the mid-cycle letter issued on September 4, 2012.

On October 4, 2012, the NRC forwarded a letter that stated the final significance determination of one or more greater-than-green inspection findings in the Security Cornerstone. The finding, which occurred in the third quarter of 2012, was previously documented and assessed in NRC Inspection Report Nos. 05000334/2012404 and 05000412/2012404, issued on August 16, 2012.

The NRC determined the performance at Beaver Valley Power Station, Units 1 and 2, to be in the Regulatory Response Column of the Reactor Oversight Process Action Matrix beginning third quarter of 2012. Therefore, the NRC plans to conduct a supplemental inspection. The NRC requests that your staff provide notification of your readiness for the NRC to conduct this supplemental inspection. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Mr. Gordon K. Hunegs at 610-337-5046 with any questions you have regarding this letter.

Sincerely,/RA/

Darrell J. Roberts, Director Division of Reactor Projects Docket Nos. 50-334, 50-412 License No. DPR-66, NPF-73 cc: Distribution via ListServ Please contact Mr. Gordon K. Hunegs at 610-337-5046 with any questions you have regarding this letter.

Sincerely,/RA/ Darrell J. Roberts, Director Division of Reactor Projects Docket Nos. 50-334, 50-412 License No. DPR-66, NPF-73 cc: Distribution via ListServ

Distribution: W. Dean, RA D. Lew, DRA D. Roberts, DRP P. Wilson, DRP C. Miller, DRS J. Clifford, DRS G. Hunegs, DRP S. Barber, DRP A. Dugandzic, DRP D. Spindler, DRP, SRI E. Bonney, DRP, RI P. Garrett, DRP, AA C. Santos, RI OEDO ROPassessment.Resource@nrc.gov RidsNrrPMBeaverValley Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource DOCUMENT NAME: G:\DRP\BRANCH6\+++Beaver Valley\BV - Assessment Follow-Up Letter .docx ADAMS ACCESSION NUMBER: ML12349A204 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE lhp RI/DRP RI/DRP RI/DRS RI/DRP NAME NLafferty/NL GHunegs/GKH ADimitriadis/AD DRoberts/DJR DATE 12/12/12 12/13/12 12/13/12 12/14/12 OFFICIAL RECORD COPY