MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] |
Text
0 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 612 EAST LAMAR BLVD, SUITE 400 A ",Cc ARLINGTON, TEXAS 76011-4125 March 26, 2009 (b)(7)(C)
SUBJECT:
CONCERN YOU RAISED TO THE NUCLEAR REGULATORY COMMISSION (NRC) REGARDING CALLAWAY PLANT RE: ALLEGATION RIV-2006-A-0033 Dear.7)0 ..
This is a follow-up to a discussion Bill Jones and I had with you in Columbia, Missouri, on February 18, 200 asgodatpwith the NRC's review of your concern involving an inattentive Callaway PlantFr")(")C)' ITo summarize the reviews and investigations that were performed, the NRC received your original concerns in a letter dated April 13, 2006. You subsequently provided the NRC with clarifying information and in December 2006 the NRC provided closure of one of your concerns. In April 2007, the NRC informed you that Allegation RIV-2006-A-0033 was closed and that baqe-d. nn-.h..- , C'S inspections and investigations the NRC was not able to substantiate that the (b)(7)(c "Jwasinattentive or that you were discriminated against. In our letter dated April 16, 200", the NRC provided the bases for the unsubstantiated determinations. These determinations were made based on the NRC's independent inspections and the results of the two investigations performed 1 fhpiyNR. ice of Investigations that are documented as Reports No 4-2006-025 (inattentivel(b)(7)(C) and 4-2006-035 (discrimination).
In October 2007, you met with Mark Haire, Senior Operations Engineer, and me to discuss the NRC's disposition of Allegation RIV-2006-A-0033. During this discussion, you provided the name of an additional individual for the NRC to interview as a witness to the inattentive (b)(
1(b)(7)(C) jissue. The NRC re-opened the allegation concern and conducted a supplemena investigation to the investigation documented as Investigation Report Number 4-2006-025. The NRC's Office of Investigations conducted over 60 interviews associated with thel(b)(7)(c) inattentiveness issue (including an additional 39 interviews associated with the supplemental investigation) and reviewed associated records. One individual identified that he/she had observed thel(b)(T7)C) Iinattentive. However, numerous individuals who were potential witnesses and may have been in a position to observe activity in the control room during the summer/fall of 2005 were contacted and no additional testimony was provided to support a determination that thel(b)(7)(C) ]was inattentive on duty. The Office of Investigations concluded that the concern that al(b)(7)(C) Iwas willfully inattentive on duty was not substantiated.
CERTIFIED MAIL RETURN RECEIPT REQUESTED
...(b)(7)(c)[j 1 2 RIV-2006-A-0033 The NRC staff consulted with our Offices of General Counsel and Enforcement regarding the one individual who had identified that he/she had observed theLb7c being inattentive on duty, Based on the preponderance of the evidence developed, the NRC determined that there was not a sufficient basis to proceed with enforcement action against either the company or the individual.
Bill and I appreciated the time you spent in discussing this concern with us, and your perspectives on the investigations and our review of this matter. As the Chief of the Region IV Allegations and Enforcement Branch, Bill has been incorporating the lessons learned from our review of your concerns into our allegations review process and has shared your perspectives with our Office of Investigations. Allegations are an important source of information in support of the NRC's safety mission. We take our safety responsibility to the public seriously and will continue to do so within the bounds of our lawful authority. We believe that our actions in this matter have been responsive and unless the NRC receives additional information that suggests that our conclusions should be altered, we plan no further action on this matter.
Should you have any additional questions regarding our response, please contact Bill Jones at 800-952-9677 extension 182 or you can call Ms. Bernadette Baca, Senior Allegations Coordinator, on the NRC Safety Hotline at 800-695-7403 Monday - Friday between 8 a.m. and 4:30 p.m. central time.
Sincerely, Roy'J. Caniano, Director Division of Reactor Safety
1*
- w, 3 RIV-2006-A-0033 bcc w/Statement of Concerns:
Allegation File SEDR COPLT THI SETO COPLT THI SETONOELVR M Complete items 1,2, and 3. Also complete (b7)C Item 4 IIfRestricted Delivery Is deSired.
" Print your name and address on the reverse PO Addr.
1.
so that we can return the card to you.
" Attach this card to the back of the maliplece, or on the front if space permits. /
I-D, ate of De ds-eliery address different from item 1 I Yes IfYES, enter delivery address below: U No
] 3. Service Type Certifled Mail [3 Epress Mail
/ 3 Registered fieturn Receipt for Mercha
[- Insured Mall E C.O.D.
~. 3 4. Restricted Delivery? (Extra Fee) 0 yes
- 2. Article Number itaorI~fufl DUVIlflwJU-U tUltI
)t~-J
- D/* i )G,) I 102595-02-1 PS Form 3811, February 2004 Domestic Return Receipt I)ILC
%I
-'~
aI to e S:\RASMACES\ALLEGATIONS\2006 Case Files\RIV-2006-A-00 IC to Alleger.doc U.
I ~ ~ , a ADAMS I No 10 SUNSI Review Complete IRel u~F J.. . .. ... ____ ____- ,-_,,__
.SAC; C:013 C:PBB C:AUI:
I BDBaca BStztle*rW VGaddy WBJones KI-u1I~rI RJCaniano' OFICA REtCORD COPY, ...* $ __ILEEm.
T" lpn F"Fax OFFICIAL RECORD COPY T='Telephone E=E-mail F=Fax