Ltr 8/10/2012 Perry Nuclear Power Plant - Notification of NRC Supplemental Inspection (95002) and Request for Information
ML12223A439
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/10/2012
From: Billy Dickson
Division of Reactor Safety III
To: Kaminskas V
FirstEnergy Nuclear Operating Co
References
EA-11-148
Download: ML12223A439 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 10, 2012 EA-11-148 Mr. Vito Kaminskas Site Vice President, Nuclear FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097

SUBJECT:

PERRY NUCLEAR POWER PLANT-NOTIFICATION OF NRC SUPPLEMENTAL INSPECTION (95002) AND REQUEST FOR INFORMATION

Dear Mr. Kaminskas:

In a letter dated April 30, 2012, you informed the U. S. Nuclear Regulatory Commission (NRC) that Perry Nuclear Power Plant (PNPP) was ready for the NRC to perform a supplemental inspection at PNPP using NRC Inspection Procedure (IP) 95002, Supplemental Inspection for One Degraded Cornerstone or any Three White Inputs in a Strategic Performance Area.

In a letter dated June 16, 2012, PNPP requested that the NRC postpone the planned 95002 Supplemental Inspection. The request indicated that questions arose regarding the completeness and adequacy of the corrective actions that were developed to address the root and contributing causes of the previously identified performance issues. Your PNPP requested additional time to conduct further review to assure that the plant was adequately prepared for the NRC's supplemental inspection.

In a letter dated August 9, 2012, you informed the NRC that PNPP was ready for the NRC to perform a supplemental inspection using NRC Inspection Procedure (IP) 95002, Supplemental Inspection for One Degraded Cornerstone or any Three White Inputs in a Strategic Performance Area.

On August 27, 2012, the NRC will begin the IP 95002 supplemental inspection. This on-site inspection is scheduled to be performed August 27 through September 14, 2012. The purpose of this inspection is to review the adequacy of your root cause, corrective actions, and extent of condition evaluation associated with your 2011 Occupational Radiation Safety Performance issues. Included in this inspection will be a review of your safety culture assessment. This inspection will not include a review of your second quarter 2012 Occupational Radiation Safety Performance Indicators. That review will be subsequently completed as part of our routine baseline inspection activities.

We have discussed the documents needed by the inspectors prior to their arrival on site for the inspection. You have already provided the root cause evaluation and supporting documentation related to the June 2, 2012, resin spill event in the radwaste building 574 elevation. You have

V. Kaminskas indicated that the report from your corrective action program and the supporting information related to the scaffolding in the turbine building 577 elevation catacomb area will arrive before August 10, 2012. Additionally, you have stated that there have been no revision(s) to the root cause investigation report(s) for the White finding and White performance indicator for occupational radiation safety previously supplied for the 95002 supplemental inspection that was postponed at your request.

If you have any questions regarding our schedule or the material being requested, please contact John Cassidy at (630) 829-9667. He may also be reached electronically at john.cassidy@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Billy C. Dickson, Jr., Chief Health Physics and Incident Response Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58

Enclosure:

Supplemental Inspection Document Request cc w/encl: Distribution via ListServ TM

Enclosure SUPPLEMENTAL INSPECTION DOCUMENT REQUEST Inspection Report: 05000440/2012009(DRS)

Inspection Dates:

August 27 through September 14, 2012.

Inspection Procedure:

Inspectors:

John Cassidy, Lead Inspector 95002 (630) 829-9667 john.cassidy@nrc.gov Mark Mitchell John Ellegood (630) 829-9855 (269) 465-5353 mark.mitchell@nrc.gov john.ellegood@nrc.gov John Rutkowski Molly Keefe (630) 829-9730 (301) 415-5717 john.rutkowski@nrc.gov Gregg Hansen molly.keefe@nrc.gov (630) 829-9610 gregory.hansen@nrc.gov We have discussed the documents needed by the inspectors prior to their arrival on site for the inspection. You have already provided or planned to provide the following documents to the lead inspector, John Cassidy, at the NRC Region III office.

I.

Information Requested by August 10, 2012:

Reports

1.

A copy of all corrective action documents and supporting information related to the scaffolding in the turbine building 577 elevation catacomb area identified as Non-Cited Violation 05000440/2012003-02 Failure To Appropriately Control Access To A Locked High Radiation Area

2.

A copy of all corrective action documents and supporting information related to June 2, 2012 resin spill event in the radwaste building 574 elevation.

3.

You have stated that the root cause investigation reports for the White finding and White performance indicator for Occupational Radiation Safety previously supplied for the 95002 supplemental inspection not changed since the inspection was postponed at your request If the information requested above changes or will not be available, please contact John Cassidy as soon as possible at (630) 829-9667 or e-mail john.cassidy@nrc.gov.

V. Kaminskas indicated that the report from your corrective action program and the supporting information related to the scaffolding in the turbine building 577 elevation catacomb area will arrive before August 10, 2012. Additionally, you have stated that there have been no revision(s) to the root cause investigation report(s) for the White finding and White performance indicator for occupational radiation safety previously supplied for the 95002 supplemental inspection that was postponed at your request.

If you have any questions regarding our schedule or the material being requested, please contact John Cassidy at (630) 829-9667. He may also be reached electronically at john.cassidy@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Billy C. Dickson, Jr., Chief Health Physics and Incident Response Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58

Enclosure:

Supplemental Inspection Document Request cc w/encl: Distribution via ListServ' DISTRIBUTION:

Silas Kennedy RidsNrrPMPerry Resource RidsNrrDorlLpI3-2 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: Ltr 081012 Perry SRM DRS 95002 RFI Round2 Rev 1.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JCassidy JGeissner BDickson DATE 8/10/12 8/10/12 8/10/12 OFFICIAL RECORD COPY