MONTHYEARML24264A0232024-09-20020 September 2024 RAI TSTF-600, Rev. 0, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML24249A1482024-09-11011 September 2024 Cover Letter for Final Traveler SE of TSTF 576, Revision 3, Revise Safety/Relief Valve Requirements ML24247A3162024-09-0606 September 2024 Cover Letter for Final Model SE of Traveler TSTF 592, Rev 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24222A4002024-08-14014 August 2024 TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents, Acceptance Review Letter ML24106A2762024-08-0101 August 2024 Draft Safety Evaluation of Technical Specifications Task Force Traveler TSTF-576, Revision 3, Revise Safety/Relief Valve Requirements (EPID L -2019-PMP-0207) ML24207A1822024-07-25025 July 2024 TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review Letter ML24114A2572024-04-24024 April 2024 TSTF-599 Acceptance Review Letter ML24114A2652024-04-24024 April 2024 TSTF-597 Acceptance Review Letter ML23325A2132023-12-18018 December 2023 Cover Letter for Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML23262B2292023-09-21021 September 2023 Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program ML23124A2212023-09-11011 September 2023 Cover Letter for Final SEs of TSTF-589, Eliminate Automatic Diesel Generator (DG) Start During Shutdown ML23206A1242023-07-31031 July 2023 TSTF-584 Cover Letter for Final SE ML23205A2342023-07-0606 July 2023 Draft TSTF-601, Extend Shield Building Completion Time After Refueling ML23012A2812023-03-13013 March 2023 Draft SEs of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML23059A3342023-02-28028 February 2023 TSTF-576 Open Issues Letter ML23010A2592023-01-11011 January 2023 Request for Additional Information Traveler TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22272A5542022-10-0707 October 2022 Request for Additional Information Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program TSTF-22-07, Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2022-07-19019 July 2022 Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22193A2372022-07-12012 July 2022 Request for Additional Information TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown TSTF-22-06, Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability2022-07-0808 July 2022 Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability ML22110A1712022-04-26026 April 2022 Acceptance for Review Regarding Traveler Tstf-584, Rev 0, Eliminate Automatic RWCU System Isolation on SLC Initiation TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program2022-03-22022 March 2022 Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program ML21188A2782021-07-11011 July 2021 Cover Letter Transmitting Final SEs of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling TSTF-21-03, TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 12021-06-23023 June 2021 TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 1 ML21054A2512021-05-26026 May 2021 Cover Letter Transmitting Draft SEs of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown ML21106A2452021-04-20020 April 2021 Cover Letter Transmitting Final Model SE of TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21098A2422021-04-14014 April 2021 Cover Letter for Final SEs of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21068A4012021-03-24024 March 2021 Cover Letter for Draft SEs TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections TSTF-21-01, Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-01-26026 January 2021 Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML20322A3612020-12-18018 December 2020 TSTF-554 Cover Letter for Final SE ML20308A6562020-11-0606 November 2020 Request for Additional Information Traveler TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20168A3962020-10-30030 October 2020 Cover Letter Transmitting Draft SE of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML20265A1152020-10-0909 October 2020 Cover Letter Transmitting Model SE of TSTF-582 and TSTF-583-T ML20133J8832020-07-29029 July 2020 Letter Transmitting Draft SE of Traveler TSTF-582, Revision 0, RPV WIC Enhancements TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections2020-06-0808 June 2020 Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20133J8152020-05-13013 May 2020 Letter Transmitting Revised Final SE of Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process ML20132A1832020-05-11011 May 2020 Request for Additional Information TSTF-576, Revision 0, Revised Safety/Relief Valve Requirement TSTF-20-01, Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP)2020-04-0909 April 2020 Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP) TSTF-19-14, Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements2020-02-12012 February 2020 Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements TSTF-19-11, TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements2020-01-16016 January 2020 TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements ML19325C4362019-12-17017 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements2019-12-13013 December 2019 Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements ML19323E9282019-12-10010 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position TSTF-19-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2019-12-0303 December 2019 Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position.2019-11-0505 November 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-08-28028 August 2019 Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19176A1892019-08-14014 August 2019 Cover Letter Transmitting Final Safety Evaluations of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition TSTF-19-03, Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter2019-07-0808 July 2019 Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter TSTF-19-08, Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements.2019-07-0303 July 2019 Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements. TSTF-19-06, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition2019-06-25025 June 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition 2024-09-06
[Table view] |
Text
October 1, 2012 Technical Specifications Task Force (TSTF) 11921 Rockville Pike Suite 100 Rockville, MD 20852
SUBJECT:
U.S. NUCLEAR REGULATORY COMMISSION (NRC) STAFF RESONSE TO TSTF LETTER DATED JULY 4, 2012, REGARDING TSTF RESPONSE TO NRC REQUEST TO REVISE TSTF TRAVELER MODEL APPLICATIONS
Dear Members of the TSTF:
The NRC staff has completed its review of your letter dated July 4, 2012 (ADAMS Accession No. ML12187A184). The letter was in response to our request at the May 8, 2012, public meeting that Traveler model applications, be revised to address operating plants that were licensed before the provisions of Appendix A to Part 50, General Design Criteria [GDC] for Nuclear Power Plants, of Title 10 of the Code of Federal Regulations (10 CFR), as well as, operating plants that were licensed after the provisions of Appendix A to 10 CFR Part 50.
In your letter, you proposed the following four steps to address our request:
- 1. Future Travelers will continue to discuss the 10 CFR [Part] 50 Appendix A GDC, as needed.
- 2. Future Traveler model applications for Travelers that discuss the GDC will instruct licensees that are not licensed to the 10 CFR [Part] 50, Appendix A GDC to discuss in the LAR
[license amendment request] their plant-specific licensing basis that is equivalent to the GDC referenced in the Traveler.
[A model application example was provided.]
- 3. In future model SEs [safety evaluations], the NRC should provide guidance to reviewers to utilize the discussion of the 10 CFR [Part] 50, Appendix A GDC in the model SE or the licensee-provided discussion of plant-specific requirements, as applicable.
- 4. The TSTF will recommend that licensees adopting previously-approved Travelers do the following:
- a. If the Traveler or model SE reference the 10 CFR
[Part] 50, Appendix A GDC and [the GDC are] consistent with the plants licensing basis, the model application should be used as written.
- b. If the Traveler or model SE reference the 10 CFR [Part] 50, Appendix A GDC and [the GDC are] not consistent with the
TSTF plants licensing basis, a discussion similar to the example in Item 2 should be included in the model application, Section 2.1, Applicability of the Published Safety Evaluation. We do not expect that this variation will result in a Traveler being removed from Consolidated Line Item Improvement Process (CLIIP), if applicable.
The NRC staff has completed its review of your letter. The NRC staff agrees that future Travelers should (1) continue to discuss the 10 CFR Part 50 Appendix A GDC, and (2) licensees that were licensed before the provisions of Appendix A to 10 CFR Part 50 will need to discuss in their LARs their plant-specific licensing basis that is equivalent to the GDC referenced in the Traveler. The NRC staff finds that the model application example provided in Item 2 of the July 4, 2012, letter sufficiently requests the plant-specific licensing basis equivalent to the 10 CFR Part 50 Appendix A GDC, as well as its location in the plants final safety analysis report. In addition, the NRC staff agrees with inserting a Note into future Traveler model SEs to remind NRC reviewers that the plant-specific licensing basis equivalent to the GDCs should be used for plants that were licensed before the provisions of Appendix A to 10 CFR Part 50.
Licensees with plants licensed after the provisions of Appendix A to 10 CFR Part 50 should use the model application as written when requesting a previously-approved Traveler. When adopting a previously-approved Traveler, if the plant was licensed before the provisions of Appendix A to 10 CFR Part 50, the licensee shall provide in the LAR the plant-specific licensing basis equivalent to the 10 CFR Part 50 Appendix A GDC, as well as its location in the plants final safety analysis report in order for the LAR to remain in the CLIIP. If this information is not provided, the NRC staff will remove the LAR from the CLIIP and the LAR will be treated as a normal license amendment and, as such, will be subject to the normal licensing action review timeliness metrics as stated in LIC-101, License Amendment Review Procedures.
Please contact Michelle C. Honcharik at (301) 415-1774 or Michelle.Honcharik@nrc.gov if you have any questions or need further information on this letter.
Sincerely,
/RA/
Sheldon D. Stuchell, Acting Chief Licensing Processes Branch Division of Policy Rulemaking Office of Nuclear Reactor Regulation Project No. 753 cc: See next page
ML12202A208 *concurred via e-mail NRR-106 OFFICE STSB STSB/BC PLPB/LA PLPB/PM LPL1-2/BC PLPB/BC (A)
NAME KBucholtz RBElliott DBaxley MHoncharik MKhanna* SStuchell DATE 7/26/2012 7/30/2012 8/7/2012 8/10/2012 9/24/2012 10/1/2012 Technical Specifications Task Force Project No. 753 cc:
Technical Specifications Task Force 11921 Rockville Pike Suite 100 Rockville, MD 20852 Attention: Donald R. Hoffman E-mail: donaldh@excelservices.com Robert A. Slough Comanche Peak Nuclear Power Plant P. O. Box 1002, Mail Code A08 Glen Rose, Texas 76043 E-mail: robert.slough@luminant.com Roy A. (Tony) Browning Duane Arnold Energy Center 3277 DAEC Rd.
PSC/Licensing Palo, IA 52324-9785 E-mail: tony.browning@nexteraenergy.com Wendy E. Croft Exelon Nuclear 200 Exelon Way, Suite 340 Kennett Square, PA 19348 E-mail: wendi.croft@exeloncorp.com Otto W. Gustafson Entergy Nuclear Operations, Inc.
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: ogustaf@entergy.com Brian D. Mann EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 E-mail: brianm@excelservices.com