MONTHYEARML15337A3522015-11-17017 November 2015 Official Exhibit - NYS000582-00-BD01 - Diagram of Strength Vs Amplitude by Dr. Richard T. Lahey ML15337A3372015-11-11011 November 2015 Official Exhibit - ENTR00726-00-BD01 - Track 2 Hearing Exhibit List ML15337A3322015-11-0505 November 2015 Official Exhibit - ENT000726-00-BD01 - Entergy Track 2 Hearing Exhibit List ML15337A3352015-11-0505 November 2015 Official Exhibit - RIVR14001-00-BD01 - Riverkeeper Tailored Track 2 Exhibit List ML15337A3362015-11-0505 November 2015 Official Exhibit - NRCR10001-00-BD01 - NRC Staff Track 2 Exhibit List ML15337A3332015-11-0404 November 2015 Official Exhibit - NYSR25001-00-BD01 - NYS Revised Tailored Exhibits List Relevant to Track 2 Contentions ML15337A3312015-11-0303 November 2015 Official Exhibit - NRC000230-00-BD01 - Corrections to Prefiled Testimony NRC000168 and NRC000197 ML15337A3262015-10-29029 October 2015 Official Exhibit - ENT000722-00-BD01 - Supplemental Testimony of Entergy Witnesses Nelson Azevedo, Timothy Griesbach & Randy Lott ML15337A3292015-10-29029 October 2015 Official Exhibit - ENTR16001-00-BD01 - Entergy Revised Exhibit List ML15337A3242015-09-23023 September 2015 Official Exhibit - NYS000576-00-BD01 - Pre-Filed Supplemental Testimony of Richard T. Lahey Re Contentions NYS-25, NYS-26B/RK-TC-1B & NYS-38/RK-TC-5 ML15337A3072015-09-0909 September 2015 Official Exhibit - NYS000573-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2962015-09-0909 September 2015 Official Exhibit - NYS000570-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2832015-09-0909 September 2015 Official Exhibit - NYS000563-00-BD01 - Pressurized Water Reactor (PWR) Systems, USNRC Technical Training Center, Reactor Concepts Manual, Pages 4-1 to 4-28 ML15337A2952015-09-0909 September 2015 Official Exhibit - NYS000569-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2942015-09-0909 September 2015 Official Exhibit - NYS000568-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A2932015-09-0909 September 2015 Official Exhibit - NYS000567-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A3042015-09-0909 September 2015 Official Exhibit - NYS000571-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of David J. Duquette in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2972015-09-0909 September 2015 Official Exhibit - RIV000164-00-BD01 - NUREG-1740, ACRS, Voltage-Based Alternative Repair Criteria: a Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (2001) ML15337A3062015-09-0909 September 2015 Official Exhibit - NYS000572-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2822015-09-0909 September 2015 Official Exhibit - NYS000566-00-BD01 - Figure 1 for Supplemental Reply Testimony of Dr. Richard T. Lahey ML15337A3142015-09-0404 September 2015 Official Exhibit - ENTR00615-PUB-00-BD01 - Entergy'S Statement of Position Re Contention NYS-25 (Embrittlement) - Redacted ML15334A2842015-08-10010 August 2015 Official Exhibit - ENT000687-00-BD01 - NRC, Safety Evaluation Report, Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the Westems Computer Code (WCAP-17577, Revision 2) (Undated) ML15335A2932015-08-10010 August 2015 Official Exhibit - NRCR00104-00-BD01 - on Yee Statement of Professional Qualifications (Revised) ML15337A2642015-08-10010 August 2015 Official Exhibit - NRC000196-PUB-00-BD01 - NRC Staff'S Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals) ML15337A3192015-08-10010 August 2015 Official Exhibit - ENT000698-PUB-00-BD01 - Entergy'S Revised Statement of Position Regarding Contention NYS-38/RK-TC-5(Safety Commitments) (Aug. 10, 2015)Redacted ML15337A3202015-08-10010 August 2015 Official Exhibit - ENT000699-PUB-00-BD01 - Redacted Revised Testimony of Entergy Witnesses Nelson Azevedo, Robert Dolansky, Alan Cox, Jack Strosnider, Timothy Griesbach, Barry Gordon, Randy Lott, and Mark Gray Regarding Contention NYS-38/RK ML15337A3172015-08-10010 August 2015 Official Exhibit - ENT000678-PUB-00-BD01 - NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, ?Reply to Request for Additional Information Regarding License Renewal Application? (Nov. 28, 2007)Redacted ML15337A2652015-08-10010 August 2015 Official Exhibit - NRC000197-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 ML15337A2412015-08-10010 August 2015 Official Exhibit - NRCR00147-00-BD01 - NRC Staff'S Revised Statement of Position on State of New York and Riverkeeper'S Joint Contention NYS-38/RK-TC5 (Revised) ML15335A2902015-08-10010 August 2015 Official Exhibit - NRC000222-00-BD01 - IP3 FSAR Rev. 04 Chapter 3 (2011) (Excerpt) ML15334A2632015-08-10010 August 2015 Official Exhibit - ENT000648-00-BD01 - M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227 Pressurized Water Reactor Internals Inspection and Evaluat ML15337A2622015-08-10010 August 2015 Official Exhibit - NRC000228-00-BD01 - Indian Point Unit 2 Technical Specifications 3.1.4 ML15337A2452015-08-10010 August 2015 Official Exhibit - NRC000227-00-BD01 - Gary Stevens Statement of Professional Qualifications ML15337A2632015-08-10010 August 2015 Official Exhibit - NRC000229-00-BD01 - Indian Point, Unit 3 Technical Specifications 3.1.4 ML15335A2192015-08-10010 August 2015 Official Exhibit - ENTR00031-00-BD01 - Curriculum Vitae of Alan B. Cox ML15335A2112015-08-10010 August 2015 Official Exhibit - ENTR20186-00-BD01 - Curriculum Vitae of Mark A. Gray ML15337A3162015-08-10010 August 2015 Official Exhibit - ENT000616-PUB-00-BD01 - Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-25 (Embrittleme ML15337A2782015-08-10010 August 2015 Official Exhibit - NRC000168-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, Mr. Gary Stevens, P.E., and Mr. on Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS-38/RK-TC-5 ML15337A2712015-08-10010 August 2015 Official Exhibit - NRC000223-00-BD01 - IP3 FSAR Rev. 04 Chapter 14 (2011) ML15337A2592015-08-10010 August 2015 Official Exhibit - NRC000224-00-BD01 - IP3 FSAR Rev. 04 Chapter 16 ML15337A2442015-08-10010 August 2015 Official Exhibit - NRCR00161-00-BD01 - NRC Staff Testimony of Dr. Allen L. Hiser and Mr. Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (Revised) ML15334A2822015-08-10010 August 2015 Official Exhibit - ENT000680-00-BD01 - Curriculum Vitae of Barry M. Gordon ML15335A2912015-08-10010 August 2015 Official Exhibit - NRCR00118-00-BD01 - Indian Point Unit 3 Technical Specifications (Excerpt) (Revised) ML15334A2282015-08-10010 August 2015 Official Exhibit - ENT000634-00-BD01 - Entergy, IP2, FSAR Update, Revision 25 (2014) (Excerpts) ML15335A2822015-08-10010 August 2015 Official Exhibit - NRC000220-00-BD01 - Pressurized Water Reactor Owners Group (PWROG) Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange: Clevis Insert Bolt Update, (June 2014) ML15337A2692015-08-10010 August 2015 Official Exhibit - NRC000169-00-BD01 - NRC000169 - Indian Point, Unit 2 Technical Specifications (Excerpt) ML15337A2602015-08-10010 August 2015 Official Exhibit - NRC000226-00-BD01 - Jeffrey C. Poehler Statement of Professional Qualifications ML15335A2732015-08-10010 August 2015 Official Exhibit - NRC000183-00-BD01 - NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013) ML15335A2202015-08-10010 August 2015 Official Exhibit - ENTR00184-00-BD01 - Curriculum Vitae of Jack R. Strosnider ML15335A3012015-08-10010 August 2015 Official Exhibit - NRC000206-00-BD01 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 14 - Safety Analysis (2014) 2015-09-09
[Table view] |
Text
United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.
In the Matter of:
(Indian Point Nuclear Generating Units 2 and 3) NYS000196 c.\,..t.P.R REGU~)o ASLBP #: 07-858-03-LR-BD01 Submitted: December 16, 2011
!~~\
Docket #: 05000247 l 05000286
~ 0 Exhibit #: NYS000196-00-BD01 Identified: 10/15/2012
~ ~
'" ~ Admitted: 10/15/2012 Withdrawn:
~
'1"'/1- 0' f Rejected: Stricken:
~
Conte, Richard From: Roberts, Darrell ~
Sent: Friday, April 23, 201 () 5: 15 PM To: Conte, Richard; Gray, Harold; Wilson, Peter
Subject:
RE: Buried piping - Proposed NRC Action Please connect these thoughts and any others with the appropriate NRR/DCI staff - as Fred Brown is working with them in formulating a generic communication approach in the very near term.
Fred was focused on the "high-pressure discharge-buried piping" being a unique nuance that we had not been focused on before (Le., most buried piping of safety*:related systems has been associated with low-pressure suction sides of pumps). He and DCI may need to be enlightened as to any other aspects (such as those you list below) that may need to be addressed in the generic communication.
thx, DJR From: Conte, Richard Sent: Friday, April 23, PM To: Gray, Harold; Roberts, Darrell; Wilson, Peter
Subject:
RE: Buried piping - Proposed NRC Action interesting that while you and Fred Brown were discussing the need for generic communications, Harold implemented writing his ideas down this morning.
After IndianPoint, Oyster Creek, VY and now Salem, it is clear that the industry might not have a good understand for safety related applications:
what by design is buried; what is buried and not covered by ASME code e.g., 1 inch piping.
because it is buried, how do they assess external conditions.
if inaccessible what maintenance and testing is done periodically, through internal means if underground but not buried what kind of surveillance or PM is done in the vaults and pipe chases.
do they have a buried pipe program if they have not submitted a license renewal application ..
From: Gray, Harold Sent: Friday, April 23, AM To: Conte, Richard
Subject:
Buried piping - Proposed NRC Action The buried pipe degradation conditions at 0 Creek, Indian Point and Salem, while not having serious operability or safety consequences, collectively illustrate that Plants do not fully know what they have in the scope and condition of buried piping.
The proposal is for NRC to issue generic direction to the industry on buried piping as a Generic Letter, Bulletin or Information Notice with at least the following scope: .
OAG10001063_00001
Confirm that there is no buried Class 1 piping at the plant site.
Confirm that buried Service water pipe and components are currently within the scope and control as previously determined by evaluations and responses to GL 89-13 and its followups.
Determine the scope of other Class 2 and Class 3 safety or risk significant buried pipe.
For all buried pipe systems, other than service water components, confirm that the provisions of the ASME Code Section XI, IWA-5244 for buried pipe and components have been met. Additionally, confirm by sampling including excavation and testing that the coating of buried piping has been properly applied and is currently protecting the pipe from corrosion.
Harold Gray, 610-337-5325 2
OAGI0001063 00002
Conte, Richard From: Conte, Richard Sent: Friday, April 23, 2010 1:05 PM To: Gray, Harold; Roberts, Darrell; Wilson, Peter
Subject:
RE: Buried piping - Proposed NRC Action interesting that while you and Fred Brown were discussing the need for generic communications, Harold implemented writing his ideas down this morning.
After IndianPoint, Oyster Creek, 'VY and now Salem, it is clear that the industry might not have a good understand for safety related applications:
what by design is buried; what is buried and not covered by ASME code e.g., 1 inch piping.
because it is buried, how do they assess external conditions.
if inaccessible what maintenance and testing is done periodically, through internal means if underground but not buried what kind of surveillance or PM is done in the vaults and pipe chases.
do they have a buried pipe program if they have not submitted a license renewal application.
From: Gray, Harold Sent: Friday, April 23, 2010 9:52 AM To: Conte, Richard
Subject:
Buried piping - Proposed NRC Action The buried pipe degradation conditions at 0 Creek, Indian Point and Salem, while not having serious operability or safety consequences, collectively illustrate that Plants do not fully know what they have in the scope and condition of buried piping.
The proposal is for NRC to issue generic direction to the industry on buried piping as a Generic Letter, Bulletin or Information Notice with at least the following scope:
Confirm that there is no buried Class 1 piping at the plant site.
Confirm that buried Service water pipe and components are currently within the scope and control as previously determined by evaluations and responses to GL 89-13 and its followups.
Determine the scope of other Class 2 and Class 3 safety or risk significant buried pipe.
For all buried pipe systems, other than service water components, confirm that the provisions of the ASME .
Code Section XI, IWA-5244 for buried pipe and components have been met. Additionally, confirm by sampling including excavation and testing that the coating of buried piping has been properly applied and is currently protecting the pipe from corrosion.
1 OAGI0001063 00003
Harold Gray, 610-337-5325 2
Conte, Richard From: Gray, Harold Sent: Friday, April 23, 2010 11 :27 AM To: Hoffman,Keith; Hardies, Robert Cc: Conte, Richard; Lupoid, Timothy
Subject:
FW: Buried piping - Proposed NRC Action FYI, a plan.
You may already have something like this in the works, but as time moves on it seems more needed.
VY can be added to the list.
Harold Gray, 610-337-5325 From: Gray, Harold Sent: Friday, April 23, 2010 9:52 AM To: Conte, Richard .
Subject:
Buried piping - Proposed NRC Action The buried pipe degradation conditions at 0 Creek, Indian Point and Salem, while not having serious operability or safety consequences, collectively illustrate that Plants do not fully know what they have in the scope and condition of buried piping.
The proposal is for NRC to issue generic direction to the industry on buried piping as a Generic Letter, Bulletin or Information Notice with at least the following scope: .
Confirm that there is no buried Class 1 piping at the plant site.
Confirm that buried Service water pipe and components are currently within the scope and control*as previously determined by evaluations and responses to GL 89-13 and its followups.
Determine the scope of other Class 2 and Class 3 safety or risk significant buried pipe.
For all buried pipe systems, other than service water components, confirm that the provisions of the ASME Code Section XI, IWA-5244 for buried pipe and components have been met. Additionally, confirm by sampling including excavation and testing that the coating of buried piping has been properly applied and is currently p'rotecting the pipe from corrosion.
Harold Gray, 610-337-5325 1
OAGI0001063 00005