ML12293A076
| ML12293A076 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/16/2012 |
| From: | Arizona Public Service Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| References | |
| 102-06600-MLL/TNW/DFH | |
| Download: ML12293A076 (2) | |
Text
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED 10 CFR 50.54(p)
A4 suibsidiaty of Pinnacle IVest Capital Corporation Maria L. Lacal Mail Station 7605 Palo Verde Nuclear Vice President Tel. 623-393-6491 P.O. Box 52034 Generating Station Operations Support Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-06600-MLL/TNW/DFH October 16, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
Dear Sirs:
Subject:
Palo Verde Nuclear Generating-Station- (PVNGS)
Units 1, 2 and 3 Docket No. STN 50-528; 50-529; 50-530 and 72-44 License No. NPF-41; NPF-51; NPF-74 PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 15 Pursuant to 10 CFR 50.54(p), Arizona Public Service (APS) hereby submits Revision 15 of the Palo Verde Nuclear Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program (hereafter the Plan). This revision incorporates changes made to Palo Verde's owner controlled barriers. It also includes APS' response to NRC's Request for Additional Information dated September 11, 2012, for Revision 14 of the Plan.
APS has evaluated the Plan changes in accordance with 10 CFR 50.54(p) and concluded that the revision does not result in a decrease in the effectiveness of the Plan.
No commitments are being made to the NRC by this letter.
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway Comanche Peak
- Diablo Canyon
- Palo Verde
- San Onofre
- South Texas
- Wolf Creek
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED U.S. Nuclear Regulatory Commission PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 15 Page 2 The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Should you have questions concerning this matter, please contact Mr. Larry McKinney, Department Leader, Security Operations at 623-393-2736.
Sincerely, MLL/TNW/DFH/hsc Enclosures -
via FedEx
- 1) Palo Verde Nuclear Generating Station (PVNGS) Response to NRC Request for Additional Information, dated September 11, 2012, for PVNGS Physical Security Plan, Revision 14
- 2) Palo Verde Nuclear Generating Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 15
- 3) 10 CFR 50.54(p) Table of Changes cc: [cover letter only]
Mr. E. E. Collins Jr.
NRC Region IV Regional Administrator Ms. L. K. Gibson NRC NRR Project Manager [electronic / paper]
Mr. E. T. Byre Sr. Physical Security Inspector, RIV/DRS/PSB Mr. M. A. Brown NRC Senior Resident Inspector for PVNGS ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED