RAI Regarding Relief Request RR-12-02, Relief Request Concerning Full Structural Weld Overlay of Dissimilar Metal Welds on the Lower Cold Leg Letdown Nozzel and Safe End
ML12340A274
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/14/2012
From: Peter Bamford
Plant Licensing Branch 1
To: Pacilio M
Exelon Nuclear
Bamford P NRR/DORL/LPL1-2 301-415-2388
References
TAC ME9818
Download: ML12340A274 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 14, 2012 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST RR-12-02, RELIEF REQUEST CONCERNING FULL STRUCTURAL WELD OVERLAY OF DISSIMILAR METAL WELDS ON THE LOWER COLD LEG LETDOWN NOZZLE AND SAFE-END (TAC NO. ME9818)

Dear Mr. Pacilio:

By letter dated October 18, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12292A584), Exelon Generation Company, LLC (Exelon, the licensee) submitted a relief request proposing to perform a weld overlay on the lower cold leg letdown nozzle dissimilar metal welds and Alloy 600 safe-end.

The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on December 3, 2012, to Mr. Thomas Loomis, of your staff. The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. The draft questions were discussed in a teleconference with your staff on December 12, 2012, whereby one of the questions (number 7) was eliminated. It was agreed that a response to this RAI would be submitted by January 18, 2013.

Please contact me at 301-415-2833, if you have any questions.

sp;'~

Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289

Enclosure:

Request for Additional Information cc: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION THREE MILE ISLAND NUCLEAR STATION, UNIT 1 RELIEF REQUEST CONCERNING FULL STRUCTURAL WELD OVERLAY OF DISSIMILAR METAL WELDS ON THE LOWER COLD LEG LETDOWN NOZZLE AND SAFE-END RELIEF REQUEST RR-12-02 DOCKET NO. 50-289 By letter dated October 18, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12292A584), Exelon Generation Company, LLC (Exelon, the licensee) requested relief from the requirements of the 2004 edition, no addenda, of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code for Three Mile Island Nuclear Station, Unit 1 (TMI-1). The licensee is requesting relief to install a full structural weld overlay (FSWOL) on the lower cold leg letdown nozzle dissimilar metal welds and Alloy 600 safe-end. The U.S. Nuclear Regulatory Commission (NRC) staff has been reviewing the submittal and has determined that additional information is needed to complete its review.

1. Section 3.0 of the relief request lists ASME Code Case N-740-2 as an applicable code requirement. Various sections of the relief request stated that the proposed alternative is based on the code case. The NRC has not approved Code Case N-740-2. The NRC cannot approve a relief request that is based on a code case that the NRC has not approved. However, the NRC has approved weld overlay designs from licensees that have included provisions of Code Case N-740-2 in their relief request. Therefore, as part of the technical basis for the relief request, please include or identify the relevant portions of ASME Code Case N-740-2 that are applicable to the requested relief.
2. Section 5.0 of the relief request states that after the FSWOL is installed, ultrasonic (UT) examination coverage may achieve less than 98 percent (%) of required volume because of the intrados of the elbow, but it is still expected to be greater than 90%. The NRC staff requests the following:

(a) Provide a figure with dimensions of the examination volume.

(b) Provide a diagram showing the required examination volume for the acceptance examinations with dimensions of the examination volume and show the area(s) that will not be examined within the required examination volume.

Further, it is the NRC staff's expectation that, at a minimum, 100% of the Alloy 82/182 dissimilar metal weld, (i.e. the susceptible material within the required examination volume), be covered by UT after the weld overlay installation, if the coverage of the required examination volume cannot achieve 100%. Figure 1 shows that the Alloy 82/182 dissimilar metal weld joining the safe-end and the elbow will not receive 100%

examination coverage. Therefore:

Enclosure

- 2 (c) Justify how the structural integrity of the Alloy 82/182 dissimilar metal weld joining the safe-end and the elbow can be verified in the future.

Page 4, second paragraph, of the relief request states that"... [t]his coverage will not interrogate 100% of the susceptible material volume in one of the four directions in the intrados region shown in Figure 1. The combined coverage for all four examination directions is expected to be approximately 98% because of the inherent scan limitation of the elbow... "

(d) Discuss the four examination directions. Discuss the direction that could not achieve 1 00% examination coverage. Provide the detailed calculation to show the maximum UT examination coverage.

3. Section 5.0 of the relief request stated that examination of the completed FSWOL will be performed according to ASME Code Cases N-740-2 and N-770-1, which is conditioned by Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a(g)(6)(ii)(F),

Section 5.0 further stated that subsequent ultrasonic examinations will be performed as required by Code Case N-770-1. The NRC staff notes that Code Case N-770-1 contains provisions for various weld configurations and degradation. For regulatory clarity, please identify all the specific provisions in N-770-1 that are applicable to the proposed weld overlay installation, including at a minimum, the relevant inspection items, footnotes, subsections, and figures.

4. Section 5.0 of the relief request discusses the installation of one layer of sulfur mitigation to prevent hot cracking on the stainless steel piping. Discuss whether the delta ferrite number of this mitigation layer satisfies the delta ferrite requirements of paragraph(e) in Code Case N-504-4. Discuss the weld material (specification) used for the mitigation layer.
5. Provide the wall thickness of the letdown pipe and the thickness of the weld overlay.
6. Submit the design analyses of the weld overlay or discuss in detail how the design analyses are performed, including assumptions, references (Le., industry standards or codes), and the results.

December 14, 2012 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST RR-12-02, RELIEF REQUEST CONCERNING FULL STRUCTURAL WELD OVERLAY OF DISSIMILAR METAL WELDS ON THE LOWER COLD LEG LETDOWN NOZZLE AND SAFE-END (TAC NO. ME9818)

Dear Mr. Pacilio:

By letter dated October 18, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12292A584), Exelon Generation Company, LLC (Exelon, the licensee) submitted a relief request proposing to perform a weld overlay on the lower cold leg letdown nozzle dissimilar metal welds and Alloy 600 safe-end.

The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on December 3,2012, to Mr. Thomas Loomis, of your staff. The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed. The draft questions were discussed in a teleconference with your staff on December 12, 2012, whereby one of the questions (number 7) was eliminated. It was agreed that a response to this RAI would be submitted by January 18, 2013.

Please contact me at 301-415-2833, if you have any questions.

Sincerely, IRA!

Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289

Enclosure:

Request for Additional Information cc: Distribution via Listserv DISTRIBUTION:

RidsNrrPMThreeMilelsland Resource PUBLIC LPLI-2 RtF RidsAcrsAcnw_MailCTR Resource RidsNrrLAABaxter Resource RidsOgcRp Resource RidsRgn1 MailCenter Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1-2 Resource JTsao, NRR RidsNrrDeEpnb Resource ADAMS Accession Number: ML12340A274

  • via email E

LPL 1-2/PM LPL1-2/LA DE/EPNB/BC LPLI-2/BC PBamford ABaxter TLupold*