Official Exhibit - ENT000528-00-BD01 - NUREG-1950, Disposition of Public Comments and Technical Bases for Changes in the License Renewal Guidance Documents NUREG-1801 and NUREG-1800 (Apr. 2011) (Excerpted)
ML12340A691
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/30/2011
From:
Office of Nuclear Reactor Regulation
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 23330, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12340A691 (32)


Text

United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.

In the Matter of:

(Indian Point Nuclear Generating Units 2 and 3)

ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: ENT000528-00-BD01 Identified: 10/15/2012 Admitted: 10/15/2012 Withdrawn: ENT000528 Rejected: Stricken: Submitted: August 20, 2012 Other:

NUREG-1950 Disposition of Public Comments and Technical Bases for Changes in the License Renewal Guidance Documents NUREG-1801 and NUREG-1800 Office of Nuclear Reactor Regulation

NUREG-1950 Disposition of Public Comments and Technical Bases for Changes in the License Renewal Guidance Documents NUREG-1801and NUREG-1800 Manuscript Completed: April 2011 Date Published: April 2011

ABSTRACT This document is a knowledge management and knowledge transfer document associated with Revision 2 of NUREG-1801, Generic Aging Lessons Learned (GALL) Report, and Revision 2 to NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants. This document updates and combines NUREG-1832, Analysis of Public Comments on the Revised License Renewal Guidance Documents, and NUREG-1833, Technical Bases for Revision to the License Renewal Guidance Documents, (both published in 2005) into a single document. The NRC has decided to combine these two documents because their subject matter is so closely related that there was considerable redundancy when they were two separate documents.

This document fulfills two purposes. Firstly, the technical changes that were made when revising the guidance contained in NUREG-1801 are captured in this document, along with the technical basis for the changes. Changes to NUREG-1800, many of which derive from the changes to NUREG-1801, are also discussed in this document. Consequently, this document provides the underlying rationale that the NRC used to develop the current revisions to these guidance documents.

Secondly, this document contains the NRC staffs analysis of the public comments received on the Revision 2 drafts of NUREG-1801 and NUREG-1800. Public comment drafts of the GALL Report and the Standard Review Plan for License Renewal (SRP-LR) were published on May 14, 2010, with the public comment period expiring on July 2, 2010. The disposition of comments that were accepted by the NRC staff and used as the basis for instituting a change to either the GALL Report or the SRP-LR are detailed in this document. In addition, the public comments that did not result in a change to either NUREG are also dispositioned, and a technical basis for the staffs disagreement with these comments is presented.

April 2011 iii NUREG-1950

NUREG-1950 iv April 2011 TABLE OF CONTENTS Page Abstract ....................................................................................................................................iii List of Tables...........................................................................................................................vii Executive Summary .................................................................................................................xi List of Contributors................................................................................................................xiii Abbreviations ........................................................................................................................xvii I Introduction ................................................................................................................... I-1 I.1 Purpose and Organization of the Document ........................................................... I-1 I.2 Overview of Generic Changes from Revision 1 to Revision 2 ................................. I-2 I.3 Incorporation of Previously Approved NRC Staff Technical Positions ..................... I-4 I.4 Operating Experience ............................................................................................. I-5 II Revision 2 Changes to GALL Report, Rev. 1 and their Technical Bases ..................II-1 II.1 New AMR Items in Revision 2 of the GALL Report .................................................II-4 II.2 Changes to Existing AMR Items in Revision 2 of the GALL Report.........................II-4 II.3 Chapter IX - Definitions ..........................................................................................II-9 II.4 Chapter X - Time-Limited Aging Analyses (TLAAs)................................................II-9 II.5 Chapter XI - Aging Management Programs (AMPs).............................................II-10 II.6 Overview of Changes to GALL Chapter 1, Rev. 1 - Application of the ASME Code..........................................................................................................II-12 II.7 Explanation of Tables II-1 through II-13 ................................................................II-12 II.8 Explanation of Tables II-14 through II-25 ..............................................................II-12 III Revision 2 Changes to SRP-LR, Rev. 1 and their Technical Bases ..........................III-1 III.1 Chapter 1 - Administrative Information ..................................................................III-1 III.2 Chapter 2 - Scoping and Screening Methodology .................................................III-1 III.3 Chapter 3 - Aging Management Reviews (AMRs) Rollup Tables ..........................III-2 III.4 Chapter 4 - Time-Limited Aging Analyses (TLAAs) ...............................................III-3 III.5 SRP-LR Appendices A.1, A.2, and A.3 ..................................................................III-3 IV Analysis and Disposition of Public Comments on May 2010 Public Comment Draft, Revision 2......................................................................................... IV-1 IV.1 Public Comment Solicitation and Management..................................................... IV-1 April 2011 v NUREG-1950

IV.2 Disposition of Public Comments on the May 2010 Draft GALL Report, Rev. 2 ................................................................................................................... IV-2 IV.3 Disposition of Public Comments on the May 2010 Draft SRP-LR, Rev. 2 ............. IV-2 References ....................................................................................................................... IV-339 APPENDIX A: Crosswalk and Staff Technical Positions ............................................. A-1 A.1 GALL Report 2000-2005-2010 Crosswalk ............................................................. A-1 A.2 Staff Technical Positions...................................................................................... A-79 NUREG-1950 vi April 2011

LIST OF TABLES Page Table I-1. Crosswalk Between the Summary of Changes, Technical Bases, and Public Comment Tables in NUREG-1950 ..................................................................................... I-2 Table II-1. New AMR Items Added in Revision 2 of the GALL Report, Chapter II ...................II-14 Table II-2. New AMR Items Added in Revision 2 of the GALL Report, Chapter III ..................II-18 Table II-3. New AMR Items Added in Revision 2 of the GALL Report, Chapter IV..................II-28 Table II-4. New AMR Items Added in Revision 2 of the GALL Report, Chapter V...................II-61 Table II-5. New AMR Items Added in Revision 2 of the GALL Report, Chapter VII .................II-69 Table II-6. New AMR Items Added in Revision 2 of the GALL Report, Chapter VIII ..............II-106 Table II-7. Changes to Existing GALL Report Rev. 1 Chapter IV AMR Items for Reactor Vessel, Internals, and Reactor Coolant and Their Technical Bases ................................II-117 Table II-8. Changes to Existing GALL Report Rev. 1 Chapter V AMR Items for Engineered Safety Systems and Their Technical Bases ................................................II-180 Table II-9. Changes to Existing Rev. 1 Chapter VII AMR Items for Auxiliary Systems and Their Technical Bases ....................................................................................................II-199 Table II-10. Changes to Existing GALL Report Rev. 1 Chapter VIII AMR Items for Steam and Power Conversion Systems and Their Technical Bases ..........................................II-233 Table II-11. Changes to Existing GALL Report Rev. 1 Chapter II AMR Items for Containment and Their Technical Bases ........................................................................II-261 Table II-12. Changes to Existing GALL Report Rev. 1 Chapter III AMR Items for Structures and Component Supports and Their Technical Bases ...................................II-350 Table II-13. Changes to Existing GALL Report Rev. 1 Chapter VI AMR Items for Electrical Systems and Their Technical Bases ...............................................................II-382 Table II-14. Chapter IX.B - Revision 2 Differences from Chapter IX, GALL Report, Rev. 1 and Their Technical Bases .............................................................................................II-404 Table II-15. Chapter IX.C - Revision 2 Differences from Chapter IX, GALL Report, Rev. 1 and Their Technical Bases .............................................................................................II-406 Table II-16. Chapter IX.D - Revision 2 Differences from Chapter IX, GALL Report, Rev. 1 and Their Technical Bases .............................................................................................II-409 Table II-17. Chapter IX.E - Revision 2 Differences from Chapter IX, GALL Report, Rev. 1 and Their Technical Bases .............................................................................................II-411 Table II-18. Chapter IX.F - Revision 2 Differences from Chapter IX, GALL Report, Rev. 1 and Their Technical Bases .............................................................................................II-414 April 2011 vii NUREG-1950

Table II-19. Chapter IX.G - Revision 2 Differences from Chapter IX, GALL Report, Rev. 1 and Their Technical Bases .............................................................................................II-417 Table II-20. Revision 2 Differences from Chapter X, Time-Limited Aging Analyses, GALL Report, Rev. 1 and Their Technical Bases .....................................................................II-418 Table II-21. Revision 2 Differences from Chapter XI, Mechanical Aging Management Programs, GALL Report, Rev. 1 and Their Technical Bases ..........................................II-420 Table II-22. Revision 2 Differences from Chapter XI, Structural Aging Management Programs, GALL Report, Rev. 1 and Their Technical Bases ..........................................II-446 Table II-23. Revision 2 Differences from Chapter XI, Electrical Aging Management Programs, GALL Report, Rev. 1 and Their Technical Bases ..........................................II-453 Table II-24. Revision 2 Chapter I Differences from GALL Report, Rev. 1 and Their Technical Bases .............................................................................................................II-456 Table II-25. Revision 2 General BWR Vessel Internals Aging Management Programs Differences from GALL Report, Rev. 1 and Technical Bases .........................................II-457 Table III-1. Revision 2 Chapter 1 Differences from SRP-LR, Rev. 1 and Their Technical Bases ................................................................................................................................III-4 Table III-2. Revision 2 Chapter 2 Differences from SRP-LR, Rev. 1 and Their Technical Bases ................................................................................................................................III-4 Table III-3. Revision 2 Chapter 3.0 Differences from SRP-LR, Rev. 1 and Their Technical Bases ................................................................................................................III-5 Table III-4. Revision 2 Chapter 3.1 (Reactor Vessels, Internals, Coolant System)

Differences from SRP-LR, Rev. 1 and Their Technical Bases ...........................................III-6 Table III-5. Revision 2 Chapter 3.2 (Engineered Safety Features) Differences from SRP-LR, Rev. 1 and Their Technical Bases ..............................................................................III-6 Table III-6. Revision 2 Chapter 3.3 (Auxiliary Systems) Differences from SRP-LR, Rev. 1 and Their Technical Bases ................................................................................................III-6 Table III-7. Revision 2 Chapter 3.4 (Steam and Power Conversion Systems) Differences from SRP-LR, Rev. 1 and Their Technical Bases ..............................................................III-7 Table III-8. Revision 2 Chapter 3.5 (Structures and Components) Differences from SRP-LR, Rev. 1 and Their Technical Bases ..............................................................................III-7 Table III-9. Revision 2 Chapter 3.6 (Electrical and Instrumentation Controls) Differences from SRP-LR, Rev. 1 and Their Technical Bases ..............................................................III-7 Table III-10. Revision 2 Chapter 4.1 (Identification of TLAA) Differences from SRP-LR, Rev. 1 and Their Technical Bases .....................................................................................III-8 Table III-11. Revision 2 Chapter 4.2 (Neutron Irradiation Embrittlement) Differences from SRP-LR, Rev. 1 and Their Technical Bases ......................................................................III-8 NUREG-1950 viii April 2011

Table III-12. Revision 2 Chapter 4.3 (Metal Fatigue, Piping, and Components)

Differences from SRP-LR, Rev. 1 and Their Technical Bases .........................................III-10 Table III-13. Revision 2 Chapter 4.4 (Environmental Qualification of Electrical Equipment) Differences from SRP-LR, Rev. 1 and Their Technical Bases ......................III-11 Table III-14. Revision 2 Chapter 4.5 (Concrete Tendon Prestress) Differences from SRP-LR, Rev. 1 and Their Technical Bases ............................................................................III-12 Table III-15. Revision 2 Chapter 4.6 (Metal Containment, Liner Plate, Penetrations Fatigue) Differences from SRP-LR, Rev. 1 and Their Technical Bases ...........................III-12 Table III-16. Revision 2 Chapter 4.7 (Plant-Specific TLAA) Differences from SRP-LR, Rev. 1 and Their Technical Bases ...................................................................................III-12 Table III-17. Revision 2 Appendix Differences from SRP-LR, Rev. 1 and Their Technical Bases ..............................................................................................................................III-12 Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number ..................................................................... IV-3 Table IV-2. Analysis and Disposition of Public Comments on Chapter I, May 2010 Public Comment Draft GALL Report, Rev. 2 ............................................................................. IV-22 Table IV-3. Analysis and Disposition of Public Comments on Chapter II, May 2010 Public Comment Draft GALL Report, Rev. 2 ............................................................................. IV-23 Table IV-4. Analysis and Disposition of Public Comments on Chapter III, May 2010 Public Comment Draft GALL Report, Rev. 2 .................................................................. IV-26 Table IV-5. Analysis and Disposition of Public Comments on Chapter IV, May 2010 Public Comment Draft GALL Report, Rev. 2 .................................................................. IV-30 Table IV-6. Analysis and Disposition of Public Comments on Chapter V, May 2010 Public Comment Draft GALL Report, Rev. 2 .................................................................. IV-60 Table IV-7. Analysis and Disposition of Public Comments on Chapter VI, May 2010 Public Comment Draft GALL Report, Rev. 2 .................................................................. IV-65 Table IV-8. Analysis and Disposition of Public Comments on Chapter VII, May 2010 Public Comment Draft GALL Report, Rev. 2 .................................................................. IV-68 Table IV-9. Analysis and Disposition of Public Comments on Chapter VIII, May 2010 Public Comment Draft GALL Report, Rev. 2 .................................................................. IV-82 Table IV-10. Analysis and Disposition of Public Comments on Chapter IX, May 2010 Public Comment Draft GALL Report, Rev. 2 .................................................................. IV-83 Table IV-11. Analysis and Disposition of Public Comments on Chapter X TLAAs, May 2010 Public Comment Draft GALL Report, Rev. 2 .......................................................... IV-86 Table IV-12. Analysis and Disposition of Public Comments on Chapter XI Mechanical AMPs, May 2010 Public Comment Draft GALL Report, Rev. 2 ....................................... IV-91 April 2011 ix NUREG-1950

Table IV-13. Analysis and Disposition of Public Comments on Chapter XI Structural AMPs, May 2010 Public Comment Draft GALL Report, Rev. 2 ..................................... IV-277 Table IV-14. Analysis and Disposition of Public Comments on Chapter XI Electrical AMPs, May 2010 Public Comment Draft GALL Report, Rev. 2..................................... IV-296 Table IV-15. Analysis and Disposition of Public Comments on General BWR Vessel Internals Aging Management Programs, May 2010 Public Comment Draft GALL Report, Rev. 2 .............................................................................................................. IV-305 Table IV-16. Analysis and Disposition of Chapter 1 Public Comments on May 2010 Public Comment Draft SRP-LR, Rev. 2 ........................................................................ IV-309 Table IV-17. Analysis and Disposition of Chapter 2 Public Comments on May 2010 Public Comment Draft SRP-LR, Rev. 2 ........................................................................ IV-310 Table IV-18. Analysis and Disposition of Chapter 3 Public Comments on May 2010 Public Comment Draft SRP-LR, Rev. 2 ........................................................................ IV-314 Table IV-19. Analysis and Disposition of Chapter 4 Public Comments on May 2010 Public Comment Draft SRP-LR, Rev. 2 ........................................................................ IV-325 Table IV-20. Analysis and Disposition of Appendices Public Comments on May 2010 Public Comment Draft SRP-LR, Rev. 2 ........................................................................ IV-338 Table A-1. Relationship of Containment Structures IDs in GALL Report, Chapter II ................ A-2 Table A-2. Relationship of Structures and Component Supports IDs in GALL Report, Chapter III ......................................................................................................................... A-6 Table A-3. Relationship of Reactor Vessel, Internals, and Reactor Coolant (RCS)

System IDs in GALL Report, Chapter IV.......................................................................... A-22 Table A-4. Relationship of Engineered Safety Features (ESF) System IDs in GALL Report, Chpt. V ............................................................................................................... A-32 Table A-5. Relationship of Electrical Components System IDs in GALL Report, Chapter VI .................................................................................................................................... A-44 Table A-6. Relationship of Auxiliary System IDs in GALL Report, Chpt. VII ........................... A-45 Table A-7. Relationship of Steam and Power Conversion (SPC) System IDs in GALL Report, Chpt VIII ............................................................................................................. A-68 Table A-8. Summary of Changes to the Updated License Renewal Documents as a Result of License Renewal Interim Staff Guidance (LR-ISG) ........................................... A-79 NUREG-1950 x April 2011

EXECUTIVE

SUMMARY

Public Comment Overview On May 18, 2010 (75 FR 27838), the Nuclear Regulatory Commission (NRC) announced the issuance and availability of the following license renewal guidance documents (LRGDs) for public comment:

y Draft Standard Review Plan for Review of License Renewal [SRP-LR] Applications for Nuclear Power Plants (NUREG-1800), Revision 2 y Draft Generic Aging Lessons Learned (GALL) Report (NUREG-1801), Revision 2 These LRGDs described methods acceptable to the staff for implementing the license renewal rule, Title 10 of the Federal Code of Regulations (CFR)(10 CFR Part 54), as well as techniques used by the staff in evaluating applications for nuclear power plant (NPP) license renewals. The draft revisions incorporated changes that reflected past precedents and other lessons learned since Revision 1 of the LRGDs, published in 2005.

In addition to issuing the draft revisions of these LRGDs for formal public comment, the staff held several public meetings with stakeholders to discuss the content of the draft LRGDs and subsequent comments on these draft documents.

The staff took into consideration the comments received as a result of the formal solicitation described above and incorporated its dispositions into the December 2010 versions of the LRGDs. This report, NUREG-1950, provides the evaluation and disposition of public comments received by the NRC on the draft revisions of the LRGDs.

Technical Bases Overview This report, NUREG-1950, provides a summary of changes and a synopsis of the bases for these changes made as part of Revision 2 to the SRP-LR, and Revision 2 to the GALL Report.

These changes include those that were initiated by NRC staff as well as the changes made in response to public comments, as appropriate. This document provides the underlying rationale that the NRC used in developing the Revision 2 LRGDs. Furthermore, Appendix A of this document includes a one-to-one correlation between the Aging Management Review (AMR) line-items in GALL Rev. 0, Rev.1, and Rev. 2 for easy cross-reference.

April 2011 xi NUREG-1950

IV ANALYSIS AND DISPOSITION OF PUBLIC COMMENTS ON MAY 2010 PUBLIC COMMENT DRAFT, REVISION 2 IV.1 Public Comment Solicitation and Management The NRC issued a public comment draft of NUREG-1800 and -1801, Rev. 2 on April 1, 2010.

The Federal Register Notice (FR Vol. 75, No. 95 page 27838 - 27840), published on May 18, 2010, began a 45-day public comment period. In addition, the NRC conducted a public workshop from May 26-28, 2010 at its Rockville, MD headquarters to initiate a dialogue with the public and to introduce them to some of the major changes between Revisions 1 and 2 of the guidance documents. The purpose of the workshop was to provide:

y an opportunity for the staff to inform the public about the draft GALL and SRP-LR NUREGs y an opportunity for an exchange of information about the draft NUREGs y an opportunity for stakeholders to ask questions about the draft NUREGs y a forum for stakeholders to provide informal feedback on the drafts The staff was particularly interested in comments that addressed the safety review, effectiveness, and efficiency of the license renewal process. Formal comments on the draft NUREGs were to be provided through means identified in the Federal Register Notice (e.g.,

written letter, e-mail, fax, and web forms) and were not accepted during the workshop. The workshop was not intended as a forum to resolve comments on the draft NUREGs. The staff anticipated that some topics would not be discussed fully due to time limitations. The staff also conducted focused public meetings following the close of the comment period for in-depth technical discussions of some AMPs, particularly XI.M41.

The staff previously made available to the public a draft preliminary version of portions of the guidance documents on December 19, 2009. These preliminary drafts were also discussed at a public meeting held from January 4-6, 2010 at NRC headquarters. All public comments were put into a public comments database developed specifically for the purpose of managing and dispositioning public comments. The database allowed the input of the comments, identification of the commenter and their affiliation, acceptance or rejection of comments recommended actions, and the technical basis of each decision. Each comment in the database received a unique comment number related to the document and chapter/subchapter or AMR Item to which it applied. This unique number can be used to identify and track comments, their disposition, and the resulting changes throughout this guidance document in the appropriate tables.

Table IV-1 presents a list of commenters, their affiliation, their reference number, and the ADAMS Accession Number for each comment. The first column contains a comment number that allows each comment to be cross-referenced in various tables throughout this document.

Over 500 public comments were received on the SRP-LR and GALL Report.

Any changes to the LRGDs that have a technical basis that states that the change is editorial in nature, simple clarification, or the correction of typographical errors does not constitute a notable technical change and will not be captured in the Tables of Section II or III in this document. For a number of public comments, the NRC staff took the liberty to clarify and/or paraphrase the comment. Those comments are denoted with a [] around the text which the staff clarified and/or paraphrased.

April 2011 IV-1 NUREG-1950

IV.2 Disposition of Public Comments on the May 2010 Draft GALL Report, Rev. 2 All of the public comments on the May 2010 Public Comment Draft, GALL Report, Rev. 2 that were received as a result of the public comment period are presented in Table IV-2 through Table IV-15 below. The comments are divided by GALL Report chapter; Chapter XI is subdivided into mechanical, structural, and electrical AMP comments. Each comment has a unique comment number. The comment, along with any rationale or justification provided by the commenter, is summarized. The disposition of each comment is provided, particularly whether the comment was accepted by NRC staff and resulted in a change to the GALL Report, Rev. 1, or whether the comment was rejected and did not cause any changes to the GALL Report.

Finally, the technical basis for each comment disposition is provided, explaining either why the comment was rejected, or why the changes prompted by the comments were implemented.

The summary of the comments for each GALL chapter, their dispositions, and the technical basis for the dispositions are presented in Table IV-2 through Table IV-15.

IV.3 Disposition of Public Comments on the May 2010 Draft SRP-LR, Rev. 2 All of the public comments on the May 2010 Public Comment Draft SRP-LR, Rev. 2 that were received as a result of the public comment period are presented in Table IV-16 through Table IV-20 below. Each comment has a unique comment number and references the comment number provided by the commenter. The comment, along with any rationale or justification provided by the commenter, is summarized. The disposition of each comment is provided, particularly whether the comment was accepted by NRC staff and resulted in a change to the SRP-LR, Rev. 1, or whether the comment was rejected and did not cause any changes to the SRP-LR. Finally, the technical basis for each comment disposition is provided, explaining either why the comment was rejected or why the changes were implemented.

The summary of the comments for each SRP-LR chapter, their dispositions, and the technical basis for the dispositions are presented in Table IV-16 through Table IV-20.

NUREG-1950 IV-2 April 2011

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

Boyd Taylor, Pacific Northwest National Laboratory (PNNL) 6/8/10 1 132 ML101610407 Omesh Chopra 6/10/2010 1 (SRP) 130 ML101660084 2 (SRP) 131 ML101660084 Nuclear Energy Institute 6/30/2010 X.M1-1 133 ML101830328 X.M1-2 134 ML101830328 X.M1-3 135 ML101830328 X.M1-4 136 ML101830328 X.M1-5 137 ML101830328 X.M1-6 138 ML101830328 X.M1-7 139 ML101830328 X.M1-8 140 ML101830328 X.M1-9 895 ML101830328 X.M1-10 142 ML101830328 X.M1-11 143 ML101830328 XI.M2-1 896 ML101830328 XI.M2-2 897 ML101830328 XI.M2-3 1037 ML101830328 XI.M3-1 1036 ML101830328 XI.M4-1 149 ML101830328 XI.M6-1 150 ML101830328 XI.M6-2 151 ML101830328 XI.M6-3 152 ML101830328 XI.M7-1 153 ML101830328 XI.M7-2 154 ML101830328 XI.M9-1 155 ML101830328 XI.M9-2 156 ML101830328 XI.M9-3 157 ML101830328 XI.M9-4 777 ML101830328 April 2011 IV-3 NUREG-1950

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

XI.M9-5 778 ML101830328 XI.M9-6 779 ML101830328 XI.M9-7 780 ML101830328 XI.M11B-1 158 ML101830328 XI.M11B-2 159 ML101830328 XI.M11B-3 160 ML101830328 XI.M11B-4 161 ML101830328 XI.M12-1 162 ML101830328 XI.M12-2 163 ML101830328 XI.M12-3 164 ML101830328 XI.M16A-1 165 ML101830328 XI.M16A-2 166 ML101830328 XI.M16A-3 167 ML101830328 XI.M17-1 168 ML101830328 XI.M17-2 169 ML101830328 XI.M18-1 170 ML101830328 XI.M18-2 171 ML101830328 XI.M18-3 172 ML101830328 XI.M18-4 173 ML101830328 XI.M18-5 174 ML101830328 XI.M18-6 175 ML101830328 XI.M19-1 1038 ML101830328 XI.M19-2 1039 ML101830328 XI.M22-1 1035 ML101830328 XI.M24-1 179 ML101830328 XI.M24-2 180 ML101830328 XI.M24-3 181 ML101830328 XI.M26-1 182 ML101830328 XI.M26-2 183 ML101830328 XI.M26-3 184 ML101830328 XI.M26-4 185 ML101830328 XI.M30-1 186 ML101830328 XI.M30-2 187 ML101830328 NUREG-1950 IV-4 April 2011

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

XI.M30-3 188 ML101830328 XI.M31-1 189 ML101830328 XI.M32-1 190 ML101830328 XI.M35-1 191 ML101830328 XI.M35-2 192 ML101830328 XI.M35-3 193 ML101830328 XI.M35-4 194 ML101830328 XI.M36-1 971 ML101830328 XI.M36-2 972 ML101830328 XI.M36-4 197 ML101830328 XI.M38-1 198 ML101830328 XI.M39-1 898 ML101830328 XI.M40-1 200 ML101830328 XI.M40-2 201 ML101830328 XI.M40-3 202 ML101830328 XI.S1-1 899 ML101830328 XI.S1-2 900 ML101830328 XI.S1-3 901 ML101830328 XI.S1-4 902 ML101830328 XI.S1-5 903 ML101830328 XI.S1-6 208 ML101830328 XI.S3-1 904 ML101830328 XI.S3-2 210 ML101830328 XI.S3-3 906 ML101830328 XI.S5-1 907 ML101830328 XI.S6-1 908 ML101830328 XI.S6-2 214 ML101830328 XI.S6-3 909 ML101830328 XI.S7-1 910 ML101830328 XI.S7-2 911 ML101830328 XI.S7-3 912 ML101830328 XI.S8-1 913 ML101830328 1 298 ML101830328 April 2011 IV-5 NUREG-1950

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

2 299 ML101830328 3 301 ML101830328 4 306 ML101830328 5 311 ML101830328 6 313 ML101830328 7 316 ML101830328 8 318 ML101830328 10 319 ML101830328 11 321 ML101830328 12 326 ML101830328 13 338 ML101830328 14 350 ML101830328 15 351 ML101830328 16 353 ML101830328 17 356 ML101830328 18 (SRP) 358 ML101830328 19 (SRP) 360 ML101830328 20 (SRP) 361 ML101830328 21 (SRP) 362 ML101830328 22 (SRP) 363 ML101830328 23 (SRP) 364 ML101830328 24 (SRP) 365 ML101830328 25 (SRP) 366 ML101830328 4.2.2.1.1.2 (SRP) 511 ML101830328 4.2.2.1.4.1 (SRP) 512 ML101830328 4.2.3.1.1 (SRP) 513 ML101830328 4.2.3.1.1.2 (SRP) 514 ML101830328 4.2.3.1.3 (SRP) 515 ML101830328 4.2.3.1.3.1 (SRP) 516 ML101830328 4.3.2 (SRP) 517 ML101830328 4.3.1 (SRP) 518 ML101830328 4.3.2.1.1.3 (SRP) 519 ML101830328 4.3.2.1.3 (SRP) 520 ML101830328 NUREG-1950 IV-6 April 2011

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

4.3.2.1.4 (SRP) 521 ML101830328 4.3.2.1.5.3 (SRP) 522 ML101830328 4.3.3.1.1.2 (SRP) 523 ML101830328 Nuclear Energy Institute 6/30/2010 VI.A-1 256 ML101830328 VI.A-2 257 ML101830328 VI.A-3 258 ML101830328 XI.E1-1 259 ML101830328 XI.E1-2 260 ML101830328 XI.E1-3 261 ML101830328 XI.E1-4 262 ML101830328 XI.E1-5 263 ML101830328 XI.E1-6 264 ML101830328 XI.E2-1 265 ML101830328 XI.E3-1 266 ML101830328 XI.E3-4 267 ML101830328 XI.E3-5 268 ML101830328 XI.E3-6 269 ML101830328 XI.E3-7 270 ML101830328 XI.E3-8 277 ML101830328 XI.E3-9 278 ML101830328 XI.E3-10 279 ML101830328 XI.E3-13 281 ML101830328 XI.E3-14 282 ML101830328 XI.E4-1 283 ML101830328 XI.E4-2 284 ML101830328 XI.E4-3 285 ML101830328 XI.E4-4 286 ML101830328 XI.E4-5 287 ML101830328 XI.E4-6 288 ML101830328 XI.E4-7 289 ML101830328 XI.E5-1 290 ML101830328 April 2011 IV-7 NUREG-1950

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

XI.E5-2 291 ML101830328 XI.E5-3 292 ML101830328 XI.E5-4 293 ML101830328 XI.E6-1 294 ML101830328 XI.E6-2 295 ML101830328 XI.E6-3 296 ML101830328 XI.E6-4 297 ML101830328 SRP 2.1.3-1 241 ML101830328 SRP 2.1.3-2 242 ML101830328 SRP 2.5-1 243 ML101830328 SRP 2.5-2 244 ML101830328 SRP 2.5-3 245 ML101830328 SRP 2.5-4 246 ML101830328 SRP 3.0-1 247 ML101830328 SRP 3.0-2 248 ML101830328 SRP 3.0-3 249 ML101830328 SRP 3.0-4 250 ML101830328 SRP 3.0-5 251 ML101830328 SRP 3.0-14 252 ML101830328 SRP 3.0-16 253 ML101830328 SRP 3.6-1 254 ML101830328 SRP 3.6-2 255 ML101830328 Electric Power Research Institute BWRVIP 6/29/2010 1 916 ML101830255 2 917 ML101830255 3 918 ML101830255 XI.M2-1 920 ML101830255 XI.M2-2 921 ML101830255 XI.M2-3 922 ML101830255 XI.M2-4 923 ML101830255 XI.M4-1 374 ML101830255 NUREG-1950 IV-8 April 2011

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

XI.M4-2 375 ML101830255 XI.M4-3 376 ML101830255 XI.M6-1 377 ML101830255 XI.M7-1 378 ML101830255 XI.M7-2 379 ML101830255 XI.M8-1 380 ML101830255 XI.M8-2 381 ML101830255 XI.M8-3 382 ML101830255 XI.M8-4 383 ML101830255 XI.M9-1 384 ML101830255 XI.M9-2 385 ML101830255 XI.M9-3 386 ML101830255 XI.M9-4 387 ML101830255 XI.M9-5A 388 ML101830255 XI.M9-5B 1019 ML101830255 XI.M9-7B 1020 ML101830255 XI.M9-6 389 ML101830255 XI.M9-7A 390 ML101830255 XI.M9-8 391 ML101830255 XI.M9-9 392 ML101830255 XI.M9-10 393 ML101830255 XI.M9-11 394 ML101830255 XI.M9-12 395 ML101830255 XI.M9-13 396 ML101830255 XI.M9-14 397 ML101830255 XI.M9-15 398 ML101830255 XI.M9-16 399 ML101830255 XI.M9-17 400 ML101830255 XI.M9-18A 401 ML101830255 XI.M9-18B 1021 ML101830255 XI.M9-19A 402 ML101830255 XI.M9-19B 1022 ML101830255 XI.M9-19C 1023 ML101830255 April 2011 IV-9 NUREG-1950

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

XI.M9-20 403 ML101830255 Pilgrim Watch 7/1/2010 XI.M41-PW1 405 ML101880267 XI.M41-PW2 410 ML101880267 XI.M41-PW3 411 ML101880267 XI.M41-PW4 504 ML101880267 XI.M41-PW5 929 ML101880267 XI.M41-PW6 930 ML101880267 XI.M41-PW7 931 ML101880267 XI.M41-PW8 932 ML101880267 XI.M41-PW9 933 ML101880267 XI.M41-PW10 934 ML101880267 XI.M41-PW11 935 ML101880267 XI.M41-PW12 936 ML101880267 XI.M41-PW13 937 ML101880267 XI.M41-PW14 938 ML101880267 XI.M41-PW15 939 ML101880267 XI.M41-PW16 940 ML101880267 XI.M41-PW17 941 ML101880267 XI.M41-PW18 942 ML101880267 Supplemental Pilgrim Watch 7/1/2010 P1 (Ray Shadis, New 1112 ML102420742 England Coalition)

P2 (John H Fitzgerald, III) 1119 ML102420742 PW1 (John H Fitzgerald, III) 1123 ML102420742 P3 (John H Fitzgerald, III) 1125 ML102420742 PW4 (John H Fitzgerald, III) 1128 ML102420742 PW5 (John H Fitzgerald, III) 1126 ML102420742 PW5(2) (John H Fitzgerald, 1129 ML102420742 III)

PW6 (John H Fitzgerald, III) 1143 ML102420742 P7 (John H Fitzgerald, III) 1146 ML102420742 NUREG-1950 IV-10 April 2011

Nuclear Energy Institute 7/1/2010 1 943 ML101880269 2 944 ML101880269 3 863 ML101880269 4 864 ML101880269 5 945 ML101880269 6 866 ML101880269 7 867 ML101880269 8 868 ML101880269 9 869 ML101880269 10 870 ML101880269 11 871 ML101880269 12 872 ML101880269 13 873 ML101880269 14 874 ML101880269 15 876 ML101880269 16 877 ML101880269 17 946 ML101880269 18 879 ML101880269 19 880 ML101880269 20 947 ML101880269 21 881 ML101880269 22 882 ML101880269 23 883 ML101880269 24 884 ML101880269 25 885 ML101880269 26 886 ML101880269 27 887 ML101880269 28 888 ML101880269 29 948 ML101880269 30 949 ML101880269 31 950 ML101880269 32 951 ML101880269 33 952 ML101880269 34 953 ML101880269 April 2011 IV-11 NUREG-1950

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

35 954 ML101880269 36 955 ML101880269 37 956 ML101880269 38 957 ML101880269 Comment 39 (SRP) 837 ML101880269 Comment 40 (SRP) 958 ML101880269 Comment 41 (SRP) 959 ML101880269 Comment 42 (SRP) 960 ML101880269 Comment 43 (SRP) 961 ML101880269 Comment 44 (SRP) 962 ML101880269 Comment 45 (SRP) 963 ML101880269 Comment 46 (SRP) 964 ML101880269 Comment 47 (SRP) 965 ML101880269 VII.K-x 434 ML101880269 VII.C1-x 505 ML101880269 VII.C1-x 430 ML101880269 VII.C2-x, VII.H2-x 437 ML101880269 VII.C1-x 438 ML101880269 V.E-x, VII.I-x, VIII.H-x 439 ML101880269 VII.C2-x, VII.H2-x, VIII.E-x 442 ML101880269 VII.C1-x 445 ML101880269 VII.C2-x 446 ML101880269 IV.E-x, V.F-x, VII.J-x, VIII.I-x 447 ML101880269 V.E-x, VII.I-x, VIII.H-x 451 ML101880269 V.E-x, VII.I-x, VIII.H-x 454 ML101880269 V.E-x, VII.I-x 457 ML101880269 VII.C1-x, VII.F2-x, VIII.G-x 459 ML101880269 III.B2-x 462 ML101880269 VII.J-x 463 ML101880269 VII.E5 506 ML101880269 IX.D 507 ML101880269 Nuclear Energy Institute 6/7/2010 (Comments on May 2010 draft XI.M41)

NUREG-1950 IV-12 April 2011

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

XI.M41-1 889 ML101610406 XI.M41-2 890 ML101610406 XI.M41-3 106 ML101610406 XI.M41-4 891 ML101610406 XI.M41-5 892 ML101610406 XI.M41-6 893 ML101610406 XI.M41-7 894 ML101610406 XI.M41-8 111 ML101610406 XI.M41-9 112 ML101610406 XI.M41-10 113 ML101610406 XI.M41-11 114 ML101610406 XI.M41-12 115 ML101610406 XI.M41-13 116 ML101610406 XI.M41-14 117 ML101610406 XI.M41-15 118 ML101610406 XI.M41-16 119 ML101610406 XI.M41-17 120 ML101610406 XI.M41-18 121 ML101610406 XI.M41-19 122 ML101610406 XI.M41-20 123 ML101610406 Nuclear Energy Institute 7/1/2010 (comments on June 18, 2010 XI.M41 draft)

XI.M41-1 508 ML101880269 XI.M41-2 509 ML101880269 XI.M41-3 966 ML101880269 XI.M41-4 967 ML101880269 XI.M41-5 968 ML101880269 XI.M41-6 969 ML101880269 XI.M41-7 1191 ML101880269 XI.M41-8 1192 ML101880269 XI.M41-9 1193 ML101880269 XI.M41-10 475 ML101880269 XI.M41-11 1194 ML101880269 April 2011 IV-13 NUREG-1950

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

XI.M41-12 1195 ML101880269 XI.M41-13 478 ML101880269 XI.M41-14 1196 ML101880269 XI.M41-15 1197 ML101880269 XI.M41-16 1198 ML101880269 XI.M41-17 1199 ML101880269 XI.M41-18 1200 ML101880269 XI.M41-19 970 ML101880269 XI.M41-20 1201 ML101880269 XI.M41-21 1202 ML101880269 XI.M41-22 487 ML101880269 XI.M41-23 488 ML101880269 XI.M41-24 489 ML101880269 XI.M41-25 490 ML101880269 XI.M41-26 491 ML101880269 Nuclear Energy Institute 8/30/2010 (supplemental comments on Aug 2010 XI.M41 draft ML102320585)

XI.M41-3 (sup) 1154 ML102420732 XI.M41-23 (sup) 1085 ML102420732 XI.M41-28 (sup) 1087 ML102420732 Electric Power Research Institute PWR Internals 7/1/2010 1 973 ML101880266 2 974 ML101880266 3 975 ML101880266 4 976 ML101880266 5 977 ML101880266 6 978 ML101880266 7 979 ML101880266 8 980 ML101880266 9 981 ML101880266 10 982 ML101880266 11 983 ML101880266 NUREG-1950 IV-14 April 2011

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

12 984 ML101880266 13 985 ML101880266 14 986 ML101880266 15 987 ML101880266 16 988 ML101880266 17 989 ML101880266 18 990 ML101880266 19 991 ML101880266 20 992 ML101880266 21 993 ML101880266 22 994 ML101880266 23 995 ML101880266 24 996 ML101880266 25 997 ML101880266 26 998 ML101880266 27 999 ML101880266 28 1000 ML101880266 29 1001 ML101880266 30 1002 ML101880266 31 1003 ML101880266 32 1004 ML101880266 33 1005 ML101880266 34 1006 ML101880266 35 1007 ML101880266 36 1008 ML101880266 37 1009 ML101880266 38 1010 ML101880266 39 1011 ML101880266 40 1012 ML101880266 41 1013 ML101880266 42 1014 ML101880266 43 1015 ML101880266 44 1016 ML101880266 April 2011 IV-15 NUREG-1950

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

PWR Owners Group XI.M31 492 ML101890552 XI.M31-3 493 ML101890552 XI.M31-4 494 ML101890552 XI.M31-5 495 ML101890552 XI.M31-7 496 ML101890552 XI.M31-10 497 ML101890552 XI.M31-REF 498 ML101890552 Yogen Garud 6/30/2010 1 524 ML101880265 2 525 ML101880265 3 526 ML101880265 4 527 ML101880265 Paul Blanch 8/24/2010 XI.M41-1(a) 1152 ML102371265 XI.M41-1(b) 1232 ML102371265 XI.M41-1(c) 1203 ML102371265 XI.M41-1(d) 1204 ML102371265 XI.M41-1(e) 1205 ML102371265 XI.M41-1(f) 1206 ML102371265 XI.M41-2(a) 1153 ML102371265 XI.M41-2(b) 1207 ML102371265 XI.M41-2(c) 1208 ML102371265 XI.M41-2(d) 1209 ML102371265 XI.M41-3(a) 1231 ML102371265 XI.M41-3(b) 1210 ML102371265 XI.M41-3(c) 1211 ML102371265 XI.M41-3(d) 1212 ML102371265 XI.M41-3(e) 1213 ML102371265 XI.M41-3(f) 1214 ML102371265 XI.M41-4(a) 1156 ML102371265 NUREG-1950 IV-16 April 2011

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

XI.M41-4(b) 1215 ML102371265 XI.M41-4(c) 1216 ML102371265 XI.M41-5(a) 1159 ML102371265 XI.M41-5(b) 1217 ML102371265 XI.M41-5(c) 1218 ML102371265 XI.M41-6(a) 1161 ML102371265 XI.M41-6(b) 1219 ML102371265 XI.M41-6(c) 1220 ML102371265 XI.M41-7(a) 1221 ML102371265 XI.M41-7(b) 1163 ML102371265 XI.M41-8(a) 1222 ML102371265 XI.M41-8(b) 1164 ML102371265 XI.M41-8(c) 1223 ML102371265 XI.M41-9(a) 1165 ML102371265 XI.M41-9(b) 1229 ML102371265 XI.M41-10 1166 ML102371265 XI.M41-11 1167 ML102371265 XI.M41-12 1168 ML102371265 XI.M41-13 1169 ML102371265 XI.M41-14 1170 ML102371265 XI.M41-15 1171 ML102371265 XI.M41-16(a) 1172 ML102371265 XI.M41-16(b) 1224 ML102371265 XI.M41-17 1173 ML102371265 XI.M41-18 1174 ML102371265 XI.M41-19(a) 1175 ML102371265 XI.M41-19(b) 1225 ML102371265 XI.M41-20(a) 1176 ML102371265 XI.M41-20(b) 1226 ML102371265 XI.M41-21(a) 1177 ML102371265 XI.M41-21(b) 1227 ML102371265 XI.M41-22 1178 ML102371265 XI.M41-23 1179 ML102371265 April 2011 IV-17 NUREG-1950

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

XI.M41-24 1180 ML102371265 Paul Blanch 8/30/2010 Comment 1 1181 ML102420706 Comment 2 1182 ML102420706 Comment 3 1183 ML102420706 Comment 4 1184 ML102420706 Comment 5 1185 ML102420706 Comment 6 1186 ML102420706 Comment 7 1187 ML102420706 Comment 8 1188 ML102420706 Nuclear Energy Institute - Preliminary 8/6/2010 Comment 1 1092 ML102180192 Comment 2 1095 ML102180192 Comment 3 1097 ML102180192 Comment 4 1099 ML102180192 Comment 5 1101 ML102180192 Structural Integrity Associates 8/20/10 Comment 1 1155 ML102350027 Comment 2 1157 ML102350027 Comment 3 1158 ML102350027 Comment 4 1160 ML102350027 Comment 5 1162 ML102350027 Pilgrim Watch 8/24/10 XI.M41-PW1 1079 ML102371274 XI.M41-PW2 1080 ML102371274 XI.M41-PW3 1081 ML102371274 XI.M41-PW4 1083 ML102371274 XI.M41-PW5 1084 ML102371274 XI.M41-PW6 1086 ML102371274 XI.M41-PW7 1088 ML102371274 NUREG-1950 IV-18 April 2011

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

XI.M41-PW8 1089 ML102371274 XI.M41-PW8(2) 1090 ML102371274 XI.M41-PW9 1091 ML102371274 XI.M41-PW10 1093 ML102371274 XI.M41-PW11 1094 ML102371274 XI.M41-PW12 1096 ML102371274 XI.M41-PW13 1098 ML102371274 XI.M41-PW14 1100 ML102371274 XI.M41-PW15 1102 ML102371274 XI.M41-PW16 1103 ML102371274 XI.M41-PW17 1105 ML102371274 XI.M41-PW18 1106 ML102371274 XI.M41-PW19 1107 ML102371274 XI.M41-PW20 1108 ML102371274 XI.M41-PW21 1109 ML102371274 XI.M41-PW22 1110 ML102371274 XI.M41-PW23 1111 ML102371274 XI.M41-PW24 1113 ML102371274 XI.M41-PW25 1134 ML102371274 XI.M41-PW26 1115 ML102371274 XI.M41-PW27 1116 ML102371274 XI.M41-PW28 1117 ML102371274 XI.M41-PW29 1118 ML102371274 XI.M41-PW30 1120 ML102371274 XI.M41-PW31 1121 ML102371274 XI.M41-PW32 1122 ML102371274 XI.M41-PW33 1124 ML102371274 XI.M41-PW34 1190 ML102371274 XI.M41-PW35 1127 ML102371274 XI.M41-PW36 1130 ML102371274 XI.M41-PW37 1131 ML102371274 XI.M41-PW38 1132 ML102371274 XI.M41-PW39 1133 ML102371274 April 2011 IV-19 NUREG-1950

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

XI.M41-PW40 1114 ML102371274 XI.M41-PW41 1135 ML102371274 XI.M41-PW42 1136 ML102371274 XI.M41-PW43 1137 ML102371274 XI.M41-PW44 1138 ML102371274 XI.M41-PW45 1139 ML102371274 XI.M41-PW46 1140 ML102371274 XI.M41-PW47 1141 ML102371274 XI.M41-PW48 1142 ML102371274 XI.M41-PW49 1144 ML102371274 XI.M41-PW50 1145 ML102371274 XI.M41-PW51 1147 ML102371274 XI.M41-PW52 1148 ML102371274 XI.M41-PW53 1149 ML102371274 XI.M41-PW54 1150 ML102371274 XI.M41-PW55 1151 ML102371274 Nuclear Energy Institute 8/20/10 XI.M41-1 1051 ML102320585 XI.M41-2 1053 ML102320585 XI.M41-3 1054 ML102320585 XI.M41-4 1055 ML102320585 XI.M41-5 1056 ML102320585 XI.M41-6 1057 ML102320585 XI.M41-7 1058 ML102320585 XI.M41-8 1059 ML102320585 XI.M41-9 1060 ML102320585 XI.M41-10 1061 ML102320585 XI.M41-10(2) 1062 ML102320585 XI.M41-11 1063 ML102320585 XI.M41-12 1064 ML102320585 XI.M41-13 1065 ML102320585 XI.M41-14 1066 ML102320585 NUREG-1950 IV-20 April 2011

Table IV-1. Identification of Public Comments on May 2010 Draft GALL Report, Rev. 2, Originator, and ADAMS Accession Number Commenter Ref. No. Comment No. ADAMS Accession No.

XI.M41-15 1067 ML102320585 XI.M41-16 1068 ML102320585 XI.M41-17 1069 ML102320585 XI.M41-18 1070 ML102320585 XI.M41-19 1071 ML102320585 XI.M41-20 1072 ML102320585 XI.M41-21 1073 ML102320585 XI.M41-22 1074 ML102320585 XI.M41-23 1075 ML102320585 XI.M41-24 1076 ML102320585 XI.M41-25 1077 ML102320585 XI.M41-26 1078 ML102320585 Beyond Nuclear 7/2/2010 XI.M41-1 1228 ML101930270 Structural Integrity Associates, Inc., Steve Biagiotti XI.M41 1230 ML102500311 April 2011 IV-21 NUREG-1950