United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:
Entergy Nuclear Operations, Inc.
(Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #:
Identified:
Admitted:
Withdrawn:
Rejected:
Stricken:
Other:
RIV000081-00-BD01 10/15/2012 10/15/2012 RIV000081 Submitted: December 22, 2011 c.\\,Vf\\REGCI<.q;.
lW\\
0 o
'Y f?j
~
... ",'7
~J'
'tIJEntergy IPECSITE QUAUTY RELATED IP-SMM Revision 3 MANAGEMENT ADMINISTRATIVE PROCEDURE CY-11 0 MANUAL INFORMATIONAL USE Page 1
of 2
8.6 RGWMP QUARTERLY INTEGRATED REVIEW CHECKLIST
. Program
- *i ******** i>..... *.**... i ltem yt.... ).... i...........
- ...*..* > Review/Corriments The following condition reports were written to Monitoring Well MW Sample Results document MW IL exceedences in 2nd QTR 2010:
Sample Data MW Result Trends CR-IP2-2010-04672: MW-37 & 111.
CR-IP3-2010-02141: B-1 & U3-4D CR-IP2-2010-04675: MW-31, 32, 36, 50 & 53.
MH-24 (electrical vault in the Unit 2 Transformer Yard Storm Drain Storm Drain Activities adjacent to MW-111) was found to contain elevated Sample Data Storm Drain Trends levels of H-3. See CR-IP2-201 0-02509.
The following condition reports were written to IE Bulletin New 80-to File Reports document and address 80-10 issues:
No. 80-10 CR-IP3-2010-01129 Electrical vaults need labeling to help identify sample identity.
The following condition reports were written to document and address work practices that can have Facility Refueling Activities an adverse affect on GW:
Spent Fuel Moves CR-IP2-2010-03118: U2 FSB Vent Fan OOS Operations Construction Activities CR-IP3-2010-01826: U3 SFP H-3 activity 5X greater due to introduction of CVCS HUT water (40M to 120M pCi/L increase)
The following condition reports were written to document and address leaks that can have an adverse affect on GW:
Spill Reports CR-IP3-2010-01141: Small leak at 31 MonitorTank Spills & Leaks Condition Reports temp probe onto tank pad @ 1-2 drops/min.
CR-IP2-2010-03275: MW-32 vault filled with surface EN-RP-113 Reports water runoff containing greatly elevated H-3 consistent w/ spill documented in CR-IP2-201 0-00331.
System Chemistry SFP Chemistry
- CR-IP3-2010-01826: U3 SFP H-3 activity 5X greater RWST Chemistry due to introduction of CVCS HUT water (40M to 120M
& Activity RCS Activity pCiL increase)
IPEC00225223
IPEC SITE QUALITY RELATED IP-SMM Revision 3
~Entergy MANAGEMENT ADMINISTRATIVE PROCEDURE CY-110 MANUAL INFORMATIONAL USE Page 2
of 2
All radiological structures, systems and components are being identified and risk ranked as part of a fleet Other initiative to address gaps identified by the NEI peer review performed in 2009-2010. This process should be complete in fall of 201 O.