ML12277A076
| ML12277A076 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 09/28/2012 |
| From: | Diane Jackson Operations Branch I |
| To: | Ventosa J Entergy Nuclear Operations |
| Shared Package | |
| ML12214A189 | List: |
| References | |
| Download: ML12277A076 (5) | |
Text
,ffi UNITED STATES NUCLEAR REGULATORY COMi'IISSION REGION I 21OO RENAISSANCE BOULEVARD, SUITE 1OO KING OF PRUSSIA, PENNSYLVANIA 1940&2713 September 28, 2072 Mr. John Ventosa. Site Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 1051 1-0249
SUBJECT:
SENIOR REACTOR AND REACTOR OPERATOR lNlTlAL LICENSE EXAMINATIONS - INDIAN POINT ENERGY CENTER. UNIT 3
Dear Mr. Ventosa:
ln a telephone conversation on September 20,2012, between Mr. D. Silk, Senior Operations Engineer, and Mr. S. Davis, Superintendent Operations Training lLO, and Mr. C. Kocsis, Senior Staff Operations lnstructor, arrangements were made for the administration of licensing examinations at lndian Point Unit 3 during the week of February 11,2013.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by November 28,2012. The written examinations, operating tests, and the supporting reference materials identified in Attachment 3 of ES-201 will be due by December 28,2012. As discussed with Mr. Davis, delivery of the outlines, the exams, and supporting materials two weeks prior to the due dates shown above will help to ensure we meet the scheduled exam administration dates. Pursuant to Title 10, Section 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and marked appropriately. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.9., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
J. Ventosa 2
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. lf the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
This letter contains information collections that are subject to the Papenuork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of lnformation and Regulatory Affairs, NEOB-10202, (3150-0018),
Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html.
Thank you for your cooperation in this matter. Mr. S. Davis has been advised of the policies and guidelines referenced in this letter. lf you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. D. Silk at (610) 337-5372, or me at (610) 337-5306.
Donald E. J Operations Branch Division of Reactor Safety
J. Ventosa 2
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. lf the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
This letter contains information collections that are subject to the Paperuork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of lnformation and Regulatory Affairs, NEOB-10202, (3150-0018),
Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html.
Thank you for your cooperation in this matter. Mr. S. Davis has been advised of the policies and guidelines referenced in this letter. lf you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. D. Silk at (610) 337-5372, or me at (610) 337-5306.
Sincerely,
/RN Donald E. Jackson, Chief Operations Branch Division of Reactor Safety DOCUMENT NAME: G:\\DRS\\Operations Branch\\Silk\\Exam FY13-lP3 Feb 13 (U018661120dayexamltr.docx AnAr\\rq pKG' t\\iu 12214A1aq ADAMS ACCESSION NUMBER: ML12277A076 ADAMS PKG: ML 22144189 ADAMS ACCESSION NUMtsER:
V suNstReview V
Non-Sensitive n
Sensitive g
Publicly Available tr Non-PubliclyAvailable OFFICE RI/DRS/OB RI/DRS/OB NAME DSiIK DJackson DATE 9t21112 9t28t12 IAL COPY OFFIC
J. Ventosa Docket No. 50-286 License No. DPR-64 cc: Distribution via ListServ
J. Ventosa Distribution w/encl:
W. Dean, RA D. Lew, DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS 4
via E-mail)
RIoRAMATL RESOURCE)
RIORAMAlL RESOURCE)
RIDRPMAlL RESOURCE)
RIDRPMAlL RESOURCE)
RIDRSMAlL RESOURCE)
RIDRSMAlL RESOURCE)
S. Kennedy, Rl OEDO M. Gray, DRP B. Bickett, DRP S. McCarver, DRP M. Jennerich, DRP P. Cataldo, SRI N. Lafferty, Acting Rl D. Hochmuth, AA RidsNrrPMlndianPoint Resource RidsNrrDorlLpll -1 Resource ROPReports Resources D. Jackson, DRS D. Silk, Chief Examiner, DRS DRS Master Exam File (C. Bixler) (w/concurrences)