ML12242A468

From kanterella
Jump to navigation Jump to search
2012 Donald C. Cook Nuclear Power Plant Initial License Examination Administrative
ML12242A468
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/15/2012
From: Moore C
Operations Branch III
To:
Indiana Michigan Power Co
References
Download: ML12242A468 (24)


Text

ES-401 Record of Rejected K/As Form ES-401-4 Tier Randomly Reason For Rejection

/Group Selected K/A 1/1 000009 EA2.31 Replace with 000009 EA2.24. Replaced since TS idle loop operation is not allowed and is not tied to Small break LOCA analysis at this plant.

1/1 000040 2.2.12 Replace with 000040 2.1.7. Replaced since it is difficult to tie knowledge of surveillance procedures to a Steam Line Rupture.

1/1 000056 AA1.16 Replace with 000056 AA1.07. Unable to write a question of sufficient difficulty

& psychometric attributes addressing LOOP and switchgear fans.

1/2 000059 2.4.34 Replace with 2.4.31. Unable to write a question of sufficient difficulty &

psychometric attributes addressing Accidental Liquid Release tasks performed by the RO outside of the control room.

1/2 000076 2.2.25 Replace with 2.1.30. Replaced since the TS bases associated with High Activity is SRO level knowledge.

1/2 00WE15 EK3.3 Replace with 00WE15 EK3.2. Replaced since the Containment Flooding procedure contains no manipulation of controls.

2/1 006000 2.4.34 Replace with 006000 2.1.27. Unable to write a question of sufficient difficulty &

psychometric attributes addressing ECCS tasks performed by the RO outside of the control room. Even during control room evacuations the RO primarily monitors and directs actions associated with non-ECCS systems. Note: Replaced the Generic portion (2.4.34) with a randomly selected KA from the Generic section that required a System tie. (2.1.7) 2/1 010000 K2.04 Replace with 010000 K2.01. Replaced with knowledge of the pressurizer heater power supplies since there are no PZR safety valve position indicators.

2/1 012000 K4.07 Replace with 012000 K4.05. Replaced since a first out indication panel/system does not exist at this plant.

2/1 026000 K3.01 Replace with 026000 K3.02. Replaced since CSS failure would not impact Containment Cooling System (CCS also not a backup with Ice Condenser).

2/2 071000 A4.03 Replace with 071000 A4.10. Replaced with a different ability since there is no means to monitor Waste Gas Compressor valves or seal water in the control room.

3 2.1.27 Replace with 2.1.36. Moved 2.1.27 to tie with ECCS since the KA requires a purpose/function of a system. Also new KA added Core Alteration to RO exam.

2/1* 004000 2.4.21 Replace with 004000 2.2.22. Replaced since CVCS does not directly input to the parameters and logic associated with assessment of safety functions.

Revision 0 * = SRO Only

ES-401 Written Examination Review Worksheet Form ES-401-9 DC COOK 2012 PROPOSED INITIAL EXAM REVIEW

3. Psychometric Flaws 4. Job Content Flaws 5. Other
1. 2. 6. 7. 8.

LOK LOD Q# Stem Cred. Job- #/ Back- Q= SRO (F/H) (1-5) Cues T/F Partial Minutia B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Distractor C is not plausible because everyone should know that boron concentration decreases over core life. I suggest that you change distractor C to read more negative (worth more) due to E increased neutron leakage.

1* F 2 x Y N S Resolution: Distractor C was changed to more negative (worth more) due to increased neutron leakage. This question is satisfactory.

Distractor C is not plausible. With an increase is RCS pressure anybody with a causal knowledge of pumping systems would pick distractor C. Distractor C should be changed to Charging pump discharge header pressure remains the same and total seal injection E flow lowers 2* H 2 x Y B S Resolution: Distractor C was changed to Charging pump discharge header pressure remains the same and total seal injection flow lowers. This question is satisfactory.

How many minutes do you have to trip RCPs if loss all seal cooling.

If it is not 5 minutes the distractors need to be changed to whatever the time limit is. Its 2 minutes for the bearing oil coolers. Why arent you using 2 minutes in the distractors???

3* H 2 Y N S Resolution: Changed time frame from 5 minutes to 2 minutes since bearing oil cooler time limit is 2 minutes. This question is satisfactory.

No correct answer. Will the suction of the CV pumps be lost when VCT level reaches 0%??? There should still be enough static head in the piping to provide suction pressure. It wont be lost at 0% VCT U level. Therefore no correct answer??? Need to delete last sentence 4 H 2 Y N from distractors A and C.

S Resolution: Removed last sentence from all distractors. The question now contains only one correct answer and is satisfactory.

5 F 2 Y B S 1

ES-401 Written Examination Review Worksheet Form ES-401-9

3. Psychometric Flaws 4. Job Content Flaws 5. Other
1. 2. 6. 7. 8.

LOK LOD Q# Stem Cred. Job- #/ Back- Q= SRO (F/H) (1-5) Cues T/F Partial Minutia B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only I dont like distractor B and C. Can we make them correlate to the actual fuel clad melting point. Distractor C could read Clad temperature at 2200F correlates to a fuel centerline temperature E 300F below the fuel melting point. Not sure what the clad melt 6 F 2 x Y B temp is.

S Resolution: Distractors B & C were changed to 500F below the fuel cladding melting point. This question is satisfactory.

LOD=1 Straight forward power supply question. Need to replace question. Question is What is power supply for the North SI pump.

F 1 U Resolution: Question was replaced with a new question 7 Y N H 3 S requiring more knowledge than just what is the power supply to north SI pump. This question is satisfactory.

Does the stem contain enough information to answer the question??? May just need to change the level in the distractor A to a level in normal band??? Add reduce level to distractor C.

E 8* H 2 x Y B Resolution: Added 30 seconds later. to the stem and S changed distractor A from 15% to 75%. This question is satisfactory.

9* F 2 Y B S LOD=1 Straight forward power supply question. Need to replace question. Question is What is power supply for the Pzr Htrs.

Possible enhancement would be how are the Pzr Htrs powered F 1 U during a LOOP with the 2CD DG unavailable?

10* Y B H 3 S Resolution: Question was replaced with a new question requiring more knowledge that just what is the power supply to the Pzr Htrs. This question is satisfactory.

2

ES-401 Written Examination Review Worksheet Form ES-401-9

3. Psychometric Flaws 4. Job Content Flaws 5. Other
1. 2. 6. 7. 8.

LOK LOD Q# Stem Cred. Job- #/ Back- Q= SRO (F/H) (1-5) Cues T/F Partial Minutia B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Would prefer to change distractors slightly to enhance distractors.

When was 62 psig changed to 800psig??? If it was this cycle or last we can keep it. I would prefer 600psig in distractors A & C. I would also change distractor A from OR to AND as well as distractor C E from AND to OR. I would also change the 1/3 in distractors A & B to 11 F 2 x Y B S 2/3.

Resolution: Distractors A, B, & C pressures and logic were changed to enhance question. This question is satisfactory.

LOD=1 Need to replace the question F 1 U Resolution: Replaced question with a bank question from 2008 12 Y B H 3 S NRC Exam. This question is satisfactory.

Why are distractors A & B plausible??? Is SG-12 and NR-43 powered by CRID III on U-1??? Why not ask what effect does this failure have on both the units??? Asking about only U-1 is slightly leading. This is a better way to ask what is the power supply to 13 H 2 Y B S Resolution: Distractors A & B are plausible based on SG-12 and NR-43 power supplies. This question is satisfactory.

A better distractor for A would be stop all RCPs to minimize heat input into cnmt. Or the second part of distractor C could be added to distractor A. stop all RCPs. A cnmt pressure relief is performed to minimize the risk of SI actuation since cnmt cooling has been lost. Why is distractor D plausible??? When would you perform a cnmt pressure relief to allow cnmt purge??? A better distractor E would be stop three RCPs. A cnmt pressure relief is performed 14 F 3 x Y B since ice condenser cooling has been lost.

S Resolution: Distractors A & D were changed to enhance their plausibility. A was changed to stop all RCPs to minimize heat input into cnmt and D was changed to Operate cnmt purge as required to maintain the ice condenser doors closed. This question is satisfactory.

15* F 2 Y N S 3

ES-401 Written Examination Review Worksheet Form ES-401-9

3. Psychometric Flaws 4. Job Content Flaws 5. Other
1. 2. 6. 7. 8.

LOK LOD Q# Stem Cred. Job- #/ Back- Q= SRO (F/H) (1-5) Cues T/F Partial Minutia B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 16* H 3 Y B S 17*

F 3 Y B S LOD=1 This is a Whats the power supply for Hydrogen Recombiner question. Might be acceptable if there are actions that must be performed to cross-tie power or realign power to these buses because it shows they know the bus that powers the equipment and what alignment is needed to energize the correct bus. The question E shouldnt contain (Train A) and (Train B) in the distractors.

18 H 2 Y B S Resolution: Question is more complicated than initially thought and is not a LOD=1 question. H2 Recombiner power supplies are opposite of respective safety buses. That is, recombiner 1 is fed from B-train power and recombiner 2 is fed from A-train power. (Train A) and (Train B) were removed. This question is satisfactory.

19 H 3 Y M S 20 F 3 Y B S Change distractor A to include start of exhaust fans.

Is distractor D plausible with HV-ACRDA-2, 2A Open. Does this outside air intake damper open on a high rad signal???

E 21 F 3 x Y B Resolution: Changed distractor A to add start exhaust fans and S

changed distractor D to HV-ACRDA-2, 2A - Part. Open. This question is satisfactory.

Change distractor A to 450 psig and distractor C to 2.5 psig.

E Resolution: Distractor A changed to 450 psig and distractor C 22* H 3 Y B cnmt pressure was changed to 2.5 psig. This question is S satisfactory.

23* H 3 Y B S 24* H 3 Y M S 25 H 3 Y B S 4

ES-401 Written Examination Review Worksheet Form ES-401-9

3. Psychometric Flaws 4. Job Content Flaws 5. Other
1. 2. 6. 7. 8.

LOK LOD Q# Stem Cred. Job- #/ Back- Q= SRO (F/H) (1-5) Cues T/F Partial Minutia B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Change distractors A & B to 20%. These sources make more sense before the 15% level when ESW is required. Use preferred sources first then less desirable sources. Need to check OHP-4022 -055-E 003 and make sure 20% isnt a correct answer.

26 H 2 x Y B S Resolution: Changed distractors A & B to 20% to enhance question. This question is satisfactory.

Distractor D is not plausible because all breakers can be tripped locally..

E Resolution: Distractor D was changed to A load shed signal 27 F 2 x Y B S will cause breaker 1A7 to trip open. This question is satisfactory.

28 H 3 Y B S 29 F 2 Y B S Distractor C needs to be changed to during the GDT tank transfer; E Resolution: Distractor C was changed to during the GDT tank 30 H 3 Y B S transfer;. This question is satisfactory.

Change distractor D to Verify VCR-107 auto closes Manually close VCR-207 Verify HV-CPR-1 auto tripped E Resolution: Changed distractor D to read 31* H 3 Y M S Verify VCR-107 and automatically closed.

Manually close VCR-207.

Verify HV-CPR-1 has automatically tripped.

This question is satisfactory.

5

ES-401 Written Examination Review Worksheet Form ES-401-9

3. Psychometric Flaws 4. Job Content Flaws 5. Other
1. 2. 6. 7. 8.

LOK LOD Q# Stem Cred. Job- #/ Back- Q= SRO (F/H) (1-5) Cues T/F Partial Minutia B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Are distractors C & D correct responses to other rad monitors???

Resolution: Distractors C & D are responses to other rad 32* H 3 Y B S monitors (ERS-2409) and are thus plausible. This question is satisfactory.

Would distractor D be better using 5000 as the limit since this is an actual dose limit???

Resolution: Distractor D was changed to correspond to a dose E limit of 5000mR. This question is satisfactory.

33* H 2 Y B S

34 H 2 Y B S 35 F 2 Y M S Why are distractors A & B plausible??? A says to align U-1 BA makeup to feed U-2 through cross-tie but BA pumps wouldnt be able to inject through cross-tie due to charging pump discharge pressure. Same with distractor B and why would you use U-2 BA makeup to feed U-2 through the cross-tie???

Why isnt CC flow to the RCP thermal barrier Hx checked prior to U isolating seal injection flow in 2-OHP-4025-LS-6???

36 H 2 x Y B S Resolution: Changed distractor A to use the U-1 CCP to x-tie to U-2. Distractor B was changed eliminate any reference to use of the x-tie. This question is satisfactory.

6

ES-401 Written Examination Review Worksheet Form ES-401-9

3. Psychometric Flaws 4. Job Content Flaws 5. Other
1. 2. 6. 7. 8.

LOK LOD Q# Stem Cred. Job- #/ Back- Q= SRO (F/H) (1-5) Cues T/F Partial Minutia B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Provided the reference material this is a direct lookup. Without the reference material it is an SRO question. Doesnt match K/A, it has EOP enter conditions but no immediate action steps associated with U FR-Z.1.

37 H 3 Y B S Resolution: Removed attachment that was previously provided. The question is no longer a direct look up. This question is satisfactory.

Distractor D is implausible (-1.55psig). Why would pressure be this low as a result of a loss in CHW flow???

E Resolution: Distractor D was changed from -1.55psig to -

38 F 2 x Y B S 0.05psig and upper cnmt temp was changed from 97F to 115F to enhance the distractor. This question is satisfactory.

39 H 3 Y N S Change distractor C the read Restore seal cooling asap to minimize the potential for seal degradation. Do not start the RCP until seal leakoff temperatures as less than 200F. This will make the distractor more plausible.

E 40* H 2 x Y N Resolution: Distractor C was changed to read Restore seal S cooling asap to minimize the potential for seal degradation. Do not start the RCP until seal leakoff temperatures as less than 200F. This question is satisfactory.

Distractors C & D are not plausible. How will any injection flow remove a hard bubble??? And how will injection flow affect SG tubes during a LBLOCA???

U Resolution: Distractor C was changed to To equalize thermal 41* F 2 x Y N S stresses on the loop injection penetrations. And Distractor D was changed to To minimize hydrogen generation. This question is satisfactory.

7

ES-401 Written Examination Review Worksheet Form ES-401-9

3. Psychometric Flaws 4. Job Content Flaws 5. Other
1. 2. 6. 7. 8.

LOK LOD Q# Stem Cred. Job- #/ Back- Q= SRO (F/H) (1-5) Cues T/F Partial Minutia B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Change distractor C & D. C should be changed to trip Rx because CC is lost to all ESF loads. And D should be changed to trip the Rx because all seal cooling is lost.

E 42* H 2 x Y B Resolution: Distractor C was changed to Component Cooling S flow is lost to all the ESF loads. And distractor D was changed to all RCP seal injection is lost.

43 H 2 Y N S 44 H 2 Y B S 45 H 3 Y B S 46 H 2 Y B S Does the cnmt purge system isolate automatically on high rad signal??? If it does then there may not be a correct answer. If a cnmt high rad isolates cnmt there is no guarantee it wont occur before the procedure step is performed.

E 47 H 2 Y M Resolution: Added a bullet to the stem that says Two minutes S later, all radiation monitors show a stable trend with no additional alarms actuated. This enhancement ensures that only one correct answer exists. This question is satisfactory.

Distractor A needs to be changed to 514 PSIG.

E Resolution: Distractor A was changed to 514psig because it is 48 H 2 Y N the most likely error that an applicant would make. This S question is satisfactory.

Distractors B, C, & D are not plausible. The stem states cnmt pressure is high but none of these distractors would result in high cnmt pressure. Question doesnt discriminate.

U 49* H 3 x x Y B S Resolution: Replaced question. This question is satisfactory.

8

ES-401 Written Examination Review Worksheet Form ES-401-9

3. Psychometric Flaws 4. Job Content Flaws 5. Other
1. 2. 6. 7. 8.

LOK LOD Q# Stem Cred. Job- #/ Back- Q= SRO (F/H) (1-5) Cues T/F Partial Minutia B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only When are the ESW unit cross-tie valves closed??? If this is the normal alignment than state that the system is normally aligned in the stem dont cue them.

Resolution: The ESW system can be aligned several different 50* H 3 Y B S ways, so the stem must state a configuration or the applicants would have to ask which configuration the system is in or make an assumption about its configuration. This question is satisfactory.

51* H 2 Y B S What is the normal power supply??? The DC input??? Supporting documentation doesnt state that DC input Bkr must be manually closed before auto re-transfer occurs. Please show me how inverter is feed electrically.

52 H 3 Y N S Resolution: DC is the normal power supply and station provided necessary info when asked about inverter feeds. This question is satisfactory.

53 F 3 Y B S No completely correct answer. Outside air dampers also close and inlet dampers open. Should change distractors to incorporate the changes in damper position also.

Resolution: Bolded pressurization fan alignment. The 54 F 3 Y B S question has only one correct answer because question is only asking about pressurization fans and not what happens on a Hi Rad signal. This question is satisfactory.

It seems like the way the question is asked only one distractor (A) is plausible. Why would anybody pick anything other than A??? Its the only logical choice. Need to explain why B, C, & D distractors are plausible.

55 F 2 Y B E Resolution: Changed stem to specify U-1 and first action.

Eliminated U-2 actions in stem. This question is satisfactory.

9

ES-401 Written Examination Review Worksheet Form ES-401-9

3. Psychometric Flaws 4. Job Content Flaws 5. Other
1. 2. 6. 7. 8.

LOK LOD Q# Stem Cred. Job- #/ Back- Q= SRO (F/H) (1-5) Cues T/F Partial Minutia B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Based on distractors B & D Pzr is on loop #3??? If it isnt, need to change distractors so you are steaming loops without the Pzr.

Resolution: Changed distractor B from 1 & 2 to 1 & 4 so 56 H 3 Y B S that the loops without the Pzr were being steamed. This question is satisfactory.

57 F 2 Y B S No correct answer. Does DC Cooks agreement with your grid operator (MISO) allow you to operate with negative MVARS???

Question is Sat if it has a correct answer.

58* H 3 Y N S Resolution: Operations personnel informed me that DC Cook plant is allowed to operate with negative MVARs. This question is satisfactory.

59* H 3 Y B S 60* H 3 Y B S Change question so that RCS Temp is 425F which equates to approx 330 psig thus making the correct answer aligning BIT flow from other unit.

E Resolution: Based on explanation of FR-C.2 entry criteria and 61 H 2 Y B S system operation the question was changed to increase RCS temp in stem and add a FR-C.2 reference for distractor B. This question is satisfactory.

62 H 2 Y B S Distractor C needs to be changed its not plausible. Cooling down doesnt ensure adequate shutdown margin and will not discriminate.

E Resolution: Changed distractor C to allow a faster 63 F 3 Y N S depressurization, limiting delta P across the SG tubes. Which is a more plausible distractor. This question is satisfactory.

64 F 3 Y B S 10

ES-401 Written Examination Review Worksheet Form ES-401-9

3. Psychometric Flaws 4. Job Content Flaws 5. Other
1. 2. 6. 7. 8.

LOK LOD Q# Stem Cred. Job- #/ Back- Q= SRO (F/H) (1-5) Cues T/F Partial Minutia B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Distractor D needs to be changed. RHR is used for normal RCS cooldowns and operators with suction pressures normally 300 psig therefore not plausible. Change D to The added inventory will reduce post accident boron concentrations leading to shutdown E margin concerns.

65 F 2 Y B S Resolution: Distractor D changed to added inventory will reduce post accident boron concentrations leading to shutdown margin concerns. This question is satisfactory.

66 F 2 Y B S Why is an attachment provided? Does it make question a direct lookup???

E Resolution: Attachment will NOT be provided. Distractor B was 67* H 2 Y B S changed to 4 qualified operators. This question is satisfactory.

Add suspend core alterations to distractor D.

E Resolution: Added suspend core alterations to stem which 68* F 3 Y B S incorporated it into distractor D. This question is satisfactory.

69* H 3 Y B S Change distractor B from equipment hatch NOT sealed. To something else, this makes question low LOD. Change to that six bolts were found hand tight.

1 U 70 F Y B Resolution: Changed distractor B to While in Mode 3, the 2 S outer airlock door interlock is discovered to be non-functional.

This question is satisfactory.

71 F 2 Y B S 72 F 2 Y B S 11

ES-401 Written Examination Review Worksheet Form ES-401-9

3. Psychometric Flaws 4. Job Content Flaws 5. Other
1. 2. 6. 7. 8.

LOK LOD Q# Stem Cred. Job- #/ Back- Q= SRO (F/H) (1-5) Cues T/F Partial Minutia B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Change distractor B by removing statement that natural circ is more effective when considering 2 phase flow. Distractor B is not plausible.

E 73 F 2 x Y B Resolution: Changed distractor B from when considering to S than so that the distractor reads more fluently. This question is satisfactory.

74 F 2 Y N S 75 H 3 Y B S Add a RCS temperature to stem 608F and rising. Add and rising.

To RCS pressure statement in stem. This will make distractors B &

C more plausible.

E Resolution: Added the second open bullet to stem RCS temp 1(76)* H 3 x Y Y N S is 608F and rising and added and stable to the third open bullet. These changes enhanced the question. This question is satisfactory.

Change the attachments that are provided. I think that sections 3.0, 3.4, 3.5, 3.7, & 3.8 should be provided otherwise we are cueing them the correct answer.

2(77)* H 3 Y Y B S Resolution: Only Tech Spec sections 3.0, 3.5.2, and 3.8.1 will be provided. This will not provide any unnecessary cueing.

This question is satisfactory.

3(78)* H 3 Y Y N S 12

ES-401 Written Examination Review Worksheet Form ES-401-9

3. Psychometric Flaws 4. Job Content Flaws 5. Other
1. 2. 6. 7. 8.

LOK LOD Q# Stem Cred. Job- #/ Back- Q= SRO (F/H) (1-5) Cues T/F Partial Minutia B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Does the stem of this question provide information that an applicant could use to answer Q#45??? This stem describes how the Pzr pressure control system works and Q#45 asks how it works.

Resolution: This question does NOT provide any info that 4(79) H 2 Y Y B S could be used on question #45. Changed stem from lowers demand to returns demand to normal to provide better clarification of settings. This question is satisfactory.

Delete (failed high) provides an unnecessary cue. Change distractor A to delete will indicate correctly. and change it to and P-13 E and P-7 will be in the correct state.

5(80) H 3 Y Y B S Resolution: Deleted (failed high) from stem and changed distractor A to P-13 and P-7 will be in the correct state.

Change distractor B to OPERABLE. Immediately Restore 1 channel or be in Mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

E Resolution: Changed distractor B to OPERABLE. Immediately 6(81) H 2 Y Y N Restore one train of Quadrant 1 CETs or be in Mode 3 within 6 S hours and Mode 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. This question is satisfactory.

Add within 30 minutes. to distractor C E Resolution: Added within 30 minutes. to distractor C. This 7(82) H 3 Y Y B S question is satisfactory.

Distractor D is not plausible with water spilling from 10 line going to U-1 Main Turbine Lube Oil Coolers. Is there a way to ask this without providing a reference. Almost a direct lookup except for knowing setpoint of P-8. Can we ask this in a bigger picture kind of E way where we dont need to provide the procedure???

8(83) H 2 Y Y B S Resolution: Changed stem to state that The South NESW is in standby. Changed distractor D from U-2 actions to Flooding actions. This question is satisfactory.

13

ES-401 Written Examination Review Worksheet Form ES-401-9

3. Psychometric Flaws 4. Job Content Flaws 5. Other
1. 2. 6. 7. 8.

LOK LOD Q# Stem Cred. Job- #/ Back- Q= SRO (F/H) (1-5) Cues T/F Partial Minutia B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Change pressurizer pressure in the stem to 1875 psig and stable.

E Resolution: Changed Pzr pressure in stem from 2150 and 9(84) H 2 Y Y B S lowering to 1920 and stable. This question is satisfactory.

10(85)* H 3 Y Y M S 11(86)* H 3 Y Y M S Why is a reference provided??? Can this question be asked so no reference is required??? Looks like a direct lookup once you get to the fold-out page. If entire procedure is providedsee question below.

Explain why this question doesnt provide information that helps on Q#76 12(87)* H 3 Y Y B S Resolution: The first 4 pages of FR-H.1 are not given so this question does not provide info that will help on Q#76. It has been determined that this question is not a direct lookup.

Question is satisfactory as written. This question is satisfactory.

13(88) F 2 Y Y B S Do you also have to restore within 14 days??? Is D a completely correct answer??? What is TRM 8.7.8??? Are we going to provide just these figures or are we going to provide them all??? Should E provide TRM 8.7.5 and any other fire protection TRMs.

14(89) H 2 Y Y N S Resolution: Changed distractor D changed to make it a more complete answer. This question is satisfactory.

Can we change FR-C.2 to whichever procedure contains the steps for SI re-initiation.

15(90) H 3 Y Y B S Resolution: Based on core cooling status tree FR-C.2 is a plausible procedure. This question is satisfactory.

16(91) H 2 Y Y B S 14

ES-401 Written Examination Review Worksheet Form ES-401-9

3. Psychometric Flaws 4. Job Content Flaws 5. Other
1. 2. 6. 7. 8.

LOK LOD Q# Stem Cred. Job- #/ Back- Q= SRO (F/H) (1-5) Cues T/F Partial Minutia B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Are there any other cooldown limits in the EOPs??? I am concerned that with only a normal cooldown rate and an EOP rate why would anybody pick a normal cooldown rate while in FR-C.2???

17(92) H 2 Y Y B S Resolution: Changed cooldown rate in distractors A & B to 200F/Hr. This question is satisfactory.

18(93) F 2 Y Y B S 19(94)* F 2 Y Y B S Need to change the way this question is being asked.

E Changed question stem and distractor C to eliminate confusion 20(95)* H 3 Y Y B and make question more straightforward. This question is S satisfactory.

Why are you providing the reference material??? I dont think it is necessary to answer the question if the applicant knows how to use the TS. All SROs should know the requirements for a missed surv.

Resolution: Reference material is necessary to answer 21(96)* H 3 Y Y B S question and will be provided. The question is more complicated than initially thought. This question is satisfactory.

Change distractor B Plant Manager notification. To Plant Manager authorization was obtained simply notifying the Plant E Manager doesnt seem plausible.

22(97) H 3 X Y Y B S Resolution: Changed distractor B from notification to approval. This question is satisfactory.

Distractor A is not plausible and needs to be changed.

E Resolution: Distractor A was changed to Initiate Cnmt 23(98) F 2 X Y Y N Ventilation and Phase A Isolation. This question is S satisfactory.

15

ES-401 Written Examination Review Worksheet Form ES-401-9

3. Psychometric Flaws 4. Job Content Flaws 5. Other
1. 2. 6. 7. 8.

LOK LOD Q# Stem Cred. Job- #/ Back- Q= SRO (F/H) (1-5) Cues T/F Partial Minutia B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Does this question provide information that could be used to answer Q#42???

24(99) F 2 Y Y B S This question does NOT provide any info that could be used on question #42. This question is satisfactory.

25(100) H 2 Y Y B S Instructions

[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]

1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
2. Enter the level of difficulty (LOD) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).
3. Check the appropriate box if a psychometric flaw is identified:
  • The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
  • The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
  • The answer choices are a collection of unrelated true/false statements.
  • The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.
  • One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
4. Check the appropriate box if a job content error is identified:
  • The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).
  • The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).
  • The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
  • The question requires reverse logic or application compared to the job requirements.
5. Check questions that are sampled for conformance with the approved K/A and those that are designated SRO-only (K/A and license level mismatches are unacceptable).
6. Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f.
7. Based on the reviewers judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
8. At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).
  • Designates the questions reviewed to meet requirement of ES-401.E.2.c. (100% of questions were reviewed by Chief Examiner) 16

ES-401 Written Examination Review Worksheet Form ES-401-9 RO Bank 56 / 75 = 74.7% SRO Bank 18 / 25 = 72%

RO Modified 5 / 75 = 6.7% SRO Modified 2 / 25 = 8%

RO New 14 / 75 = 18.7% SRO New 5 / 25 = 20%

RO Memory 30 / 75 = 40% SRO Memory 5 / 25 = 20%

RO C/A 45 / 75 = 60% SRO C/A 20 / 25 = 80%

Unsat 9 / 100= 9%

Enhancement 37 / 100= 37%

Satisfactory 54 / 100= 54%

17

No NRC Comments or Resolutions on Licensee Outline

NRC Exam Submittal Comments for DC Cook 2012 Initial Exam Examiner Comment Facility Action/Response Operating Test JPM A1a-RO 1. Why is the data just provided at the start of the This JPM will be performed in a classroom setting so JPM??? This JPM is to be done in classroom??? data needs to be provided.

JPM A1a-SRO 1. The N41 value in step 4.4.1 should also be Steps 4.4.1 and 4.5 were changed to 100.1.

changed to 100.1.

2. The 100.1 error should be carried through the calculation. Step 4.5 should contain 100.1 not 101.1.

JPM A1b 1. No Comments JPM A2-RO 1. Page 5, I see 3 pages of Open Items not 2 and I 1) Page 5 was changed to reference 3 pages of dont see the 3 data sheets. Open Items.

2. Page 6, why isnt telling the US/SM that they 2) Page 8 was changed to indicate that informing have to enter the LCO for LTOP not a critical the US/SM that the LTOP LCO is not met is a step??? critical step.

JPM A3 1. Will performing this JPM provide answers to Performing this JPM will not provide answers to the written questions regarding Cnmt Vents??? written questions regarding CNMT Vents.

JPM A4-SRO 1. The task briefing pretty much tells the Tasking briefing sheet was changed to specify that the applicants that they will need to fill out the applicant is suppose to determine if a notification is NRC Notification form. It should be worded to required and if it is prepare one.

determine if notification is required and if it is fill out the form.

JPM Sim01 1. No Comments JPM Sim02 1. No Comments This JPM was reviewed and meets the minimum requirements for JPM difficulty.

JPM Sim03 1. No Comments JPM Sim04 1. Acceptance criteria on determining recombiner Acceptance criteria was changed to 46-47KW power needs to be tighter. 45.5-46.5 looks like it would be acceptable not 45-48 to wide a band.

JPM Sim05 1. No Comments JPM Sim06 1. Does this JPM assist applicants with one of the Performing this JPM will not provide answers to the 1 of 5

NRC Exam Submittal Comments for DC Cook 2012 Initial Exam Examiner Comment Facility Action/Response written questions on MCR vents??? written questions regarding MCR Vents.

JPM Sim07 1. Doesnt this JPM assist applicants with one of Performing this JPM will not provide answers to the the written question on IA system response??? written question regarding the IA system.

JPM Sim08 1. No Comments JPM INP01 1. No Comments JPM INP02 1. No Comments JPM INP03 1. No Comments 2 of 5

NRC Exam Submittal Comments for DC Cook 2012 Initial Exam Examiner Comment Facility Action/Response Scenarios Scenario 1 a) Please add the TS and TRM actions to the Applicants Actions a) TRM action added and Behavior sections of the scenarios. page 5 b) Is the applicant suppose to enter TRM 8.1.1 or Refer to it. b) Plant procedures state refer to TS Change Refers to to Enters. Page 5 so that is why it is listed like this in the scenario. If TS is not applicable c) Same comment as b) for TS 3.4.9.b on page 6 it will be stated as such.

c) See comment above d) For SG PORV failure differentiate which TS and which TRM d) See comment above TS 3.4.7 is N/A are entered. It seems like TS 3.4.7 is referred to while TRM 8.3.8 is entered.

e) During major event there isnt a step for the SRO to ensure the e) Added step to announce RX Trip STAs & SM presence in the control room is established and over Executone that status trees are being monitored and an EAL call is going to be made. Why isnt there a step to ensure this happens??? Need to add a step for the SRO. Page 9 f) What is no load Tavg??? Is it 547F??? If it is the entry on the f) No load Tavg is 547F and sim shows bottom of page 10 needs to be changed because RCS temp RCS temp trending to 547F.

should be going to the temp associated with SG PORV lift setpoint which is usually above no load Tavg.

Scenario 2 a) Page 4 what does BOP have to manipulate on stator cooling a) Changed BOP entry to Monitors h2o and generator H2 system??? Just say monitor secondary main electrical generator temps equipment during ramp. There is nothing that the BOP has to b) Plant procedures state refer to TS manually perform to do these things is there??? so that is why it is listed like this in b) Page 5 only put the LCO and action statements that must be the scenario. If TS is not applicable entered no need to put the ones referred to. it will be stated as such.

c) Page 6 TS LCO is giving please add action statement. Restore c) Action statement added 3 of 5

NRC Exam Submittal Comments for DC Cook 2012 Initial Exam Examiner Comment Facility Action/Response within 7 days for this one.

d) Page 7 same comments as b & c above provide LCO that needs d) Action statement added to be entered and the action statements that must be met.

e) Page 8 same comments as 2 & 3 above provide LCO that needs e) Action statement added to be entered and the action statements that must be met.

f) Page 13 Why isnt adding makeup h2o to the RWST a critical f) At DC Cook this is not a critical task task??? This action has a pretty big PRA contribution.

g) How should makeup to the RWST be performed, at > 2000ppm g) This action is performed outside of boron or > 2400 ppm??? Does it make a difference??? the MCR so comment is not N/A.

Scenario 3 a) Page 5 only put the LCO and action statements that must be a) Plant procedures state refer to TS entered no need to put the ones referred to. so that is why it is listed like this in b) Page 6 only put the LCO and action statements that must be the scenario. If TS is not applicable it entered no need to put the ones referred to. will be stated as such.

c) Event 3 - Change MFC 130 to 131 since 131 is the controlling b) See comment above channel. c) Changed to MFC-131 d) Page 7 only put the TLCO and action statements that must be d) See comment above entered no need to put the ones referred to.

e) Page 8 is there a set amount of BA that will be added for a main e) BA table added to scenario feed water pump trip??? Is this the amount of BA that is supposed to be added??? If this amount is defined put it in the boration step. Normal or Emergency. Is there a REMA which covers this.

f) Page 12 Is the crew supposed to wait to E-2 to isolate AFW f) DC Cook isolates AFW per E-2 and flow to the faulted SG??? Or are they allowed to isolate it not before.

earlier??? If allowed earlier put step where it is expected.

Scenario 4 a) Page 4 Event 2 - Change N-42 failure to HIGH failure (from a) Changed to fail HIGH low) - more impact/actions. b) Plant procedures state refer to TS b) Page 5 only put the LCO and action statements that must be so that is why it is listed like this in entered no need to put the ones referred to. the scenario. If TS is not applicable c) Page 6 same comments as made in 1. above. it will be stated as such.

d) Page 7 same comments as made in 1. above. c) See comment above e) Why not let scenario go to when the crew has the leak d) See comment above 4 of 5

NRC Exam Submittal Comments for DC Cook 2012 Initial Exam Examiner Comment Facility Action/Response isolated??? I would like to see how the crew responds without e) Added two more steps to isolate the charging and letdown. Scenario should continue to second BIT and Establish Charging flow.

depressurization.

5 of 5