Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML12342A101
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/19/2012
From: Jesse M D
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-12-171
Download: ML12342A101 (3)


Text

A Exelon Generation 10 CFR 50.54(f)RS-12-171 November 19, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Exelon Generation Company, LLC's 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident

References:

1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 2. Exelon Generation Company, LLC's 120-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated July 10, 2012 3. NRC Letter, Endorsement of Electric Power Research Institute (EPRI) Draft*Report 1025286, "Seismic Walkdown Guidance," dated May 31, 2012 On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees.

Enclosure 3 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic. On July 10, 2012, Exelon Generation Company, LLC (EGC) submitted the 120-day response (Reference

2) requested in Enclosure 3 of Reference 1, confirming that EGC would use the NRC-endorsed seismic walkdown procedure.

U.S. Nuclear Regulatory Commission 180-Day Response to 50.54(f) Letter NTTF Recommendation 2.3: Seismic November 19, 2012 Page 2 For seismic Recommendation 2.3 (walkdowns), Enclosure 3 of Reference 1 states that within 180 days of the NRC's endorsement of the walkdown process (Reference 3), each addressee will submit a final response, including a list of any areas that are unable to be inspected due to inaccessibility and a schedule for when the walkdown will be completed.

This letter provides the Limerick Generating Station, Units 1 and 2 (LGS Units 1 and 2) 180-day response to Reference 1 for Seismic Recommendation 2.3. This response also identifies electrical cabinets scheduled for future walkdowns based on the recent clarification to the NRC expectations for seismic walkdowns.

Conditions identified during the walkdowns were documented and entered into the corrective action program.Enclosures 1 and 2 to this letter provide the requested information for LGS Units 1 and 2.This letter contains new regulatory commitments, which are identified in Enclosure 3.Should you have any questions concerning the content of this letter, please contact Ron Gaston at (630) 657-3359.I declare under penalty of perjury that the foregoing is true and correct. Executed on the 19th day of November 2012.Respectfully, Michael D. JIess~e, Director -Licensir~

& !uglatory Affairs Exelon Generation ompany, LLC

Enclosures:

1. Seismic Walkdown Report In Response To The 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 1, Report Number: MPR-3796, Revision 1 2. Seismic Walkdown Report In Response To The 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report Number: MPR-3801, Revision 1 3. Summary of Regulatory Commitments U.S. Nuclear Regulatory Commission 180-Day Response to 50.54(f) Letter NTTF Recommendation 2.3: Seismic November 19, 2012 Page 3 cc: Director, Office of Nuclear Reactor Regulation (w/o Enclosures 1 and 2)Regional Administrator

-NRC Region I (w/o Enclosures 1 and 2)NRC Senior Resident Inspector

-LGS Units 1 and 2 (with Enclosures 1 and 2 via CD)NRC Project Manager, NRR -LGS Units 1 and 2 (with Enclosures 1 and 2 via CD)Director, Bureau of Radiation Protection

-Pennsylvania Department of Environmental Resources (with Enclosures 1 and 2 via CD)R. R. Janati, Chief, Division of Nuclear Safety, Pennsylvania Department of Environmental Protection, Bureau of Radiation Protection (with Enclosures 1 and 2 via CD)