RNP-RA/12-0108, Replacement Enclosure Cover Page for Request for Technical Specification (TS) Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication
| ML12298A359 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 10/12/2012 |
| From: | Wheeler S Progress Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RNP-RA/12-0108 | |
| Download: ML12298A359 (4) | |
Text
Progress Energy 10 CFR 50.90 Serial: RNP-RA/12-0108 OCT 1 2 2012 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REPLACEMENT ENCLOSURE COVER PAGE FOR REQUEST FOR TECHNICAL SPECIFICATION (TS) CHANGES REGARDING TS 3.1.4 ROD GROUP ALIGNMENT LIMITS AND TS 3.1.7 ROD POSITION INDICATION By letter dated June 8, 2012, (Agencywide Documents Access and Management System Accession No. ML12172A260), pursuant to 10 CFR 50.90, Carolina Power and Light Company, now doing business as Progress Energy, requested an amendment to the H. B. Robinson Steam Electric Plant, Unit No. 2 renewed facility operating license DPR-23, Appendix A, Technical Specifications (TS) Sections 3.1.4, "Rod Group Alignment Limits," and TS 3.1.7, "Rod Position Indication." The cover page of the enclosure (page 1 of 9) to the June 8, 2012 letter erroneously indicated that there were four (4) attachments to the enclosure when there were only three (3) attachments.
Attached please find a replacement cover page (page 1 of 9) for the enclosure to the June 8, 2012 letter. There are no other changes or additions to the enclosure to the June 8, 2012 letter which provided technical and regulatory evaluations of the proposed change. There are no changes to the three attachments to the enclosure to the June 8, 2012 letter which presented the proposed TS page markups, the retyped TS pages, and marked up bases pages (for information only) for proposed changes to TS 3.1.4 and 3.1.7.
The correction to the list of attachments on the replacement cover page does not affect the conclusions of either the 10 CFR 50.92 No Significant Hazards Consideration Determination or the Environmental Consideration included in the enclosure to the June 8, 2012 letter.
This document contains no new Regulatory Commitments.
Progress Energy Carolinas, Inc.
Rol~inson Nuclear Plant 3581 West Entrance Road Hartsville, SC 29550
U. S. Nuclear Regulatory Commission Serial: RNP-RA/12-0108 Page 2 of 2 If you should have any questions regarding this submittal, please contact Mr. R. Hightower, Supervisor - Licensing/Regulatory Programs at (843) 857-1329.
I declare under penalty of perjury that the foregoing is true and correct. Executed On:
o2 4+"esr I&, z ol z Sincerely, Sharon A. Wheeler Manager - Support Services - Nuclear SAW/sjg
Attachment:
Replacement Page for Cover Page (1 of 9) of Enclosure to RNP-RA/ 12-0028 cc:
Ms. S. E. Jenkins, Manager, Infectious and Radioactive Waste Management Section (SC)
Mr. V. M. McCree, NRC, Region II Ms. A. T. Billoch-Colon, NRC Project Manager, NRR Ms. F. E. Saba, NRC Project Manager, NRR NRC Resident Inspectors, HBRSEP Mr. A. Wilson, Attorney General (SC)
Attachment to Serial: RNP-RA/12-0108 2 Pages (including cover page)
ATTACHMENT Replacement Page for Cover Page (1 of 9) of Enclosure to RNP-RA/ 12-0028 1 page
ENCLOSURE Evaluation of the Proposed Change
Subject:
Request for Technical Specification (TS) Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication
- 1.
SUMMARY
DESCRIPTION
- 2.
DETAILED DESCRIPTION
- 3.
TECHNICAL EVALUATION
- 4.
REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria 4.2 Precedent 4.3 No Significant Hazards Consideration Determination 4.4 Conclusions
- 5.
ENVIRONMENTAL CONSIDERATION
- 6.
REFERENCES ATTACHMENTS:
- 1.
Technical Specification Page Markups
- 2.
Retyped Technical Specification Pages
- 3.
Markups of TS Bases for "Information Only"