Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML12310A362
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/29/2012
From: Mims D
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06613-DCM/MAM/TLC, EA-12-051
Download: ML12310A362 (3)


Text

EA-1 2-051

  • AMA subsidiary of Pinnacle West CapitalCorporation Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Senior Vice President Tel: 623-393-5403 P.O. Box 52034 Generating Station Nuclear Regulatory and Oversight Fax: 623-393-6077 Phoenix, Arizona 85072-2034 102-06613-DCM/MAM/TLC October 29, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

References:

1. NRC Order Number EA-1 2-051, "OrderModifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation,"

dated March 12, 2012

2. NRC Interim Staff Guidance JLD-ISG-2012-03, "Compliancewith Order EA- 12-051, Reliable Spent Fuel Pool Instrumentation,Revision 0," dated August 29, 2012

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued an order (Reference 1) to Arizona Public Service (APS). Reference 1 was immediately effective and directs APS to have a reliable indication of the water level in associated spent fuel storage pools. Specific requirements are outlined in Attachment 2 of Reference 1.

Reference 1 requires submission of an initial status report 60 days following issuance of the final interim staff guidance. The final interim staff guidance (Reference 2) was issued August 30, 2012. The purpose of this letter is to provide the initial status report pursuant to Section IV, Condition C.2, of Reference 1 within 60 days following issuance of Reference 2. This report confirms APS has received Reference 2 and is in the process of evaluating the guidance for the purpose of providing a reliable indication of the water level in associated spent fuel storage pools as described in Attachment 2 of Reference 1.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • San Onofre ° South Texas
  • Wolf Creek

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Initial Status Report in Response to Order Number EA-12-051 Page 2 Major activities completed during this reporting period:

0 Resources are being identified and project plans initiated, including development of milestones, to assure compliance with Reference 1.

Planned activities for the next six months:

  • Development and submittal of the overall integrated plan.
  • Selection of a vendor for system design.
  • Begin walkdowns and development of modifications.

Technical difficulties encountered that could affect the ability to provide the licensee's February 28, 2013, submittal:

  • None at this time.

Project milestones schedule through completion of installation and testing:

  • A project milestones schedule will be provided with the overall integrated plan.
  • Implementation of the order will be completed for PVNGS Unit 1 prior to startup from Refueling Outage UIR18 (Fall 2014).

" Implementation of the order will be completed for PVNGS Unit 3 prior to startup from Refueling Outage U3R18 (Spring 2015).

" Implementation of the order will be completed for PVNGS Unit 2 prior to startup from Refueling Outage U2R19 (Fall 2015).

This letter contains no new regulatory commitments. Should you have any questions concerning the content of this letter, please contact Mark McGhee, Operations Support Manager, Regulatory Affairs, at (623) 393-4972.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on_ _ _ _

(bate)

Sincerely, DCM/MAM/TLC/hsc

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Initial Status Report in Response to Order Number EA-12-051 Page 3 cc: E. J. Leeds, NRC Director, Office of Nuclear Reactor Regulation E. E. Collins Jr. NRC Region IV Regional Administrator L. KX -Gibson NRC NRR Project Manager for PVNGS M. A. Brown NRC Senior Resident Inspector for PVNGS L. M. Regner NRR/JLD/PMB, NRC B. A. Purnell NRR/JLD/PMB, NRC S. R. Jones NRR/DSS/SBPB, NRC