ML12226A355

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance Review of Turkey Point Units 3 and 4 - Application to Revise Technical Specifications to Adopt TSTF-510
ML12226A355
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/13/2012
From: Farideh Saba
Division of Operating Reactor Licensing
To: Tomonto B
Florida Power & Light Co
References
TAC ME9106, TAC ME9107
Download: ML12226A355 (2)


Text

1 NRR-PMDAPEm Resource From:

Saba, Farideh Sent:

Monday, August 13, 2012 10:26 AM To:

Tomonto, Bob; Hanek, Olga

Subject:

Acceptance Review of Turkey Point Units 3 and 4 - application to revise Technical Specifications to adopt TSTF-510 (TAC Nos. ME9106 and ME9107)

Importance:

High

Bob, By letter dated July 16, 2012, as supplemented by letter dated August 10, 2012, Florida Power and Light Company (the licensee) submitted for a license amendment request (LAR) to the Renewed Facility Operating Licenses for Turkey Point Units 3 and 4. The proposed LAR would modify Technical Specification requirements regarding steam generators tube inspection and reporting to adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and its supplement and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1447 or via email by farideh.saba@nrc.gov.

Farideh E. Saba, P.E.

Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV

Hearing Identifier:

NRR_PMDA Email Number:

445 Mail Envelope Properties (Farideh.Saba@nrc.gov20120813102500)

Subject:

Acceptance Review of Turkey Point Units 3 and 4 - application to revise Technical Specifications to adopt TSTF-510 (TAC Nos. ME9106 and ME9107)

Sent Date:

8/13/2012 10:25:52 AM Received Date:

8/13/2012 10:25:00 AM From:

Saba, Farideh Created By:

Farideh.Saba@nrc.gov Recipients:

"Tomonto, Bob" <Bob.Tomonto@fpl.com>

Tracking Status: None "Hanek, Olga" <Olga.Hanek@fpl.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2107 8/13/2012 10:25:00 AM Options Priority:

High Return Notification:

No Reply Requested:

Yes Sensitivity:

Normal Expiration Date:

Recipients Received: