~SAFEGUARDS lNFORMATlON t'}r70 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555"()001 September 21, 2012 Vice President, Operations Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 SUB..IECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - RE: 10 CFR 50.54(p)(2)

CHANGES TO SECURITY PLANS

Dear Sir or Madam:

On May 15, 2012, Entergy Nuclear Operations, Inc. (Entergy), submitted revision 11, of James A. Fitzpatrick Nuclear Generating Plant, Unit 1 Physical Security Plan(s).

The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). These questions are designated as safeguards information and must be handled in accordance with Title 10 of the Code of Federal Regulations Sections 73.21 and 73.22.

Please contact me at (301) 415-1476 if you have any questions on this issue.

Sincerely, Mohan C. Thadani, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation I Document transmitted herewith contains SGI.

I, When separated from enclosures(s), this

. document is decontrolled.

Docket No. 50-333

Enclosure:

Request for Additional Information (SGI) cc: Distribution via Listserv (w/o enclosure)

SArCGUARSS INFORMATIO~ /f71C)

I

SAFEGUARDS INFORMATION Y1?()

September 21, 2012 Vice President, Operations Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - RE: 10 CFR 50.54(p)(2)

CHANGES TO SECURITY PLANS

Dear Sir or Madam:

On May 15, 2012, Entergy Nuclear Operations, Inc. (Entergy), submitted revision 11, of James A. Fitzpatrick Nuclear Generating Plant, Unit 1 Physical Security Plan(s).

The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). These questions are designated as safeguards information and must be handled in accordance with Title 10 of the Code of Federal Regulations Sections 73.21 and 73.22.

Please contact me at (301) 415-1476 if you have any questions on this issue.

Sincerely,

~han C. Thadani, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Document transmitted herewith contains SGI.

IWhen separated from enclosures(s), this i document is decontrolled.

Docket No. 50-333

Enclosure:

Request for Additional Information (SGI) cc: Distribution via Listserv (w/o enclosure)

DISTRIBUTION: (w/o enclosure)

PUBLIC RidsNrrDorlLpl1-1 RidsNrrPMlndianPoint LPL1-1 Reading File RidsNrrLAKGoldstein RidsAcrsAcnw_MailCTR RidsNrrDorlDpr RidsRgn1 MailCenter Tech Staff RidsOgcRp ADAMS Accession N0.: ML12256A009

  • See prevIous concurrence

! OFFICE LPL 1-1/P~,.,r9 LPL 1-1/LA NSIR/RSLB/BC LPL1-1/BC NAME MThadaffi'

  • KGoldstein RFelts*

GWilson &r-I I DATE 09/12/12 09/12/12 09/12/12 crtell {It OFICIAL RECORD COpy SAFEGUARDS INFORMATION* /111 CJ