Category:Letter
MONTHYEARML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A0522023-10-0202 October 2023 Requalification Program Inspection IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-104, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-103, Inservice Inspection Examination Report2023-08-0303 August 2023 Inservice Inspection Examination Report ML23192A0782023-07-11011 July 2023 Operator Licensing Retake Examination Approval L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 ML23157A0722023-06-0606 June 2023 Notification of Conduct of a Fire Protection Team Inspection L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 ML23129A0312023-05-0909 May 2023 Reactor Operator Retake License Examination ML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report L-2023-053, Core Operating Limits Report for Cycle 232023-04-0505 April 2023 Core Operating Limits Report for Cycle 23 ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-023, Revised Steam Generator Tube Inspection Report2023-03-0303 March 2023 Revised Steam Generator Tube Inspection Report ML23020A1002023-03-0303 March 2023 OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter 2024-01-29
[Table view] |
Text
1484.
SU.S Unitd S.- N NRC Rq'g -,or CEm i ETS Task Number: G20120877 ProtectingPeople and the Entironment Electronic Tracking System BU ra Inorato Lead Assignee: NRR OEDO Due Date:
Other Assignees: SECY Due Date:
Other Parties:
Subject:
Relicensing of Seabrook
Description:
CC Routing: OGC, Regionl ADAMS Accession Numbers - Incoming: Response / Package:
IND r 0 rmtio Cross Reference LTR-12-0684 SRM\Other: No ft ia- S- Sorato Action Type: Appropriate Action OEDO Concurrence: No Signature Level: No Signature Required OCM Concurrence: No Special Instructions: OCA Concurrence: No Ref. G20120877. For Appropriate Action. If a response is determined, please be sure to create an ADAMS Package to include the incoming (version we forward to you from DPC), with response and process accordingly. Copies should be sent to RidsEdoMailCenter and RidsSecyMailCenter.
Originator Name: Bruce Skud and Joanna Hammond Date of Incoming: 11/08/2012 Originator Org: No More Document Received by OEDO Date: 11/15/2012 Fukushimas Date Response Requested by Originator:
Aadressee: unairman IvIacTarlane Incoming Task: Letter OEDO POC: Dan Merzke (Ae- S $C /'-(7 ~i ~0e(lbs-i SZECV-6(
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Primted.-Nov 15, 2012 09:46 PAPER NUMBER: LTR- 12-0684 LOGGING DATE: 11/15/2012 ACTION OFFICE:
AUTHOR: Bruce Skud AFFILIATION: MA ADDRESSEE: CHRM Allison Macfarlane
SUBJECT:
Concerns regarding the Seabrook Station ACTION: Appropriate DISTRIBUTION: RF LETTER DATE; 11/08/2012 ACKNOWLEDGED. No SPECIAL HANDLING:
NOTES:
FILE LOCATION: ADAMS DATE DUE: DATE SIGNED:
EDO -- G20120877
No More Fukushimas!
c/o Bruce Skud 14 Olive Street Newburyport, MA 01950 The Honorable Allison M. Macfarlane, Chair Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 November 8, 2012
Dear Chairwoman Macfarlane:
We appreciated receiving a Nuclear Regulatory Commission (NRC) response to the August 28, 2012, letter that we sent to the NRC concerning Seabrook Station relicensing. The NRC's response (October 17, 2012) came from Dennis Morey, Chief, Project Manager 1, Projects Branch Division of License Renewal, Office of Nuclear Reactor Regulation (Docket No. 50-443).
In our letter, we highlighted a concern openly discussed NRC meeting April 26, 2012, on Seabrook relicensing held in Hampton, New Hampshire. Data indicates that due to climate change there could be an increase in sea levels and storm surges that would affect the Seabrook plant. Obviously, the flooding of the Seabrook plant campus should be a cause for concern, especially since it the flooding is projected to occur within the timeframe of the relicensing period, 2030-2050.
In his response to our letter, Mr. Morey categorically rejected the idea that this rising sea level information was of any relevance to the relicensing of the Seabrook plant:
Regarding your concerns about the current design-basis flood level calculations.... please note that these issues are not part of the NRC's review of a license renewal application. A license renewal review is not a re-review of the facility licensing basis; rather, it is focused on managing the age-related degradation of passive systems, structures, and components to ensure they will fulfill their safety-related functions, as specified in the current licensing basis.
The NRC has multiple processes to evaluate the adequacy of current plant operations and licensing bases. Should the NRC become aware at any time of information calling into question the continued safe operation of any nuclear power plant, including Seabrook Station, the NRC will take the appropriate actions as part of the agency's ongoing safety oversight, regardless of whether those plants have sought or are seeking a renewed license.
In the twists and turns of bureaucratic thinking, Mr. Morey may be technically correct that climate-change-related flooding is not an "age-related" deterioration artifact. But, Mr. Morey seems to brush off the fact that new global climate conditions could completely reconfigure the safety profile of the plant. We believe that whether or not climate-change-related flooding falls within "design-basis flood calculations" is a hairsplitting issue for bureaucrats. However, for those of who live near the plant it's a major safety issue. Therefore, if necessary, we respectfully recommend that NRC modify its relicensing concerns to include global climate change/rising sea levels in its license renewal framework.
1
No More Fukushimas!
c/o Bruce Skud 14 Olive Street Newburyport, MA 01950 Furthermore, Mr. Morey must know that the NRC has identified "alkali-silica reaction (ASR)" as a potential long-term threat to the reliability of the Seabrook plant and that structural degradation due to ASR is currently under the NRC's relicensing review. The flooding water will obviously raise levels of saltwater saturation, which will accelerate concrete degradation so, on that basis alone, the flooding should be within the Seabrook relicensing purview.
Finally, since Mr. Morey did not identify the steps the NRC plans to take to address flooding at the Seabrook plant, we surmise that the NRC does not consider flooding due to sea-level rise to be a problem. Our concern has escalated since researchers at the Shorenstein Asia-Pacific Research Center at Stanford University in an October 31, 2012, piece in the Washington Post reported that they had conducted a study that assessed the vulnerability of nuclear plants flooding around the world.
The Stanford researchers collected information on plant height, sea wall height and the location of emergency power generators for 89 nuclear plants that lie next to water. They compared this to historical information on high waves triggered by various sources, such as earthquakes, landslides and hurricanes. The study found that the U.S. plants most vulnerable to inundation are the Salem and Hope Creek plants on the New Jersey/Delaware border; the Millstone plant in Connecticut; and the Seabrook plant in New Hampshire (italics added). We strongly urge you to contact the researchersand obtain this invaluable informationfrom them directly.
That said, we ask the NRC-as we did in our August letter-to review the risk that rising sea levels, storm surges or increased groundwater saturation of concrete poses to residents who live in the vicinity of the Seabrook nuclear power plant. As we have stated, we believe it is entirely appropriate to do so within the purview of the license renewal process. But, in the spirit of public safety, which we believe should be paramount-we urge the NRC to use whatever regulatory tools are needed to investigate this critical issue.
Sincerely yours, Bruce Skud andJoannaHammond Co-founders, No More Fukushimas!
2
,4(~& 6'/ 9SV Flat Rate Envelope ONMAIL UNITED STATES POSTAL SERVICE Apply PriorityMail Postage Here S. i.. U.S POSTAGE 11111 liiU PA1 d:U ID liiiNEWBURYPUH
-!7PRIORITY@ = T POTLSERVIE
-UNITD STATES NOV 08 '12 AMOUNT
.MH W-,MAIL ATESPOSrZL SERVICE 1006 20852
$5.90 00081843-09 it *Spcom 4ay ao0 I
IllNIR llllllll lll rll United States Postal Service DIVERY CONFIRMA TIO7M'
'