Response to NRC Request for Information Regarding Denial of Request for Withholding Information
ML12251A016
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/17/2012
From: John Hughey
Plant Licensing Branch 1
To: Head J
GE-Hitachi Nuclear Energy Americas
Hughey J
References
TAC ME2360, TAC ME2369, TAC ME2370, TAC ME2371
Download: ML12251A016 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 17,2012 Mr. Jerald G. Head Senior Vice President GE Hitachi Nuclear Energy Regulatory Affairs P.O. Box 780 3901 Castle Hayne Road MCA18 Wilmington, NC 28402

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NO.3.

(TAC NOS. ME2360, ME2369, ME2370 AND ME2371)

Dear Mr. Head:

In response to an NRC request for information regarding a Denial of Request for Withholding Information, GE Hitachi Nuclear Energy (GEH) submitted a letter to the Nuclear Regulatory Commission (NRC) dated March 23, 2010, and affidavit dated March 23,2010, executed by Mr.

James F. Harrison. GEH requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:, MFN 10-124, Information Regarding Treatment of Fuel Parameters, GEH Proprietary Information, March 23, 2010.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(4)c Information that reveals aspects of past, present, or future GEH customer-funded development plans and programs, that may include potential products of GEH.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our conSUltants working in this area. We will, of course, ensure that the conSUltants have signed the appropriate agreements for handling proprietary information.

J. Head

- 2 If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-3204.

S~D#

John D. Hughey, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-278 cc: Mr. James F. Harrison Vice President, Fuel Licensing, Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28402 Mr. Michael Jesse Director - Licensing and Regulatory Affairs Exelon Generation Company LLC Correspondence Control PO Box 160 Kennett Square, PA 19348 Additional Distribution via ListServ

J. Head

- 2 If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-3204.

Sincerely,

/rat John D. Hughey, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-278 cc: Mr. James F. Harrison Vice President, Fuel Licensing, Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28402 Mr. Michael Jesse Director - Licensing and Regulatory Affairs Exelon Generation Company LLC Correspondence Control PO Box 160 Kennett Square, PA 19348 Additional Distribution via ListServ DISTRIBUTION:

PUBLIC RidsOgcMailCenter Resource LPL 1-2 R/F RidsAcrsAcnw _MailCTR Resource RidsNrrDorlLpl1-2 Resource RidsRgn1MailCenter Resource RidsNrrLAABaxter Resource RidsNrrPMPeachBottom Resource ADAMS Accession Number: ML12251A016

  • Via email rOFFICE I LPL 1-2/PM I LPL1-2/LA LPL1-2/BC II NAME~_l_~~~~hey ~_ I_ABaxter *

. f\\i1KhannaJ

.DA"IE I 09/14/2012

~l 09/13/2012 09/17/2012 1\\