NRR E-mail Capture - Acceptance Review for ME9500/1 Turkey Point 3/4 - LAR 224 Regarding TS 3/4.6.2.3 - Recirculation Ph Control System and Natb Basket Loading Requirement
ML12270A445
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/25/2012
From: Farideh Saba
Division of Operating Reactor Licensing
To: Tomonto B
Florida Power & Light Co
References
TAC ME9500, TAC ME9501
Download: ML12270A445 (2)


Text

1 NRR-PMDAPEm Resource From:

Saba, Farideh Sent:

Tuesday, September 25, 2012 4:45 PM To:

Tomonto, Bob; Hanek, Olga

Subject:

Acceptance review for ME9500/1 TURKEY POINT 3/4 - LAR 224 regarding TS 3/4.6.2.3 -

Recirculation pH control system and NaTB Basket loading requirement Importance:

High

Bob, By letter dated September 6, 2012, Florida Power and Light Company (the licensee) submitted for a license amendment request (LAR) to the Renewed Facility Operating Licenses (RFOL) for Turkey Point Units 3 and 4. The proposed LAR would reduce the current TS 3/4.6.2.3 minimum required NaTB mass from 11,061 lbm to 7,500 lbm, leaving more than 1000 lbm of margin to the analyzed minimum of 6,427 lbm. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.

The acceptance review is also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1447 or via email by farideh.saba@nrc.gov.

Farideh E. Saba, P.E.

Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV

Hearing Identifier:

NRR_PMDA Email Number:

491 Mail Envelope Properties (Farideh.Saba@nrc.gov20120925164500)

Subject:

Acceptance review for ME9500/1 TURKEY POINT 3/4 - LAR 224 regarding TS 3/4.6.2.3 - Recirculation pH control system and NaTB Basket loading requirement Sent Date:

9/25/2012 4:45:19 PM Received Date:

9/25/2012 4:45:00 PM From:

Saba, Farideh Created By:

Farideh.Saba@nrc.gov Recipients:

"Tomonto, Bob" <Bob.Tomonto@fpl.com>

Tracking Status: None "Hanek, Olga" <Olga.Hanek@fpl.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1859 9/25/2012 4:45:00 PM Options Priority:

High Return Notification:

No Reply Requested:

Yes Sensitivity:

Normal Expiration Date:

Recipients Received: