UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVE N.E., SUITE 1200 ATLANTA, GEORGIA 30303 November 29, 2012 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION
Dear Mr. Shea:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Watts Bar Nuclear Plant during the weeks of February 04 - 08 and February 18 - 22, 2013.
The inspection team will be led by Necota Staples, a Senior Project Inspector from the NRCs Region II office. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71152, Identification and Resolution of Problems Inspection, issued December 5, 2011.
The biennial PI&R inspection and assessment of the licensees Corrective Action Program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.
On November 28, 2012, Mr. Staples confirmed with Mr. Tommy Morgan of your staff, arrangements for the two-week onsite inspection.
The enclosure lists documents that will be needed prior to the information gathering visit.
Please have the referenced information available prior to January 19, 2013. Contact Mr.
Staples with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.
If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Mr. Staples will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.
J. Shea 2
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Necota Staples at (404) 997-4644 or me at (404) 997-4645.
Sincerely,
/RA/
George T. Hopper, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket Nos.: 50-390 License Nos.: NPF-90
Enclosure:
INFORMATION REQUEST FOR WATTS BAR NUCLEAR PLANT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION cc w/encl: (See page 3)
PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII: DRP SIGNATURE NLS /RA/
GTH /RA/
RRR /RA/
NAME NStaples GHopper RRodriguez DATE 11/26/2012 11/29/2012 11/26/2012 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
J. Shea 3
cc w/encl:
D. E. Grissette Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution David H. Gronek Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Donna K. Guinn Manager, Site Licensing Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Terry E. Cribbe Manager, Corporate Licensing Tennessee Valley Authority Electronic Mail Distribution Edward J. Vigluicci Associate General Counsel, Nuclear Tennessee Valley Authority Electronic Mail Distribution Gordon P. Arent Senior Manager, Licensing WBN Unit 2 Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution County Mayor P.O. Box 156 Decatur, TN 37322 County Executive 375 Church Street Suite 215 Dayton, TN 37321 Tennessee Department of Environment &
Conservation Division of Radiological Health 401 Church Street Nashville, TN 37243 Ann Harris 341 Swing Loop Rockwood, TN 37854
J. Shea 4
Letter to Joseph W. Shea from George T. Hopper dated November 29, 2012
SUBJECT:
WATTS BAR NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION Distribution w/encl:
J. Baptist, RII EICS L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMWattsBar1 Resource RidsNrrPMWattsBar2 Resource
Enclosure INFORMATION REQUEST FOR WATTS BAR NUCLEAR PLANT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (FEBRUARY 04-08 AND FEBRUARY 18-22, 2013)
A.
Documents Needed Prior to the Information Gathering Visit Note: Unless otherwise noted, the information requested below corresponds to documents generated since January 1, 2011. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate how the information will be provided.
- 1.
Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to:
a) Corrective action process b) Cause evaluation c) Operating experience program d) Employee concerns program e) Self-assessment program f) Maintenance rule program and implementing procedures g) Operability determination process h) Degraded/non-conforming condition process (e.g., RIS 2005-20) i) System health process or equivalent equipment reliability improvement programs j) Preventive maintenance deferral and Problem Evaluation Report (PER) extension process If any of the procedures requested above were revised after January 1, 2011, please provide (or have available) copies of all revisions during the onsite inspection.
- 2.
List of top ten risk significant systems, top ten risk significant components for each one of the top ten risk significant systems, and top ten risk significant operator manual actions.
- 3.
List of all PERs initiated including the following information for each PER:
a) PER Number b) Brief, but complete problem description c) Priority or level d) Affected system e) Affected component f) Responsible plant department g) PER completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below):
PER #
Problem Priority System Component Org Status PER001 A RHR Pump failed flow criteria per SR 5.0.5.4 2
RHR 2-RHR-PMP-A ENG Open
2 Enclosure
- 4.
List of outstanding corrective actions including the following information for each action:
a) Corrective action number b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc) c) Brief, but complete corrective action description d) Associated PER number e) Corrective action initiation date f) Number of Extensions g) Corrective action due date h) Completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below):
Corrective Action #
Type Description PER Initiation Date Extensions Due Date Status 25 CAPR Revise Procedure NGK-003-4585 PER0058 01/05/10 2
06/15/10 Closed
- 5.
List of control room deficiencies with a brief description and corresponding PER and/or work order (WO) number.
- 6.
List of operator workarounds and operator burdens with a brief description and corresponding PER number.
- 7.
List of all currently extended PERs or overdue, sorted by initiation date, with the following information:
a) PER #
b) Priority or Significance c) PER title and short description
- 8.
List of all PERs that have been voided or cancelled. Please provide the following information for each PER:
a) PER Number b) Brief, but complete problem description c) Reason voided or cancelled
- 9.
List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule since January 1, 2011. Please include the following information for each system in (a)(1):
a) Date of classification in (a)(1) b) Reason for being placed in (a)(1) c) Planned actions and their status
3 Enclosure
- 10.
List of Maintenance Preventable Functional Failures (MPFFs) of risk significant systems.
Please include actions completed and current status.
- 11.
List of corrective maintenance work orders. Please include the following information for each work order:
a) WO number b) Brief, but complete work description c) Affected system and components d) Date of initiation e) Date of completion (if completed)
If possible, provide this list in a format compatible with spreadsheet software (example shown below):
Work Order #
Description System Component Initiation Date Due Date Status WO01345 Replace breaker 2A-BKR-08-BB4 for 2A SI Pump.
SI 2A-SI-PMP, BKR-08-BB4 01/05/10 03/15/11 Closed
- 12.
Corrective action closeout packages, including PERs with description of corrective actions, for all NRC findings/violations and all licensee identified violations (LIVs).
Please include a cross reference linking NRC findings/violations and LIVs to appropriate PER numbers.
- 13.
Corrective action closeout packages, including PERs with description of corrective actions, for all licensee event reports (LERs) issued. Please include a cross reference linking LER number to appropriate PER number.
- 14.
List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.)
and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.,) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., PER #) for the documents that evaluated the aforementioned OE information.
- 15.
Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program.
- 16.
Copies of all department self-assessments for those programs related to the Corrective Action Program (e.g. Operating Experience, Maintenance Rule, etc).
- 17.
Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends.
4 Enclosure
- 18.
Copy of the latest Corrective Action Program statistics (if exists) such as the number of PERs initiated by department, human performance errors by department, and others as may be available.
- 19.
Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while team is onsite.
- 20.
List of PERs related to equipment aging issues in the top ten risk significant systems since January 1, 2008, (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.;
environmental qualification). Please provide the following information for each PER:
a) PER number b) Priority c) PER problem description
- 21.
If performed, please provide any recent self-assessment of the site safety culture.
- 22.
Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods.
- 23.
List of all root cause evaluations with a brief description.
- 24.
Copy of Probabilistic Risk Assessment importance measures report, if available.
- 25.
System Health Reports, system design basis documents, and system description information for the top ten risk significant systems.