ML12213A386

From kanterella
Jump to navigation Jump to search
FOIA/PA-2012-0121 - Resp 3 - Partial
ML12213A386
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/27/2012
From: Sealing D
NRC/OIS/IRSD/RFSB
To: Kamps K
Beyond Nuclear
References
FOIA/PA-2012-0121
Download: ML12213A386 (1)


Text

NRC FORM 464 Part I U.S. NUCLEAR REGULATORY COMMISSION FOIA/PA RESPONSE NUMBER (4-2011) 2012-0121 3 RESPONSE TO FREEDOM OF INFORMATION ACT (FOIA) / PRIVACY RESPONSE TYPE FINAL PARTIAL ACT (PA) REQUEST REQUESTER DATE Kevin Kamps RI '

  • PART I. -- INFORMATION RELEASED D No additional agency records subject to the request have been located.

D Requested records are available through another public distribution program. See Comments section.

7 [APPENDICES Agency records subject to the request that are identified inthe listed appendices are already available for El public inspection and copying at the NRC Public Document Room.

21] APPENDICES kJ

] Agency records subject to the request that are identified inthe listed appendices are being made available for public inspection and copying at the NRC Public Document Room.

7 Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC Public Document Room, 11555 Rockville Pike, Rockville, MD 20852-2738.

R-1 APPENDICES ] Agency records subject to the request are enclosed.

D Records subject to the request that contain information originated by or of interest to another Federal agency have been referred to that agency (see comments section) for a disclosure determination and direct response to you.

We are continuing to process your request.

D See Comments.

PART LA -- FEES AMOUNT FD1 You will be billed by NRC for the amount listed. F-- None. Minimum fee threshold not met.

$ 0.00 D- You will receive a refund for the amount listed. F1 Fees waived.

See comments for details PART I.B -- INFORMATION NOT.LOCATED OR WITHHELD FROM DISCLOSURE No agency records subject to the request have been located.

77 Certain information inthe requested records is being withheld from disclosure pursuant to the exemptions described in and for the reasons stated in Part I1.

SThis determination may be appealed within 30 days by writing to the FOIAIPA Officer, U.S. Nuclear Regulatory Commission, E] Washington, DC .20555-0001. Clearly state on the envelope and in the letter that it is a "FOIA/PA Appeal."

PART I.C COMMENTS (Use attached Comments continuation page if required)

The incoming request is located in ADAMS at ML12032A047 SIQNATJ EDOM Or IINF RýAT2ýACPAD 0 CER

ýXa Ll.ealiKgm Or L NRC FORM 464 Part 1 (4-2011)

Re: FOIA-2012-0121

. APPENDIX D RECORDS BEING RELEASED IN THEIR ENTIRETY (If copyrighted, identify with *)

NO. DATE DESCRIPTION (PAGE COUNT)

1. undated Questions on CR-2011-03346 (Mold Hold Restraint (3 pages)
2. undated Calculation C-CSS-099.20-054, Revision 0 (4 pages)
3. undated Bechtel Response to Calculation C-CSS-099.20-054, Revision 0 (1 page)
4. undated Review of Technical Assessment Report No. 25539-200 COR-0000-00001 (2 pages)
5. undated C-CSS-099.20054, Rev. 000 (3 pages)
6. undated SB-00-20: CR-2011-03346 Evaluation (5 pages)
7. 10/2011 Communications Plan (12 pages)
8. 10/2011 Addendum to the Reactor Vessel Head Replacement Communication Plan (8 pages)
9. 10/11/11 E-mail from S. CuadradoDeJesus to B. Jose, et al,

Subject:

RE: Daily morning meeting minutes - October 1 1 th - 2011 -forgot Davis-Besse text in original (1 page)

10. 10/11/11 E-mail from S. Cuadrado DeJesus to A. Sheikh, et al,

Subject:

FW:

Davis-Besse Shield Building Crack (2 pages)

11. 10/12/11 E-mail from T. Lupold to P. Hiland, et al,

Subject:

FW: Davis-Besse shield building crack (identified during RPV head replacement (3 pages)

12. 10/12/11 E-mail from D. Hills to T. Lupold, et al,

Subject:

RE: Davis-Besse shield building crack (identified during RPV head replacement (3 pages)

13. 10/12/11 E-mail from S. Cuadrado DeJesus to R. Auluck, et al,

Subject:

FW:

Davis-Besse plant to contact media (1 page)

14. 10/12/11 E-mail from A. Rezai to D. Hills, et al,

Subject:

RE: Davis-Besse shield building crack (identified during RPV head replacement) (4 pages)

15. 10/18/11 E-mail from A. Sheikh to S. CuadradoDeJesus, et al,

Subject:

RE:

DB presentation (1 page)

16. 10/19/11 E-mail from E. Sanchez Santiago to M. Murphy, et al,

Subject:

FW: Davis Besse Phone Call Feedback (1 page) 1

Re: .FOIA-2012-0121 APPENDIX D RECORDS BEING RELEASED IN THEIR ENTIRETY (If copyrighted, identify with *)

17. 10/28/11 Table of Contents to Isolated Crack Indication Identified by Impulse Response Testing of the Shield Building (15 pages)
18. 11/03/11 E-mail from E. Sanchez Santiago to M. Murphy, et al,

Subject:

11-2-2011 Conference Call Summary (1 page)

19. 11/09/11 E-mail from E. Sanchez Santiago to M. Murphy, et al,

Subject:

FW: NRC Technical Reviewer Focus Questions (2 pages)

20. 11/10/11 Davis-Besse Nuclear Power Station Containment Shield Building Issue (2 pages)
21. 11/14/11 E-mail from E. Sanchez Santiago to M. Murphy, et al,

Subject:

FW: Davis Besse Shield Building: Technical Review Discussion Items (2 pages)

22. 11/15/11 Davis-Besse Shield Building Laminar Cracking (12 pages)
23. 11/18/11 E-mail from P. Hernandez to M. Hamm, Subject; RE: DB Containment (system) Writeup (2 pages)
24. 11/26/11 E-mail from J. Zimmerman to M. Evans, et al,

Subject:

FYI: Davis-Besse Draft CAL (4 pages)

25. 11/29/11 E-mail from P. Hernandez to E. Sanchez-Santiago,

Subject:

FW: C-1 11A Drawing Inconsistency?

26. 12/02/11 E-mail from S. Sakai to A. Erickson,

Subject:

FW: Licensee Projected Timeline (2 pages)

27. 12/02/11 E-mail from T. Briley to M. Murphy, et al,

Subject:

Davis-Besse Shield Building (1 page)

28. 12/02/11 E-mail from V. Mitlyng to T. Briley, et al,

Subject:

PRESS RELEASE HAS BEEN ISSUED (1 page)

29. 12/15/11 E-mail from J. Neurauter to W. Jessup, et al,

Subject:

RE: Davis-Besse Functionality Review Criteria Summary (3 pages)

30. 01/03/12 E-mail from P.. Hernandez to M. Mahoney, et al,

Subject:

Q & A assignments for Davis Besse (17 pages)

31. 01/04/12 E-mail from J. Neurauter to M. Murphy, et al,

Subject:

Davis Besse shield building issue documents (1 page) 2

Re: .FOIA-2012-0121 APPENDIX D RECORDS BEING RELEASED IN THEIR ENTIRETY (If copyrighted, identify with *)

32. 01/17/12 E-mail from R. Auluck to D. Hills, et al,

Subject:

RE: Davis Besse Shield Building - License Renewal (5 pages)

33. 01/17/12 E-mail from A. Stone to S. CuadradoDeJesus, et al,

Subject:

RE:

Davis Besse Shield Building - License Renewal (5 pages)

34. 01/17/12 E-mail from D. Hills to S. CuadradoDeJesus, et al,

Subject:

RE:

Davis Besse Shield Building - License Renewal (5 pages)

35. 01/18/12 E-mail from P. Hernandez to S. CuadradoDeJesus,

Subject:

RE:

Davis Besse Shield Building (2 pages)

36. 01/18/12 E-mail from M. Holmberg to S. CuadradoDeJesus,

Subject:

RE:

Davis Besse Shield Building - License Renewal (3 pages)

37. 01/20/12 E-mail from M. Holmberg to S. CuadradoDeJesus, et al,

Subject:

RE: Status Call Results - DB SB Cracking (2 pages)

38. 01/20/12 E-mail from M. Holmberg to J. Neurauter, et al,

Subject:

SB Root Cause Effort (1 page)

39. 01/23/12 E-mail from M. Holmberg to S. CuadradoDeJesus,

Subject:

RE: Status Call Results - DB SB Cracking (2 pages)

40. 01/23/12 E-mail from A. Sheikh to S. CuadradoDeJesus, et al,

Subject:

RE: Status Call Results - DB SB Cracking (3 pages)

41. 01/23/12 E-mail from M. Holmberg to S. CuadradoDeJesus, et al,

Subject:

RE: (1 page)

42. 01/25/12 E-mail from M. Holmberg to S. CuadradoDeJesus,

Subject:

Bridge line for Thursdays Call? (1 page)

43. 01/26/12 E-mail from D. Morey to A. Stone, et al,

Subject:

RE: Decision on releasing draft SER (1 page)

44. 01/26/12 E-mail from B. Jose to S. CuadradoDeJesus, et al,

Subject:

FW: Davis-Besse Draft SEIS is delayed (1 page)

45. 01/26/12 E-mail from P. Cooper to P. Chandrathil, et al,

Subject:

Re: Davis-Besse Draft SEIS is delayed (4 pages) 3

Re: FOIA-2012-0121 APPENDIX D RECORDS BEING RELEASED IN THEIR ENTIRETY (If copyrighted, identify with *)

46. Undated White Paper: Review of Technical Report No: 25539-200-COR-0000-00001, Structural Evaluation of Shield Building, Davis-Bess Nuclear Plant (3 pages)
47. 11/14/11 E-Mail from V. Meghani, RIII, to H. Graves, RES/DE/SGSEB, et. Al.,

Subject:

RE: Davis Besse shield building cracks (1 page)

48. 11/16/11 E-Mail from E. Sanchez-Santiago, RIII, to M. Murphy, NRO/DORL, et. Al.,

Subject:

FW: Davis Besse Shield Building Technical Review Discussion Items (2 pages)

49. 11/21/11 E-Mail from E. Sanchez-Santiago, RIII to M. Murphy, NRO/DORL, et. Al.,

Subject:

Davis Besse shield building issue evaluation (1 page)

50. 12/01/11 E-Mail from T. Briley, RIII, to M. Murphy, NRO/DORL, et. Al.,

Subject:

Davis-Besse Shield Building Calculation References (1 page)

51. 12/02/11 E-Mail from J. Rutkowski, RIII, to T. Briley, RIII et. Al.,

Subject:

Licensee Project Timeline (2 pages)

52. 12/02/11 E-Mail from P. Hernandez, OE/CRB, to M. Evans, NRR/DORL, et. Al.,

Subject:

RE: Davis-Besse POP (2 pages)

53. 11/22/11 E-mail from E. Williamson, OGC to L. Subin, OGC

Subject:

FW: Davis Besse Shield Building Path Forward Discussion w/attached meeting scheduler 4