ML12333A308

From kanterella
Jump to navigation Jump to search

Summary of Pre-Application Meeting with Entergy Nuclear Operations, Inc., to Discuss a Forthcoming Palisades NFPA-805 Submittal
ML12333A308
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/05/2012
From: Mahesh Chawla
Plant Licensing Branch III
To:
Chawla M
Shared Package
ML12338A377 List:
References
TAC ME9852
Download: ML12333A308 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 5, 2012 LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC.

FACILITY: PALISADES NUCLEAR PLANT

SUBJECT:

SUMMARY

OF NOVEMBER 13, 2012, PRE-APPLICATION MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC., TO DISCUSS A FORTHCOMING PALISADES NFPA-805 SUBMITTAL (TAC NO. ME9852)

On November 13, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Nuclear Operations, Inc. (ENO),

at NRC Headquarters. One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss a forthcoming National Fire Protection Association (NFPA) 805 submittal at Palisades Nuclear Plant (PNP). A list of attendees is provided as an enclosure.

Prior to the meeting, the licensee had submitted the slides for their presentation entitled "NFPA 805 License Amendment RequestPre-submittal meeting" dated November 13,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12314A371). During the meeting, the licensee's presentation provided an overview of the NFPA 805 project at Palisades. The licensee discussed with the NRC staff the overview of the Palisades plant, the current Fire Protection Licensing Basis, NFPA 805 Transition Project Overview, compliance with NFPA 805, and the proposed timeline for the project.

- 2 The licensee plans to submit the license amendment request by December 31,2012. The NRC staff provided the licensee with the necessary information required for the acceptance review and the necessity of minimizing the need for requesting additional information. The licensee adequately responded to the staff's questions and provided the necessary information and clarifications. There was also general consensus to conduct additional meetings or teleconferences as needed. There were members of the public who joined the meeting via teleconference. However, no Public Meeting Feedback forms were requested. Please direct any inquiries to me at 301-415-8371, or Mahesh.chawla@nrc.gov.

Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosure:

As stated cc w/encl: Distribution via Listserv

LIST OF ATTENDEES NOVEMBER 13. 2012. PRE-APPLICATION MEETING WITH ENO TO DISCUSS NFPA 805 TRANSITION FOR PALISADES NUCLEAR PLANT NAME ORGANIZATION TITLE NUCLEAR REGULATORY COMMISSION STAFF Mahesh Chawla NRR/DORL Project Manager Robert Carlson NRR/DORL Branch Chief NRR/DRAlAFPB Harry Barrett Senior Fire Protection Engineer Alex Klein NRR/DRAlAFPB Branch Chief Senior Fire Protection Engineer Paul Lain NRR/DRAlAFPB Fire Protection Engineer Charles Moulton NRR/DRAlAFPB Senior Project Manager Leslie Fields NRR/DRAlAFPB Donnie Harrison NRC/NRR/DRAIAPLA Branch Chief ENTERGY REPRESENTATIVES AT I

THE MEETING Amy Hazelhoff Entergy/Enercon Palisades Licensing Lead Barry Davis Entergy General Manager - Engineering Jeff Voskuil Entergy Senior Engineer Brian Bogan Entergy Senior Staff Engineer I Tom Swiecicki Entergy Senior Lead Engineer Otto Gustafson Entergy Licensing Manager Robert Hamm Entergy/BP&R Engineering Engineer

. Keith Smith Entergy Project Manager Neil Lane Entergy Manager of Projects Jim Chapman Entergy Director Safety & Risk Enclosure

- 2 NAME ORGANIZATION TITLE ENTERGY REPRESENTATIVES ON PHONE Kelly Taylor Appendix R Solutions Technical Manager Robert White ERIN Engineering Manager Richard Nance Entergy Fleet Project Manager Larry Young Entergy ANO Project Lead Engineer Dana Millar Entergy Licensing Engineer Patrick Crowe Entergy Corporate Fire Protection Engineer Jim Kuemin Entergy Licensing Engineer

- 2 The licensee plans to submit the license amendment request by December 31, 2012. The NRC staff provided the licensee with the necessary information required for the acceptance review and the necessity of minimizing the need for requesting additional information. The licensee adequately responded to the staff's questions and provided the necessary information and clarifications. There was also general consensus to conduct additional meetings or teleconferences as needed. There were members of the public who joined the meeting via teleconference. However, no Public Meeting Feedback forms were requested. Please direct any inquiries to me at 301-415-8371, or Mahesh.chawla@nrc.gov.

Mahesh Chawla, Project Manager IRAJ Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosure:

As stated cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrLABTully Resource CMoulton, NRR LPL 3-1 Reading RidsOgcRp Resource LFields, NRR RidsAcrsAcnw_MaiICTR Resource RidsRgn3MailCenter Resource DPickett, NRR RidsNrrDorlLpl3-1 Resource HBarrett, NRR TSantos, EDO Region 3 RidsNrrPMPalisades Resource PLain, NRR TWertz. NRR ADAMS Accession Nos.: PKG ML12338A377 Meeting Notice ML12305A547 Meetlng Summary ML12333A308 Handout s ML12314A371 OFFICE DORLlLPL3-1/PM DORLlLPL3-1/LAit DORLlLPL3-1/LA NRR/DRAlAFPBI BC NAME MChawla ELee BTully AKlein DATE 12/03/12 11/30/12 11/30/12 12/03112 OFFICE NRR/DRAlAPLAlBC DORLlLPL3-1/BC DORLlLPL3-1/PM NAME DATE DHarrison 12/03/12 RCarlson 12/05/12

~a12/05/12 OFFICIAL RECORD COpy