UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 26, 2012 Mr. Kevin Walsh Vice President, Seabrook Nuclear Plant clo Mr. Michael O'Keefe NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT 1 - STATUS OF 90-DAY RESPONSE TO REQUEST FOR INFORMATION REGARDING RECOMMENDATION 9.3 OF THE NEAR-TERM TASK FORCE RELATED TO THE FUKUSHIMA DAI-ICHI NUCLEAR POWER PLANT ACCIDENT
Dear Mr. Walsh:
By letter dated March 12, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12053A340), the U.S. Nuclear Regulatory Commission (NRC) issued a Request for Information (RFI) pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54, paragraph (f), regarding Recommendations 2.1 (seismic and flooding evaluations), 2.3 (seismic and flooding walkdowns), and 9.3 (emergency preparedness communication and staffing) of the Near Term Task Force review of insights from the Fukushima Dai-ichi accident. With respect to Recommendation 9.3, Enclosure 5 to the NRC's letter requested licensees to assess their means to power communications equipment onsite and offsite during a prolonged Station Blackout event and to perform a staffing study to determine the staff required to fill all necessary positions in response to a multi-unit event. In a letter dated June 6,2012 (ADAMS Accession No. ML12163A124), NextEra Energy Seabrook, LLC (NextEra) submitted a response for Seabrook Station, Unit 1 (Seabrook).
The RFI required responses pursuant to the provisions of 10 CFR 50.54(f) including communication item 2, and staffing items 3, 4, and 5. Item 2 of the communication enclosure pertains to interim actions to power supplies. Items 3, 4, and 5 of the staffing enclosure pertain to notification methods for augmented staff, methods of access to the site, and interim actions prior to the completion of the staffing assessment. The responses to communication items 1 and 3, as well as staffing items 1, 2, and 6 are expected to be submitted consistent with the schedule provided in the 60-day licensee's response letter dated May 10, 2012 (ADAMS Accession No. ML12136A238).
Also consistent with the 60-day response, the NRC expects NextEra to address in the final staffing analysis, the methods of access to the site requested in staffing item 4 related to air transport methods at Seabrook. The NRC staff acknowledges that NextEra provided the information requested in the RFI regarding the 90-day response for Recommendation 9.3 for communication item 2, and staffing items 3, 4, and 5, within the time requested for Seabrook.
The NRC has reviewed the responses by NextEra to these issues for adequacy of the information, and has no additional questions. Regarding communication items 1 and 3, and staffing items 1, 2, and 6, the staff will review the information when it is received in accordance with the schedule provided in the licensee's May 10,2012, letter.
K. Walsh
- 2 If you have any questions regarding this letter, please contact Ms. Jessica Kratchman at (301) 415-5512.
Sincerely, Michele G. Evans, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv
K. Walsh
- 2 If you have any questions regarding this letter, please contact Ms. Jessica Kratchman at (301) 415-5512.
Docket No. 50-443 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPLI-2 Branch Reading RidsAcrsAcnw_MailCenter Resource RidsNrrDorlLpll-2 Resource RidsNrrLASRohrer Resource RidsNrrLAABaxter Resource RidsNrrPMSeabrookResource RidsNsirDprDdep Resource RidsOgcRp Resource RidsRgn1 MailCenter Resource JKratchman, NRR/JLD JShea, NRR/~ILD KWilliams, NSIR CMurray, NSIR ADAMS Accession No. ML12205A096 Sincerely,
/raj (LLund for)
Michele G. Evans, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
- via e-mail NRR-106 OFFICE ILPLI-2/PM ILPLI-2/LA
~....
IABaxter*
NAME
- JLamb DATE 107/23/12
! 07/26/12 NSIRIDPR/NRLB/BC LPLI-2/BC DORLID KWiliiams*
MKhanna MEvans (LLund for) 7116112 7/25/12