| From: | Conner J Detroit Edison, Co, DTE Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-12-0075 | |
| Download: ML12341A362 (4) | |
Text
J. Todd Conner Site Vice President DTE Energy Company 6400 N. Dixie Highway, Newport, M1 48166 Tel: 734.586.4849 Fax: 734.586.5295 Email: connerj@dteenergy.com DTE Energy-10 CFR 50.54(f)
November 26, 2012 NRC-12-0075 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
References:
- 1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
- 2) NRC Letter, "Request For Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012
- 3) Detroit Edison Letter, "Detroit Edison's 120 Day Response to March 12, 2012 Information Request Regarding Seismic Walkdowns," NRC-12-0046, dated July 6, 2012
Subject:
Detroit Edison's Response to March 12, 2012 Information Request Regarding Seismic Walkdowns On March 12, 2012, the NRC issued Reference 2 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 3 to Reference 2 contains specific Requested Actions, Requested Information and Required Responses associated with Recommendation 2.3 regarding seismic walkdowns.
In Reference 3, Detroit Edison confirmed that Fermi 2 would follow the NRC-endorsed guidance for performing the seismic walkdowns to respond to the information request.
Submittal of the walkdown report is due November 27, 2012 which is 180 days following NRC endorsement of the guidance for performing the walkdowns. The Fermi 2 Seismic Walkdown Report is provided with this submittal.
USNRC NRC-12-0075 Page 2 The regulatory commitments contained in this submittal are listed in Enclosure 1.
Should you have any questions or require additional information, please contact Mr.
Kirk R. Snyder, Manager, Industry Interface at (734) 586-5020.
Sincerely, cc:
Director, Office of Nuclear Reactor Regulation NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 4, Region III Regional Administrator, Region III Supervisor, Electric Operators, Michigan Public Service Commission
USNRC NRC-12-0075 Page 3 I, J. Todd Conner, do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
J.
Conner Sitwice President, Nuclear Generation On this day of November, 2012 before me personally appeared J. Todd Conner, being first duly sworn and says that he executed the foregoing as his free act and deed.
Notary Public NOTARY PUBM S"ATEOFMJ COUNTYOFMONRO WY OIMN*MRO EroREr4 14,M3
$CJMINGI#cUNPF, 14
USNRC NRC-12-0075 Page 4 bcc: M. S. Caragher [w/o Walkdown Report]
J. P. Christinidis [w/o Walkdown Report]
J. K. Ford [w/o Walkdown Report]
J. H. Plona [w/o Walkdown Report]
Z. W. Rad [w/o Walkdown Report]
K. C. Scott [w/o Walkdown Report]
K. R. Snyder [w/o Walkdown Report]
Electronic Licensing Library (ELL) - 200 TAC Information Management - 140 NOC Michigan Department of Environmental Quality [w/o Walkdown Report]