ML12335A603

From kanterella
Jump to navigation Jump to search
Official Exhibit - RIV000080-00-BD01 - IPEC Site Management Manual, IP-SMM, CY-110, Rev 3, 8.6 RGWMP Quarterly Integrated Review Chcklist (Quarter 1, 2010), IPEC00225219
ML12335A603
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/22/2011
From:
Entergy Corp
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 21642, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12335A603 (2)


Text

United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.

In the Matter of:

(Indian Point Nuclear Generating Units 2 and 3) lW\ c.\,Vf\REGCI<.q;. ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: RIV000080-00-BD01 Identified: 10/15/2012 RIV000080

< Admitted: 10/15/2012

    • o 0

< Withdrawn:

~...",'7 .

'Y

~J' f?j Rejected: Stricken:

Submitted: December 22, 2011

        • ... Other:

IPECSITE QUALITY RELATED IP-SMM Revision 3 Entergy MANAGEMENT ADMINISTRATIVE PROCEDURE CY-11 0 MANUAL INFORMATIONAL USE Page 1 of 2 8.6 RGWMP QUARTERLY INTEGRATED REVIEW CHECKLIST

  • Progl'am ...... **** . .. *.i.*. *. . * * **.> ltem ii\ .*** **ii********.. .... . . * *** ReviewJComments The following condition reports were written to Monitoring Well MW Sample Results document MW IL exceedences in 1st QTR 2010 :

Sample Data MW Result Trends

  • CR-IP2-2010-02999 Significant tritium/Cs/Co contamination was detected in manhole MH-910cated in the Unit 2 MOB alleyway.

Storm Drain Storm Drain Activities Sample Data Storm Drain Trends

  • CR-IP2-2010-00571 IE Bulletin No anomalies were noted with samples collected in New 80-to File Reports No. 80-10 support 80-10 program for this quarter.

New security barriers are being installed through out the OCA. These activities are not substantial as defined by NEI and therefore wi" not affect the subsurface flow of water.

Refueling Activities Facility Spent Fuel Moves During preparations for using the U2 SFP Operations Construction Activities supplemental HX the temporary hoses parted spilling PWST water to ISFSI ramp at U2.

There is evidence that the RWST processing skid operated in November of 2009 spilled RWST water to Spill Reports the MOB yard area adjacent to the Unit 2 PAB.

Condition Reports This spill was communicated to the NRC, NYSDEC Spills & Leaks 10CFR50.75(g) and stakeholders .

EN-RP-113 Reports

& Activity RCS Activity quarter.

IPEC00225219

~Ente(!.JY U

  • IPEC SITE MANAGEMENT MANUAL QUALITY RELATED ADMINISTRATIVE PROCEDURE IP-SMM CY-110 Revision 3 INFORMATIONAL USE Page 2 of 2 NEI (Zigmund Karpa and Frank Leone) completed a review of the IPEC GW program to determine the state of compliance with NEI 07-07. Several deviations Other were noted and documented in CR-IP2-201 0-752.

As a result of the Fleet NEI assessment corporate has issued HQN-2010-0207 to document these findings .

IPEC00225220