ML122710239

From kanterella
Jump to navigation Jump to search
NRC Initial Operator Licensing Operating Test Approval
ML122710239
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/26/2012
From: Vincent Gaddy
NRC/RGN-IV/DRP/RPB-C
To: Jacobs D
Entergy Operations
References
Download: ML122710239 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 September 26,2012 Donna Jacobs, Vice President, Operations Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000382/2012301

Dear Ms. Jacobs:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Waterford 3.

The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to John Signorelli, Facility Representative. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the operating test portion of the examination. The NRC staff will administer the operating tests during the week of October 1,2012. As of the date of this letter, we have not authorized the written examination. The written examination will be approved when the examination review is completed.

Please contact your Chief Examiner, Brian Larson, at (817) 200-1172, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

Sincerely, ViH1u+&~

Vincent Gaddy. Chief Operations Branch Division of Reactor Safety UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 September 26,2012 Donna Jacobs, Vice President, Operations Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000382/2012301

Dear Ms. Jacobs:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Waterford 3.

The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to John Signorelli, Facility Representative. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the operating test portion of the examination. The NRC staff will administer the operating tests during the week of October 1,2012. As of the date of this letter, we have not authorized the written examination. The written examination will be approved when the examination review is completed.

Please contact your Chief Examiner, Brian Larson, at (817) 200-1172, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

Sincerely, ViMlu+ 0t4r Vincent Gaddy. Chief Operations Branch Division of Reactor Safety

Waterford Steam Electric Station

- 2 Docket: 50-382 License: NPF-38

Enclosure:

ES-201-4 cc w/enclosure:

John Signorelli, Facility Representative Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 cc w/o enclosure:

Distribution via ListServ for Waterford Waterford Steam Electric Station Docket: 50-382 License: NPF-38

Enclosure:

ES-201-4 cc w/enclosure:

John Signorelli, Facility Representative Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 cc w/o enclosure:

Distribution via ListServ for Waterford