SU.S.NRC Protecting People and the Environment ETS Electronic Tracking System G20120651 1007 Source: OEDO Task Number:
IM' Lead Assignee: NRR Other Assignees:
OEDO Due Date:
SECY Due Date:
Other Parties:
Subject:
Safety Issues at Seabrook Nuclear Power Plant
==
Description:==
CC Routing:
NRR, OGC ADAMS Accession Numbers - Incoming:
Response / Package:
Othe Inoration Cross Reference SRM\\Other: No Action Type: Appropriate Action OEDO Concurrence:
No Signature Level: No Signature Required OCM Concurrence:
No Special Instructions:
OCA Concurrence:
No For Appropriate Action. If response is determined, please be sure to create an ADAMS Package to include the incoming (version we forward to you from DPC), with response and process accordingly.
Copies should be provided to the RidsEdoMailCenter and RidsSecyMailCenter.
Doumn Inforatio Originator Name: Bruce Skud and Joanna Originator Org: No More Fukushima Addressee: Chairman Macfarlane Incoming Task: Letter Date of Incoming: 08/28/2012 Document Received by OEDO Date: 08/31/2012 Date Response Requested by Originator:
OEDO POC: Dan Merzke
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Aug 30, 2012 15:45 PAPER NUMBER:
ACTION OFFICE:
LTR-12-0476 E
LOGGING DATE: 08/30/2012 AUTHOR:
AFFILIATION:
ADDRESSEE:
Bruce Skud (No More Fukushimas!)
MA CHRM Allison Macfarlane
SUBJECT:
Concerns safety issues at the Seabrook Nuclear Power Plant ACTION:
DISTRIBUTION:
LETTER DATE:
ACKNOWLEDGED SPECIAL HANDLING:
Appropriate RF 08/28/2012 No NOTES:
FILE LOCATION:
ADAMS DATE DUE:
DATE SIGNED:
-- G20120651
No More Fukushimas!
C/o Bruce Skud 14 Olive Street Newburyport, MA 01950 9784623905 The Honorable Allison M. Macfarlane, Chair Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 August 28, 2012
Dear Dr. Macfarlane:
Congratulations on your confirmation as chair of the Nuclear Regulatory Commission (NRC). As neighbors of a nuclear power plant, we are glad to have someone with your expertise and experience leading this important public safety organization.
We are writing to inform you about the recent activities of municipal, state, and federal elected officials serving Massachusetts communities located near the Seabrook nuclear power plant in New Hampshire.
The Seabrook plant has applied for a 20-year addition to its current 40-year (1990-2030) operating license, which would extend this facilities operating timeline to 2050. Local residents and elected officials are extremely concerned that the license extension request will be granted before current safety issues at Seabrook have been fully evaluated and effectively resolved, and without proper monitoring of safety fixes. The grassroots, citizen-based organization we founded - No More Fukushimas! - was formed last year specifically because of widespread safety concerns about the Seabrook plant in local communities.
In recent months, a large number of elected officials in our area contacted your predecessor, Chairman Jaczko, to express concern about public safety at the Seabrook plant, including US Senator John Kerry, Congressmen John Tierney and Edward Markey; Massachusetts Senator Steven Baddour and Representative Michael Costello; Newburyport Mayor Donna Holaday and Haverhill Mayor James Fiorentini; and the governing bodies from Newburyport, Newbury, Salisbury, and West Newbury, Massachusetts-all signed unanimously. (See the attached copies of letters to Chairman Jaczko.)
Another letter from a local governing body was sent by the Merrimack Board of Selectmen on August 27, 2012. Some requested that the NRC suspend the relicensing process for the Seabrook nuclear power plant until all current safety issues have been resolved.
As you may be aware, current safety issues at the Seabrook plant (detailed in an attached document) include "moderate-to-severe" concrete degradation in safety-related structures-a novel problem at a US nuclear plant, projections of sea-level rise sufficient to flood plant property, and a recent failed emergency preparedness test. We - residents and elected officials - want assurances that the NRC will require the plant owner to address these risks before the plant license extension is considered and, in particular, will not simply accept an aging management plan.
1
No More Fukushimas!
C/o Bruce Skud 14 Olive Street Newburyport, MA 01950 9784623905 We live in a densely populated coastal area, and the safety of the Seabrook nuclear power plant is absolutely essential. As Commission Chair, we urge you to make public safety the highest priority in the license renewal process at the Seabrook nuclear power plant.
Thank you, Bruce Skud and Joanna Hammond Co-founders, No More Fukushimas!
Attachments:
Relicensing Safety Concerns at the Seabrook Nuclear Power Plant Letters to the Nuclear Regulatory Commission from federal, state, and local representatives concerning license renewal at the the Seabrook plant Senator John Kerry Congressmen John Tierney and Edward Markey (3 joint letters)
Massachusetts Senator Stephen Baddour Massachusetts Representative Michael Costello Haverhill Mayor James Fiorentini Newburyport City Council (signed by Mayor Donna Holaday)
Salisbury Board of Selectmen West Newbury Board of Selectmen Newbury Board of Selectmen Merrimac Board of Selectmen 2
No More Fukushimas!
C/o Bruce Skud 14 Olive Street Newburyport, MA 01950 9784623905 RELICENSING SAFETY CONCERNS AT THE SEABROOK NUCLEAR POWER PLANT WORSENING OF CONCRETE DEGRADATION REFLECTS POOR PLANT MANAGEMENT AND NRC OVERSIGHT In May 2011 inspection report, the Nuclear Regulatory Commission (NRC) reported on concrete degradation at the Seabrook plant due to unabated groundwater infiltration. Specifically, groundwater infiltration has led to an "alkali-silica reaction" (ASR) in the concrete used in safety-related tunnels and in the plant's foundation. (In an ASR reaction, a hard gel forms; this creates micro-cracks, potentially weakening structures.) In November 2011, the NRC sent a bulletin to all US nuclear power plants warning them about this discovery at the Seabrook plant (the first US nuclear power plant with a confirmed case of ASR affecting safety structures. Subsequently, the NRC concluded that the ASR problem could pose a threat to long-term plant safety Fortunately, there are 18 years remaining before the plant's license expires, which provides the NRC ample opportunity to fully assess the problem and to determine the effectiveness of any remedy before considering relicensing. The submission of and approval of the usual "aging management plan" should not be an adequate basis for license renewal in the case of a novel problem of this dimension.
Since public safety is the top priority, we urge the NRC to require the plant to fix the concrete, stop the groundwater infiltration, and undertake all remedial steps that engineering studies indicate are necessary. After these steps are implemented, then the NRC should monitor the plant to determine the effectiveness of the solution-before considering license renewal.
The public is concerned also because the plant is located in an area subject to seismic activity. In the 18th century, there was a severe earthquake and we are concerned that the plant's foundation can withstand an earthquake given its potentially weakening due to concrete degradation.
Although this problem appears to be technical in nature, the ASR issue has raised egregious concerns about the Seabrook plant's management and the NRC's regulatory oversight. In fact, in June 2011, the International Atomic Emergency Agency (IAEA) found that Seabrook plant management had completely failed to manage the ASR problem. According to the IAEA, the plant knew about the potential for an ASR problem shortly after construction, but the ASR risk "was not reassessed before the relicensing process" because Seabrook plant management failed to conduct test borings until just prior to the relicensing period, suggesting decades of negligence.
The extent of ASR degradation at Seabrook means that the NRC's oversight of this matter has been equally inadequate. How could the concrete degradation due to groundwater infiltration go on for decades without being identified earlier? The degradation has progressed to the point where the NRC characterized it as visibly "severe" in some places. For instance, electrical control tunnel B, a key safety structure at the plant, has visible micro-cracks, yet the tunnel is fully accessible to an inspector. (This tunnel is significant since it houses electrical cables that feed power to the cooling system in the case of 3
No More Fukushimas!
C/o Bruce Skud 14 Olive Street Newburyport, MA 01950 978 462 3905 a nuclear meltdown.) Why did the inspectors fail to conduct a below-surface inspection at the plant during all those years? We cannot understand how the NRC missed this degradation or, if notified by the plant of the problem, failed to incorporate it into an inspection report until May 2011.
Moreover, the public has learned that the membrane around the plant that was intended to abate groundwater infiltration was ineffective from the start. To compensate for the ineffective membrane, the plant has pumped out groundwater, but this also did not work adequately. The original design called for a barrier since the plant was built on a salt marsh. Why didn't the NRC order the plant to fix or replace it? The NRC's lapse in judgment has certainly exacerbated the ASR problem, shaking our trust.
SEABROOK PLANT FAILS EMERGENCY MANAGEMENT TEST Public confidence in the safety of the Seabrook nuclear power plant has further eroded when Seabrook failed the NRC's April 2012 simulated emergency test of a radiological release. The NRC reported that the plant failed to identify the simulated radiological release and thus did not notify emergency management authorities. The NRC determined that plant personnel did not become aware of the simulated release until the NRC informed the plant of the incident.
Obviously, we are worried about what would have happened if this had been a real release of radiation.
While the NRC issued a "white violation," it is particularly disheartening to know that this test failure occurred during a period of high media, public, and NRC scrutiny, when one would assume the plant would be showing utmost vigilance.
NRC IGNORING POTENTIAL FOR FLOODING OF SEABROOK PLANT At the recent NRC public meeting held in Hampton, New Hampshire, a new safety issue was raised that NRC regulators seem to be brushing aside. Scientists expect sea levels to rise due to climate change around the Seabrook plant during the proposed license extension period, 2030 to 2050. One audience member at that meeting indicated that the flood maps are now projecting that rising sea levels, increases in storm surges, and increased salinity levels will affect the Seabrook plant.
While some safety facilities (e.g., the control room), are situated well above grade, obviously even a mild rise in sea level could affect the plant, potentially accelerating concrete degradation and posing other problems. The NRC has not incorporated this concern among the issues to be addressed by the plant during the licensing process. Ignoring this problem appears to us to be more lax judgment by the NRC.
4
JOHN KERRY COMMITTEES:
MASSACHUSETTS COMMERCE. SCIENCE, AND TRANSPORTATION FINANCE I13niteI
.$tLatc 05enat FOREIGN RELATIONS SMALL BUSINESS WASHINGTON, DC 20510-2102 I Bowdoin Square 1 01h Floor Boston, MA 02114 March 23, 2012 Gregory B. Jaczko Chairman U.S. Nuclear Regulatory Commission Mail Stop O-16G4 Washington, DC 20555-0001
Dear Chairman Jaczko:
I write to raise my concern regarding the lack of mandatory action taken by the Nuclear Regulatory Commission (NRC) related to serious safety issues at the Seabrook Nuclear Power Plant, located in Seabrook, New Hampshire, on the Massachusetts border. I urge you to take action immediately, before the plant becomes more degraded and poses an even more serious risk to the surrounding communities.
According to an NRC inspection report released in May 2011, there has been "moderate to severe" degradation of the concrete in a tunnel that is a vital part of the reactor's cooling system used to prevent a nuclear meltdown. The structure has lost twenty-two percent of its strength due to groundwater saturation. In the case of the Seabrook plant, an alkali-silica reaction is occurring whereby micro-cracks form as groundwater mixes with the concrete. This degradation poses a nuclear safety threat by weakening the electrical tunnel and possibly-as the NRC acknowledges-the plant's foundation where it comes in contact with groundwater.
Further, it raises serious questions about the plant's ability to withstand an earthquake.
This represents a failure on the part of the NRC to take appropriate action to address known safety problems at the Seabrook Nuclear Power Plant. I urge you to fuilly address all issues related to the concrete degradation immediately. We cannot allow nuclear power plants to operate when there are known safety issues.
Thank you for your consideration on this matter. If you have any questions or concerns, please contact Meghan Leahy at (617) 565-8519.
- incerely, John F. Kerry United States $enator ww: http:RIwwN.TeDtONe.govYLkeDry/
PRINTED ON RECYCLED PAPER
(!J'tiqrA>3:, o lic 11 f1ititet)
'Iti Ila:*lilltitllU 4,0C 20-51153 June 8.21 11 The Ihonorable Greg Jac/ko Chairman Nuclear Regulator Commission 11555 Rock, ille Pike Rockville. MD) 20852
Dear Chairman Jaczko:
We w\\rite to urge the Nuclear Rgui'aurx C* oi*
i, i NRC( i-imndiatcl\\
announce its intent to deny Nextira h!nergo Seabrook. the licese for the Seabrok nuclear pt-,,er plant.
it June 1, 2010 request flr a t, ent-year olrati:g liccnse that xould begi in 20Th and end in nuclear pv, cr reactor licen>cmcs Ir a t',cut' -ý -ar jcense
\\.,
a"
> scar a-v t11ntx.
Scars prior to the time their current licenses expire (iranting license extethiors s< tar TH ad\\ ance is particuiarly unw!ise i
,he wake of the Fukushima mcltdo* n-. a R
the NRC learn",f rre* x ulnerTbilities a1.5 nuclear pofer plant that uod iipaci :t fuurc I Kcn'in5 dck
'ln>
related tw
,O ner and cxiting icil ~ii,"
Moreo\\ er. there are addI tinal ginE and other,atet* iu.'
that ould not
.ossiblt be contemplatedl or ful* u.nder'tood a,ull
,\\'. e\\
ears in adl an.
of the nucleer reactor s end-oI-lhcenr~d-Iifc. a> exemtplified V* *.he \\Ia>
2*) an" i
Ic uv iI ]he 1, v.,'w (iib K nog that concrete surrounding a afety -related tunnel at thec Seabvok nu~clear pv>'cr plant had lost 22 that are slpp,. sed *t, help,.co tue Seabrook uc
.ileaZ p,,,.- pant ate c,,p,.rinc
- 1,,,
la ing dcTradatioii during the reactor
> "adeceneeK there i, impl* no xa* that the NRC can uuaraatnte tha.t it x< ili rem
~n "afte u~nt i it enter" its g*,Iden* \\ C'AT" a~mrn.', 4}, car-ifr n~ o*
The NRC i' eurrc n:
ci ni dering t',cnt- -3 car liccnsc rene\\\\al appliatiens for 16 em rea
- raktors at I I e, playfl !o.ati, n" e
l R("
cb ite.tate-"
\\ nu lear po,,ec plat licensee ma' a pply r a licinse rene,,al as carlx as 20 '. cars K-f,,e the,<piralion of its curren lieense7 Indeed, a.n examination of NRC reco rds ndkcate> that sincc 2!!00Q the NRC( ha" begun rel ic inse.'a i
!
- cighi e '
'mvr-
,r :.te. '.eanr and Rm Ph' c 'Ltes hnip xu,,, nrc.:e' reactors c'perma~i lc,-'
- . e*,cnc'a app
.na>-,< -cabrw k htmt, 4 hup a
'),
iv-C b,
.5. Wrt,
,.o
')
3
- c :
5 > I a,.-,flk.
,,,...... -.,_,s. -! ",ht...
Q111. ll4-
Page 2 letter to NRC June 8. 2011 closer to tx,.entv vears) before the reactors' current operating license expires.' In fact there is at least one case where rene'%al 'was granted more than 20 years in advance. According to its rene-,Nal application found on NRC's xwebsite. the Catax\\ba Nuclear Poxer Station I in South Carolina had its license rene\\\\ed 21 \\ears and 1 day before the previous license \\\\as set to expire
-There is little reason for such earl\\ consideration of a license renexýal application by the NRC. as the NRC expects to complete its rex ie\\ of renex\\al applications x'%ithin 30 months from recei1Ting the application, if a hearing is required. or N'ithin 22 months if no hearing is required.
An examination of NRC re-licensing records indicates that the NRC has appro ed license rene\\%als \\for 66 reactors \\\\ ith an aN crage time of 25 nionths from the time it recei*\\ es the application to the time the renexý al %k as approved If the understanding of the, ulnerabilities associated o, ith nuclear poxer plants ne\\ er changed, then making a decision in the \\,car 2012" to ailovx f!,or example) the Seabrook nuclear ewr plant to operate until the N ear 2050 migh, ýcem ra>onable. But this is not the case.
Some Safety and Aging Issues Might Not Be Knoi'n Decades In Advance As The Boston Globe artile>, noted. xaer seepage beneath the Seabrook poer plant has led to signi!,ant degradation of the concrete associated xx ith a tunnel that i> part of the reactor's cooling >5 stem. and Nexihra 2>u idenIcd 'cixded geci >uppxri.,. piping. and anchor bolts in otherarceas they inspcced". As the NRC noted in the Max 23 document entitled "Nextl ra Fnergy Sea1ook - NRC Iicense Rcntual11 tiun Rcp+,rt 05(100443 2_ 011007.( " "the jNRCI in~'*pcetion: team u a> unaNe tu airrive ai a c,.>
nelu>K'~n.ibuut the adcquaaQ of xour aging management rexievx ft, fhe alkali-silica reaction sue.'" a reaction bctxeen co.nercte and xjater that i> aIsvciatcd -, i!h 'ome of the concrete iructurcs at Seahr.>k If thcsc pr, Hems are
.-,urtian; a mere 21, car into Scabrook > opeiating :ic. i: >ecm> :mp,.'dble t,, co.nc lde that thec reactor can be safely operated betxcen the xcars 2030-50.
Additoitai e l~imate change ha.s the potcntial to impact nuclear poxx ci pants through increased temperature> of cooling xxater. rising sea lexelŽ. more frejucnt and sc, cre heat N'axes and more ntcne rainta, ith a>s, jated tlo.dir Rep \\larke-made a re:qucw t+ the Gox erminet A,\\ceolntail it*
JI+1h e 2in 10,,,+ re), i o
thc adequacy uI N R( rCgut.ins gil. en Shttp.,,, ',,
nrc ax rca
.r5
-pc d rg l
> In,.'I cL,+*
o r-mccmr<'
L J.
&kc-lra p*f P hnp
- c1 o*
h aI*h::
x
,*cath:ic:
dIg-114. cDr A craht'r
[:tl : *,',',* *::c *:, r*-*i
- , * : cra :
- c::,::g :C :t."*,,.*
- 2
,:> :q&[*1,<2" } ior htt ric.-1 IN
',u:*o 0
-53 icV:
- 5
_:r
- a~
o
-:~,+-:cc*-,a rp
Page 3 Letter to NRC June 8, 2011 climate change. -2 In 2007. the Bro%%ns Ferry unit 2 reactor in Alabama had to shut down because the intake water was so warm that, after being warmed nearly 30'F going through the plant, its release back into the environment would have violated the Clean Water Act.1'1 Moreover. for some coastal nuclear power plants such as Seabrook, a January 2011 study shows that the storm surge from a Category 4 or 5 hurricane could completely inundate the plants within their expected operating lifetimes.' 4 But sea level rise may be even more rapid than was understood in 2007, given the accelerating melting of the Greenland and Antarctic ice sheets.' 5 Current projections of sea level rise suggest an average 4 foot rise from 1990 levels by 2100.16 The NRC Has Not Incorporated the Lessons of Fukushima Into its Regulations or Analysis The Japanese nuclear meltdown shows how readily a total loss of electricity can result in major radiation release - and many have speculated that this vulnerability may have been especially pronounced in Japan because the nuclear reactors involved are much older designs. A staff report recently issued by Rep. Markey's office17 details some of the most glaring safety vulnerabilities exposed by the Fukushiima events. As operating nuclear power plants reach the end of their initial forty year lifetime mad enter their twenty year extended operation periods, there is certain to be new information about aging-related safety issues that the NRC should be continually evaluating.
Additionally, as has been noted previously,' 8 we are concerned that the Commission has granted license extensions for four nuclear reactors since the Fukushima meltdown without requiring licensees to comply with the requirements of NEPA that any "new and significant" information regarding the environmental consequences of operating the nuclear reactor be included in the application. It is clear that the environmental consequences of Fukushinma will be "new and significant" compared to those that had been previously contemplated, and that an assessment of NRC's safety regulations will also reveal "new and significant" vulnerabilities when viewed through the post-Fukushima lens. The NRC should not be approving any license extensions, let alone those that are only needed to continue operations more than a decade from now, before all of these vulnerabilities are both fully understood and addressed.
Given the changes to our planet, as well as changes to our understanding of safety-related vulnerabilities brought on by either accidents, extreme weather or geologic events, or unanticipated safety problems, the NRC should end its practice of accepting and granting license extensions twenty years before the license expires - and should reject those that it has already
- hup:'nariey.housc.gov'docs gaoinspection.pdf 13 hup:'.,i ww.ucsusa.org assets'documents'nucclearpoweri2007 1204-ucs-brief-got-water.pdf 14 linkinighub.dslevier.comretrieve.piiýS0301421510007329 15 hup:.'ýw* w.agu.org'pubs.cro.sref 201 ! 201 ] GLO46583.shunl W hup::: %,*w.nature.com climate:2010'1004 fullclimate.20 I 0.29.himl
" hutp: markey.howe.gov 'index.php?opiion-content&task-=-- iew& idý4352& Ihemid-125
ýhtnp: '..demoerats.na uralresow'cti.hkuss.gov.'sitesddmocruts.r-sur~cmmtee~hoe.gov f-ilasidocuuments "200 I-05- 03_E.JMtoNRCNEPA.pdf
A Page 4 Letter to NRC June 8, 2011 received until the reactor has operated for more time so that potential safety problems can be identified and more fully understood. The NRC should stop making the dangerous assumption that risks, and our understanding of them, will remain static for decades.
Sincerely, Edward J.MNI ey Jon
/
Ticerney
COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS SENATE STATE HOUSE BOSTON 02-133-1,053 SENATOR STEVEN A. BAODOUR CHAIRMAN:
TRANSPORTATION FSSr ESSEX DISTRICT ROOM 208. STATE HOUSE VICE-CHAIRMAN:
TEL. (61,7) 722-1604 THE JUDICIARY F-,: (617) 722-1,998 Steven..Boddourgstate.rna.us MEMBER:
WAYS 3 MEANS POST AUtIT S OVERSIGHT December 14, 2011 GLOat WARMING
~CONSUMER PROTtECTION FEODRAL STIMULUS OVERSIGHT The Honorable Greg Jaczkb Chairman Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
Dear Chairman Jaczko:
I am writing to express my deep concern for the public safety of the people and businesses of my district in light of disturbing new information that has come to light this year about the Seabrook nuclear power plant. -As the State Senator from Massachusetts' First Essex District that includes the communities of Amesbury, Haverhill, Merrimac, Methuen, Newburyport, North Andover (Precincts 1, 4, 6 and 8) and Salisbury, it is my responsibility to raise what I believe is a serious public safety issue for the people of my district and the many people who visit the region as tourists.
According to a Nuclear Regulatory Commission (NRC) report issued on May 23, 2011, the Seabrook plant has experienced concrete degradation due to years of groundwater infiltration.
Specifically, the NRC's inspection team identified concrete degradation characterized as "moderate to severe." The damage was found during a below grade inspection to the accessible portion of the foundation including electrical control tunnel B-a safety structure with vital electric cables that support the cooling system should a meltdown occur. The report indicates that because of the degradation there has been a substantial decrease in the strength and integrity of the concrete.
I commend your inspection team for its vigilance in identifying this significant problem.
It is very disturbing, however, that the NRC had to concede that it does not know the scope and severity-of the degradation throughout the plant's foundation. As the people of my communities know, a. building is no stronger than its foundation. I believe the NRC agrees because in November 2011, you notified other, nuclear power plants that. have these same emerging concerns relative to the type of:eonerete used at the Seabrook plant and about which they should be vigilant.
While I appreciate these initial protective steps, I am concerned-as are my constituents-that the plant's operators are rushing to relicense Seabrook-Given our mutual concerns regarding the structural integrity of the foundation at Seabrook,.1 urge your Agency to take the following action steps:
0 Halt relicensing until the Agency fully and comprehensively assesses the problem.
Require the Seabrook operators to fix both the degraded concrete and abate the groundwater infiltration.
Ensure that this problem is sufficiently resolved using tests and first-hand inspections over a multi-year time frame.
Finally, Seabrook Station should not be considered for relicensing based on the paperwork-"aging managelfient plan" submitted by the Seabrook opeiators;,a paperwork promise to fix the plant is simply not adequate for a matter of this dimension.
There are 18 years left before the current operating expires and I do not believe that given the recently identified problems at the plant, that re-licensing should proceed. The alkali-silica reaction is a new, thorny problem that your staff has thankfully identified, but will require years of intensive research, assessment, and monitoring before relicensing should be even considered.
The safety of the people, businesses, and tourists of Massachusetts' First Essex District is of paramount importance and they deserve complete assurance that there will be no need for Seabrook's emergency sirens to sound the warning to evacuate their communities.
Thank you for your continued vigilance in protecting public safety. I look forward to your detailed response and to working with you on this issue.
"'ST¶-n A. Baddour State Senator First Essex District
(tongrefs of the Eniteb btateg touge of Atprt ntatibed Waoington, 3C 20515 April 13, 2012 The Honorable Greg Jaczko Chairman Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
Dear Chairman Jaczko:
We write to request that the Nuclear Regulatory Commission (NRC) immediately plan and convene a public meeting at a location near the Seabrook Nuclear Power Plant to discuss the alarming degradation of concrete found in a safety-related tunnel due to its exposure to water.
We believe that the NRC's current plan to conduct its sole meeting on this topic at its headquarters in Maryland on April 23 severely limits the ability of those who live and work near the facility to fully understand the nature of this safety-and aging-related problem. We additionally request that such a meeting be conducted using a traditional public format that allows attendees to hear all presentation materials, questions and answers, as opposed to the "open house" style meeting that NRC recently has started to utilize that seems to enable only small group or one-on-one question and answer sessions. It also would be our expectation that appropriate NRC technical subject matter experts be present and available at this meeting to answer questions the public may have. Finally, we encourage you to consider locations in both Massachusetts and New Hampshire for such a meeting.
We wrote you on June 8, 2011 'urging the Commission to announce its intent to deny NextEra Energy Seabrook, the licensee for the Seabrook nuclear power plant, its June 1, 20 10 requese for a twenty-year operating license that would begin in 2030 and end in 2050. We made this request in part on the grounds that there are likely to be additional aging and other safety issues that could not possibly be contemplated or fully understood twenty years in advance of the nuclear reactor's end-of-licensed life. One such issue is clearly the degradation in safety-related concrete structures that led NRC to send a letter3 to NextEra requesting it to attend a meeting to discuss the issue at NRC headquarters on April 23, 2012. If safety structures that are supposed to help cool the Seabrook nuclear power plant are experiencing such alarming degradation during the reactor's 'adolescence', there is simply no way that the NRC can guarantee that it will remain safe when it enters its 'golden years' almost 40 years from now.
1 http://markey.house.gov/document/201 I/letter-nrc-regarding-seabrook-0 I http://www.nrc.gov/rcactors/operating/licensing/renewal/applications/seabrook.htmi 3 ADAMS accession number ML120480066 PiNTEDO N RECYCLED PAPER
The concerns related to Seabrook's concrete structure were also raised by the International Atomic Energy Agency when it recently released a report 4 detailing an inspection conducted at the Seabrook plant. The inspection team found that the concrete degradation could have been identified earlier had the licensee taken steps to look for it, and that the licensee knew that water was present in proximity to the concrete structures.
We continue to believe that it is grossly premature, as a matter of general policy and in this specific case, to proceed with the license extension process for a nuclear reactor whose current license remains valid until 2030. The concrete degradation found at Seabrook amplifies these views. But it also raises more immediate questions about whether the reactor at Seabrook can be expected to safely operate during the next eighteen years of its existing license. We are pleased that the Commission is continuing to explore this matter, and we urge you to continue and expand upon these efforts. However, we also believe that any failure to conduct a second public meeting on the topic at a location near the Seabrook facility would further undermine the public trust in the Commission's ability and willingness to assure the safety of the reactor. We urge you to quickly schedule such a meeting, and look forward to your prompt response to this request.
Sincerely, Edward J. Markey oln F. Tierey w
4 http://Pbadupw-s.nrc.gov/docs/ML I 28/ML 1208 1 A 05.ndf
[ongreg of tbe fAniteb atate Wagbington, MC 20515 November 30, 2011 The Honorable Greg Jaczko Chairman Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
Dear Chairman Jaczko:
We write to express our concern that the Nuclear Regulatory Commission (NRC) has not taken any mandatory action to address problems related to the dissolution of concrete in safety-related systems at nuclear power plants. This problem was first described in a May 30, 2011 article in The Boston Globe' noting that concrete surrounding a safety-related tunnel at the Seabrook nuclear power plant had lost 22 percent of its strength due to being saturated with water for the past decade. Yet instead of taking mandatory action to address a known safety vulnerability, the NRC has chosen to merely issue what amounts to an 'FYI' to its licensees that does not require any "specific action or written response".2 As The Boston Globe article3 noted, water seepage beneath the Seabrook power plant has led to significant degradation of the concrete associated with a tunnel that is part of the reactor's cooling system, and NextEra also identified "corroded steel supports, piping, and anchor bolts in other areas they inspected". As the NRC noted in the May 23 document entitled "NextEra Energy Seabrook - NRC License Renewal Inspection Report 05000443/2011007," "the [NRC]
inspection team was unable to arrive at a conclusion about the adequacy of your aging management review for the alkali-silica reaction issue," a reaction between concrete and water that is associated with some of the concrete structures at Seabrook.
On November 18, 2011, the NRC issued "Information Notice 2011-20: Concrete Degradation by Alakali-Silica Reaction" to its licensees. The document describes the process by which concrete can be degraded in the presence of water, describes methods that the American Society for Testing and Materials recommends to test concrete for vulnerability to these sorts of problems during testing, and notes that when Seabrook was constructed, some of these methods were utilized but the problems later occurred anyway. The document also notes that the American Concrete Institute has published a means to evaluate concrete at nuclear power plants after construction to assess whether such degradation has occurred, and describes further technology that could be used to confirm the presence of any suspected degradation.
Yet despite the existence of known methods to periodically assess concrete in nuclear power plants to determine whether it has experienced this sort of degradation and technologies that can verify any suspected problems, the NRC document states that there are currently no regulatory requirements that these be utilized. And moreover, the NRC document contains no
'httpJ/articles.boston.com/2011-05-30/lifestyle/29600250_
I nrc-seabrook-station-nuclear-power-plant 2 See NRC Information Notice 2011-20 3 http'/articles.boston.com/2011-05-30/lifestyleJ29600250_1 nrc-seabrook-station-nuclear-power-plant PRINTE* ON RECYCLED PAPER
further direction to its licensees - the methods described are apparently just suggestions that could be undertaken on a voluntary basis.
This is a failure to take decisive regulatory action to address known safety vulnerabilities at nuclear power plants. We urge you in the strongest possible terms to take immediate steps to require licensees a) to conduct periodic inspections to assess whether similar concrete degradation of safety-related structures has occurred b) to report all findings to the Commission, and c) to mitigate the effects of any such degradation. Please provide us with your response to this request no later than close of business on December 16, 2011.
Thank you for your consideration of this important matter. If you have any questions or concerns, please have your staff contact Michal Freedhoff (Rep. Markey, 202-225-2836) or Kevin McDermott (Rep. Tierney, 202-225-8020).
Sincerely, Edward J. M~ake
- Jo FTierney
HOUSE OF REPRESENTATIVES STATE HOUSE, BOSTON 02133-1054 MICHAEL A. COSTELLO Committeevine REPRESENTATIVE 1 st ESSEX DISTRICT ROOM 254, STATE HOUSE Tel. (617) 722-2220 Fax (617) 722-2821 AMESBURY NEWBURYPORT SALISBURY The Honorable Greg Jaczko Chairman Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
Dear Chairman Jaczko:
I am writing to express my deep concern for the public safety of the people and businesses of my district in light of disturbing new information that has come to light this year about the Seabrook nuclear power plant. As the State Representative for the First Essex District that includes the communities of Amesbury, Newburyport, and Salisbury, it is my responsibility to raise what I believe is a serious public safety issue for the people of my district and the thousands of people who visit the region annually as tourists.
According to a NRC report issued on May 23, 2011, the Seabrook plant has experienced concrete degradation due to years of groundwater infiltration. Specifically, the NRC's inspection team identified degradation characterized as "moderate to severe." The damage was found during a below -grade inspection to the accessible portion of the foundation, including electrical control tunnel B - a safety structure with vital electric cables that support the cooling system should a meltdown occur. The report indicates that because of the degradation there has been a substantial decrease in the strength and integrity of the concrete. I commend your inspection team for its vigilance in identifying this significant problem.
It is very disturbing, however, that the NRC had to concede that it does not know the scope and severity of the degradation throughout the plant's foundation. I believe the NRC recognizes the importance of the foundation's integrity. In November 2011, the NRC notified other nuclear power plants that have concrete foundations similar to the one at Seabrook to be vigilant about this issue.
While I appreciate these initial protective steps, I am concerned - as are my constituents - that the plant's operators are rushing to relicense Seabrook. Given our mutual concerns regarding the structural integrity of the foundation at Seabrook, I urge the NRC to take the following action steps:
Halt relicensing until the Agency fully and comprehensively assesses the problem.
Require the Seabrook operators to fix both the degraded concrete and abate the groundwater infiltration.
0 Ensure that this problem is sufficiently resolved using tests and first-hand inspections over a multi-year time frame.
Finally, Seabrook Station should not be considered for relicensing based on the "aging management plan" submitted by the Seabrook operators; a paperwork promise to fix the plant is simply not adequate for a matter of this dimension.
There are 18 years left before the current operating expires, and I do not believe, given the recently identified problems at the plant, that re-licensing should proceed. The alkali silica reaction is a new, thorny problem that your staff has thankfully identified, but will require years of intensive research, assessment, and monitoring before relicensing should be even considered.
The safety of the people, businesses, and tourists of Massachusetts' First Essex District is of paramount importance and they deserve complete assurance that there will be no need for Seabrook's emergency sirens to sound the warning to evacuate their communities.
Thank you for your continued vigilance in protecting public safety. I look forward to your detailed response and to working with you on this issue.
Sincerely, Michael A. Costello State Representative
CIT O iY_
__R
.JAMVIES J3. ~iO-1REN1-fN[
N -AYOR CITY HALL, ROOM 100
-'0UP -IJMNIER STRE7T PHONE 978-374-2300 FAX 978-373-7544
' /V ',. C I. H A RS H I L L. 7.IA. U £ March 29, 2012 The Honorable Greg Jaczko Chairman Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 RE: Seabrook Nuclear Power Plant
Dear Chairman Jaczko:
As Mayor of the City of Haverhill, a short distance from the Seabrook Nuclear Power Plant, I'm writing to express my concern about information that has come to my attention concerning the Seabrook Nuclear Power Plant.
l am concerned about the concrete degradation of certain of the tunnels in the plant. I have received a copy of a report dated May 23, 2011 concerning this. I commend your inspection team for identifying this problem.
I understand there is an effort underway to relicense the Seabrook Nuclear Power Plant. I urge you to make certain that the Seabrook operators have a plan to fix the degraded concrete and repair this problem prior to relicensing.
Thank you for your attention to this matter.
Very truly yours, James J Fiorentini, Mayor of Haverhill JJF/lk Cc: Joanna Hammond
CITY OF NEWIBURYPORT IN CITY COUNCIL ORDERED:
Date:
January 30,2012 RESOLUTION ON SEABROOK STATION RELICENSING Whereas, in May 2011, the Nuclear Regulatory Commission(NRC) reported that concrete degradation caused by an alkali-silica reaction had significantly weakened foundation structures at the Seabrook nuclear power plant; and Whereas, the NRC has stated that such degradation has affected a safety structure at the plant; and Whereas, the NRC admitted it did not know the extent and severity of the degradation throughout the plant's foundation where groundwater has saturated the concrete; and Whereas, Seabrook Station is the only commercial reactor in the United States with confirmed structural concrete degradation affecting a safety structure; and Whereas, in light of this condition, the NRC has notified all commercial reactors in the United States to search for similar concrete degradation due to alkali-silica reaction; and Whereas, the Nuclear Regulatory Commission has the primary responsibility to regulate commercial nuclear reactor operations and protect public safety related to said operations; Therefore, be it resolved that the Newburyport City Council request the Nuclear Regulatory Commission to take the following steps:
- Immediately halt all relicensing activities related to Seabrook Station;
- Conduct peer-reviewed studies of the reactor's ability to withstand seismic activity with compromised structural concrete, and publicly report the results of these studies;
- Fully investigate the causes of the unabated groundwater infiltration and resulting concrete degradation, and publicly report the results of such investigation;
- Devise a corrective action program to address both groundwater infiltration and concrete degradation throughout the facility; e Require the owner and operator of Seabrook Station to take corrective measures to stop groundwater infiltration and related concrete degradation; a Inspect and monitor the results of those corrective measures over a sustained (multiyear) period of time to ensure that corrective measures are effective;
I,
- If, following corrective measures and sustained monitoring, the Nuclear Regulatory Commission determines that degradation of safety structures has not abated, that it suspend the license to operate Seabrook Station until safe operation of this reactor can be assured.
Councillor Kathleen O'Connor Ives Councillor Edward C. Cameron
/Kouneillor Barry N. Connell Councillor Robert J. Cronin In City Council January 30, 2012 Motion to approve by Councillor Connell, seconded by Councillor Cameron. Roll call vote, 10 yes, I absent (Heartquist). So voted.
Approve: it2et#
Donna D. Holaday, Mayor I
B. Jones, City Clerk Date:
/j
/
TOWN OF WEST NEWBURY 0BOARD OF SELECTMEN z
1910 TOWN OFFICE BUILDING 0
381 Main Street, West Newbury, Mass. 01985
-- Phone: 978-363-1100, Ext. 115 Fax: 978-363-1117 selectmen@wnewbury.org April 5,2012 Gregory B. Jaczko, Chairman Nuclear Regulatory Commission Mail Stop O-16G4 Washington, DC 20555-0001
Dear Mr. Jaczko,
During recent public debate, concerns have been raised about perceived safety issues at the NextEra Energy Seabrook Station nuclear power facility in Seabrook, New Hampshire (Seabrook Station). These concerns have come from media reports and more specifically from a Nuclear Regulatory Commission (NRC) report dated May 23, 2011 regarding alkali-silica reaction (ASR) found in concrete at the Seabrook Station facility (see report 05000443/2011007).
The West Newbury Board of Selectmen considers safety of residents our primary concern and these reports raise worry about the long-term safety of Seabrook Station. Specifically, the NRC report details areas of concern that should be addressed publicly in an open and transparent manner to speak to and alleviate public concerns.
The West Newbury Board of Selectmen requests the Nuclear Regulatory Commission take the following steps:
- 1. The NRC report details ASR issues with below grade concrete structures.
Engineering studies regarding the extent of compromise of those structures from ASR including potential impact to seismic and other safety requirements should be publicly reported. If corrective actions are needed, such actions should be detailed and publicly disseminated.
- 2. A plan for abating groundwater infiltration causing the ASR at the Seabrook Station site should be developed and implemented as soon as possible, with frequent public communication during the planning, implementation, and completion of such project.
- 3.
The Nuclear Regulatory Commission should review Seabrook Station audit and inspection policies and procedures to determine if they are adequate to insure plant infrastructure remains safe for operations now and the future.
- 4. As the Seabrook Station facility ages, the Nuclear Regulatory Commission should take a more open and proactive stance in communicating to neighboring municipalities of Seabrook Station. More open and transparent lines of communication can only increase confidence in Seabrook Station policies, procedures, and plant safety.
- 5. Most importantly, the West Newbury Board of Selectmen insists the facility re-licensing process not be completed if safety issues remain outstanding at Seabrook Station.
Seabrook Station and the Town of West Newbury have been good neighbors during the facility's twenty-two years of operations. We appreciate that the Nuclear Regulatory Commission and NextEra Energy will fully prioritize these areas of concern and will communicate about these issues in an open and transparent manner.
Sincerely, WEST NEWBURY BOARD OF SELECTMEN Albert H. Knowles, Jr., Chairman Thomas M. Atwood Richard J. Cushing
Town of Salisbury 5 Beach Road Salisbury, Massachusetts 01952 Board of Selectmen (978) 462-8232 ext. 100 Henry Richenburg, Chairman Donald W. Beaulieu Fred Knowles Ed Hunt Jerry Klima May 21, 2012 The Honorable Greg Jaczko, Chairman Nuclear Regulatory Commission 1555 Rockville Pike Rockville, MD 20852
Dear Chairman Jaczko,
I am writing on behalf of the Board of Selectmen of the Town of Salisbury to express our concern for the safety of the people and businesses of our town and the surrounding area in light of the recent discovery that groundwater infiltration has caused concrete degradation at the Seabrook, NH nuclear power plant.
We are concerned that the concrete degradation discovered at Seabrook Station is a novel problem for the nuclear industry and that it has already weakened the structure of safety-related parts of the plant. We are also concerned that unless the ground water infiltration problem is solved, the concrete at the plant will continue to degrade.
The Town of Salisbury is adjacent to the Town of Seabrook and well within the danger zone from any possible release of radioactivity. Any problem that affects the structural integrity of safety-related aspects of Seabrook Station must be handled in the most conservative and careful manner to protect the safety of those who live and work nearby.
We appreciate the vigilance of the inspectors of Seabrook Station who discovered the problem. We also appreciate the openness of the response so far both by the NRC and by Seabrook Station's operator, as well as the thorough investigation of the problem that is now underway.
We understand that even though 18 years remain on the term of the operating license for Seabrook Station, the operator has applied to the NRC for a twenty-year extension of its operating license. These circumstances present the NRC with an opportunity to thoroughly evaluate the problems at Seabrook Station and ample time to design a solution and make sure it is effective without adversely affecting the licensee.
4 Hon. Greg Jaczko May 21, 2012 Page two We request that the NRC not take action to grant the requested license extension for Seabrook Station until
- 1. a thorough evaluation of the concrete degradation and groundwater infiltration issues affecting all safety-related structures is completed,
- 2. a remediation plan for both the concrete degradation problem, and the groundwater infiltration problem is developed,
- 3.
the NRC concludes that Seabrook Station's operator and personnel fully understand the problems and can successfully implement the plan, and
- 4. enough time has elapsed after the remediation plan is implemented to allow the NRC to determine that it is effective.
We urge the NRC not rush to judgment on granting the license extension. Delaying the extension will not adversely affect the licensee, but will give time to evaluate and solve a novel and serious problem that endangers public safety.
Sincerely, Henry Richenburg Chairman cc: Board of Selectmen
Town Of Newbury Office of The Board of Selectmen Newbury, Mass. 01951-4799
~
978-465-0862 x 302 Fax: 978-465-3064 April 24, 2012 The Honorable Greg Jaczko, Chairman Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 Re:
Seabrook Station
Dear Chairman Jaczko:
We are writing to express our deep concern for the public safety of the citizens and businesses of the Town of Newbury. Our concern is the result of the new information that has come to light about the Seabrook Station nuclear power plant through the re-licensing process.
As a result of this new information, the Newbury Board of Selectmen request that the Nuclear Regulatory Commission take the following steps:
- 1. Conduct peer-reviewed engineering studies of the ability of below grade concrete structures with compromised structural concrete to withstand seismic activity and other safety requirements, and publicly report the results of these studies. If corrective actions are needed, such actions should be detailed and publicly disseminated.
- 2. Fully investigate the causes of the unabated groundwater infiltration and resulting concrete degradation, and develop a plan for abating groundwater infiltration at the Seabrook Station site and implement the plan as soon as possible, with frequent public communication during the planning, implementation and completion of such project.
- 3. Inspect and monitor the results of these corrective actions over a sustained (multiyear) period of time to ensure that corrective measures are effective.
- 4. The Nuclear Regulatory Commission should review Seabrook Station audit and inspection policies and procedures and develop a list of improvements that will insure that the plant infrastructure remains safe for operations now and in the future.
- 5. As the Seabrook Station facility ages, the Nuclear Regulatory Commission should take a more open and proactive stance in communicating to neighboring municipalities of Seabrook Station
- 6. Most importantly, the Newbury Board of Selectmen respectfully request that the facility re-licensing process not be completed if any short-term or long-term safety issues remain unresolved at Seabrook Station.
It is our hope that the Nuclear Regulatory Commission and Next Era Energy will make these areas of concern a top priority as the re-licensing process moves forward and will communicate about these issues with our board and the general public in an open and transparent manner.
More open and transparent lines of communication can only increase confidence in Seabrook Station policies, procedures and plant safety.
Sincerely, NEWBURY BOARD OF SELECTMEN I-
TOWN OF MERRIMAC OFFICE OF THE BOARD OF SELECTMEN 2-8 School Street, Merrimac, MA 01860 TEL (978) 346-8862 FAX (978) 346-7832 E-MAIL Selectmen(5townofmerrimac.com August 27, 2012 The Honorable Greg Jaczko Chairman Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
Dear Chairman Jaczko:
The Board of Selectmen has recently become aware of what we feel are serious issues regarding the concrete degradation of tunnels at the Seabrook Nuclear Power Plant. We have reviewed a copy of the Nuclear Regulatory Commission (NRC) report dated May 23, 2011 addressing these issues. This is of great concern to us and our community as we are within the danger zone from any possible release of radioactivity. Although we appreciate the efforts of the inspectors who discovered the problem, we ask that the NRC report details of the areas of concern are addressed publicly in an open and transparent manner to speak to and alleviate public concerns.
We have learned that Seabrook has applied to the NRC for a twenty year extension of its operating license although 18 years remain on the term of the current license. We urge the NRC to use this time to thoroughly evaluate the issues at Seabrook Station so that you can work to find an effective solution to ensure safety now and in the future.
Sincerely, Merrimac Board of Selectmen W. Earl Baumgardner Ricky 1 o La ra D. Mailman