ML12194A502

From kanterella
Jump to navigation Jump to search
Initial Exam 2012-301 Draft Administrative JPMs
ML12194A502
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/12/2012
From:
NRC/RGN-II
To:
Progress Energy Co
References
50-400/12-301
Download: ML12194A502 (83)


Text

Appendix C Job Performance Measure Form ES-C-i Worksheet Facility: Shearon Harris Task No.: 015004H201 Task

Title:

Perform the Quadrant Power Tilt JPM No.: 2012 NRC Exam Ratio Surveillance Admin JPM RO A2 K/A

Reference:

G2.2.12 RO 3.7 SRO 4.1 Alternate Path: No Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinQ:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

. The plant has been stabilized at 75% power following a dropped rod in Control Bank B (M-6) while performing a plant startup.

Initial Conditions:

  • The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND INDICATION SYSTEM.
  • There are NO deficiency tags on PRNIs.

The CRS has directed you to perform a manual QPTR lAW OST-1 039, CALCULATION OF QPTR. The Power Range NIS readings are provided in the table below.

Initiating Cue:

For the purposes of the examination, there will be no independent verification. Show values of your work.

2012 NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Job Performance Measure Form ES-C-i Worksheet Task Standard: Calculations within required band.

Correct Tech Spec actions are identified.

Required Materials: Calculator General

References:

OST-i039, CALCULATION OF QPTR, Revision 15 Technical Specifications Handouts:

  • OST-1 039
  • Power Range NI Current and Voltage Set point Table
  • Technical Specifications Time Critical Task: No Validation Time: 10 minutes Critical Step Justification Must accurately determine the correct calculation based on collecting Step 11 and inputting either provided data or visual inspection data. The calculation will yield an unsatisfactory QPTR.

Must identify that the QPTR upper is outside the band which will make Ste p 14 this overall results unsatisfactory.

Must unsatisfactory that the QPTR is greater than 1 .02 (which is a Tech Ste I 15 Spec limit).

Must correctly identify through documentation that the QPTR limits are Step 16 exceeded.

2012 NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Page 3 of 13 Form ES-C-i PERFORMANCE [NFQRMATION Start Time:

Performance Step: 1 Obtain procedure.

Standard: Reviews procedure.

Evaluator Cue: Provide OST-1 039.

Evaluator Note: A KEY is provided for your use on JPM prior to candidate pages.

Comment:

NOTE: The NI curve numbers provided in this JPM are Evaluator Note: numbers made specifically for use in this JPM they are NOT current plant values.

Precaution and Limitation 4.0.1 has guidance if performing this Procedure Note: OST with one Power Range Channel inoperable.

Performance Step: 2 Completes Prerequisites section:

  • Verify instrumentation needed for the performance of this test is free of deficiencies that affect instrument indication.
  • Verify the most recent Curve F-X-8 is used in the performance of this procedure. (Reference 2.1.1 and 2.1.2)
  • OBTAIN CRS permission to perform this OST.

Standard:

  • Logs F-X-8 revision number: 9
  • Initials/signs all blocks Comment:

V Denotes Critical Steps

- 2012 NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Page 4 of 13 Form ES-C-i

. PERFQRMANCE 1NFORMATlQN Performance Step: 3

  • IF Quadrant Power Tilt Ratio Calculation Computer Program is used, THEN PERFORM the following:
  • MARK Step 7.0.2 N/A.
  • MARK Section 7.2 N/A.
  • PERFORM Section 7.1.
  • IF manual calculation of the Quadrant Power Tilt Ratio is used, THEN PERFORM the following:
  • MARK Section 7.1 N/A.
  • PERFORM Section 7.2.

Standard:

  • Marks Section 7.1 N/A
  • Proceeds to Section 7.2 Comment:

OST-1039 Section 7.2 Note prior to step 1 Performance Step: 4 NOTE: The detector current meters on each power range channel drawer are designated as left-upper, right-lower.

Standard: Reads and circle slashes note Comment:

OST-1039 Section 7.2, Step 1 Performance Step: 5 Prior to reading the value of detector current, VERIFY the meter range/rate switch is in the 400 iA/SLOW position.

Standard: Prior to reading the value of detector current, VERIFIES the Meter Range/Rate switch is in the 400 pA/SLOW position.

Evaluator Note: This information is on the JPM Cue Sheet Comment:

V - Denotes Critical Steps 2012 NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Page 5 of 13 Form ES-C-i PERFORMANCE INFQRMATION -

OST-i 039 Section 7.2, Step 2 Performance Step: 6 RECORD on Attachment 2, in column A, the upper and lower detector currents from all operable power range channels as read on the Nuclear Instrumentation Cabinet.

Standard: Transposes readings from PRNIS Readings Table onto Attachment 2.

Comment:

OST-i 039 Section 7.2, Step 3 J Performance Step: 7 RECORD on Attachment 2, in column B, the 100% power normalized current for each channel from Curve F-x-8.

Standard: Transposes TOP and BOTTOM 100% current values from the Curve Book provided.

Comment:

OST-i 039 Section 7.2, Note prior to Step 4 Performance Step: 8 NOTE: When recording all fractions and ratios, record to four decimal places, dropping the fifth and subsequent decimal places.

Standard: Reads and circle slashes note Comment:

OST-i 039 Section 7.2, Step 4 Performance Step: 9 Divide values in Column A by the respective normalized current in Column B and record the result in Column C as the Normalized Fraction.

Standard: Divides each Upper and Lower reading by the respective 100%

normalized current value and records in Column C.

Comment:

V - Denotes Critical Steps 2012 NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Page 6 of 13 Form ES-C-i PERFORMANCE LNFORMAT1QPL OST-1039 Section 7.2, Step 5 Performance Step: 10 CALCULATE the average value for the upper and the lower Normalized Fractions as follows:

  • ADD the Normalized Fraction in each section of column C, recording the sum in the space provided.
  • DIVIDE the sum obtained in Step 7.2.5.a by the number of operable NI channels, recording the result in column D of Attachment 2.

Standard: Adds all Normalized Fractions for the same plane and records the sum in the space provided.

Divides by the sum by four and records result in Column D.

Comment:

OST-1039 Section 7.2, Step 6 q Performance Step: 11 Using the formula and values from Attachment 2, CALCULATE the Upper and Lower Ratios.

Standard:

  • Divides the Maximum Normalized Fraction by the Average Normalized Fraction on each plane.
  • Determines the UPPER ratio is 1.02 The applicant may inform the CRS as soon as any Evaluator Note: calculation is> 1.02. If so, acknowledge and direct applicant to complete Attachment 2.

Comment:

OST-1 039 Section 7.2, Step 7 Performance Step: 12 PERFORM independent verification of all calculations made on Attachment 2.

Standard: Requests Independent Verifier.

Evaluator Cue: If necessary, repeat Initiating Cue: For the purpose of this examination, there will be no independent verification of your work.

Comment: Candidate may choose to check calculations.

V - Denotes Critical Steps 2012 NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Page 7 of 13 Form ES-C-i

. PERFORMANCE LNFQRMAT[Qi\t OST-i 039 Section 7.2, Note prior to Step 8 Performance Step: 13 NOTE: The upper ratio or the lower ratio, whichever is greater, is the quadrant power tilt ratio (QPTR).

Standard: Reads and circle slashes note Comment:

OST-1039 Section 7.2, Step 8 q Performance Step: 14 RECORD QPTR:

Standard: Records QPTR value as 1.0400 to 1.0410 (N44 UPPER)

Identifies Upper as outside the band Comment: Acceptable band is +1- 5% (rounded to .0005).

UPPER calculated band is 1.0400 to 1.0410 LOWER calculated band is 1.01 55 to 1.01 65 OST-1 039 Section 7.2, Step 9 q Performance Step: 15 CHECK QPTR is less than or equal to 1.02.

Standard: Identifies Upper QPTR as greater than 1.02 and QPTR is unacceptable Comment:

V Denotes Critical Steps

- 2012 NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Page. 8 of 13 Form ES-C-i PERFQRMANC INFQRMATIQN OST-i039 Section 7.3, Test Completion Step 1

.J Performance Step: 16

  • IF this test was performed due to an inoperable QPTR alarm, THEN DOCUMENT completion of PMID 22125 RQ 01.
  • COMPLETE applicable sections of Attachment 3, Certifications and Reviews.
  • INFORM the CRS this test is completed.

Standard:

  • Check marks Periodic Surveillance or notes AOP-001 in Comments section
  • Plant Condition: 75% Power (may note dropped rod)
  • Mode 1
  • Todays Date
  • Current Time
  • OST Completed By: Applicants name
  • Initials/Name q
  • Indicate in General Comments Section and/or informs CRS that the limit is exceeded Evaluator Cue: Acknowledge any report.

Comment:

After the CRS has been notified:

Terminating Cue:

Evaluation on this JPM is complete.

STOP Time:

V - Denotes Critical Steps 2012 NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Page 9 of 13 Form ES-C-i PE9FQ9MANQlNFQRMATLQN KEY Record QPTR = 1.0405 Acceptable band is +1- 5% (rounded to .0005) 1.0400 to 1 .0410 CHECK QPTR is less than or equal to 1 .02 (circle) YES A B C D UPPER UPPER AVERAGE UPPER 100% POWER NORMALIZED UPPER UPPER DETECTOR NORMALIZED FRACTION NORMALIZED DETECTOR CURRENT CURRENT (NOTE 1) FRACTION N-41 152.9 0.7567 115.7 172.7 0.7255 N-42 125.3 0.7543 N-43 193.0 0.7502 144.8 N-44 153.9 0.7849 120.8 SUM 3.01 73 Maximum Upper Normalized Fraction 0.7849 Upper Ratio = = = 1.0405*

Average Upper Normalized Fraction 0.7543 Standard for this calculation is 1.0400 to 1.0410 A B C D LOWER LOWER AVERAGE LOWER 100% POWER NORMALIZED LOWER LOWER DETECTOR NORMALIZED FRACTION NORMALIZED DETECTOR CURRENT CURRENT (NOTE 1) FRACTION N-41 174.1 0.7369 128.3 N-42 200.4 0.7544 151.2 0.7425 N-43 214.7 0.7494 160.9 N-44 187.9 0.7296 137.1 SUM 2.9703 Maximum Lower Normalized Fraction 0.7544 Lower Ratio = = 1.0160**

Average Lower Normalized Fraction 0.7425 Standard for this calculation is 1.0155 to 1.0165 V - Denotes Critical Steps 2012 NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Page 10 of 13 Form ES-C-i

. VERIFEQATION OF CQMPLETlON -

Job Performance Measure No.: 2012 NRC Exam Admin JPM RO A2 Perform a Quadrant Power Tilt Ratio Surveillance Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Resut: SAT UNSAT Examiners Signature: Date:

2012 NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Page ii of 13 Form ES-C-i iPMQUSHET Name:

Date:

. The plant has been stabilized at 75% power following a dropped rod in Control Bank B (M-6) while performing a

. . .. plant startup.

Initial Conditions:

  • The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND INDICATION SYSTEM.

.__No_deficiency tags_on_PRNIs.

The CRS has directed you to perform a manual QPTR lAW OST-i 039, CALCULATION OF QPTR. The Power Range NIS readings are provided in the table below.

Initiating Cue:

For the purposes of the examination, there will be no independent verification. Show values of your work.

Record QPTR =

CHECK QPTR is less than or equal to 1.02 (circle) YES / NO PR NIS Readings*

PRNIS Channel UPPER READING LOWER READING N41 115.7 128.3 N42 125.3 151.2 N43 144.8 160.9 N44 120.8 137.1 All values were taken with the Range/Rate switch in 400 pA/Slow position.

2012 NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Page 12 of 13 Form ES-C-i JPM CUE SHEET Current and Voltage Setpoints Table (100% Power, 0% Incore Axial Offset)

Top Current Bottom Current Channel # (pA) (pA)

N41 152.9 174.1 N42 172.7 200.4 N43 193.0 214.7 N44 153.9 187.9 Curve No. F-17-8 Rev. 9 2012 NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Page 13 of 13 Form ES-C-i

. JFMQL.SHT 2012 NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Page 1 of 31 Form ES-C-i

- WORKSHEET INFORMATION -

Facility: Shearon Harris Task No.: 301135H601 Task

Title:

Determine Reguirements for JPM No.: 2012 NRC Exam Makeup to RWST During a Large Admin JPM Break LOCA after Cold Leg ROISRO Al-i Recirculation has been established K/A

Reference:

G 2.1.25 RO 3.9 SRO 4.2 Alternate path: No Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

. The plant was at 100% power when a Large Break Loss Of Coolant Accident occurred.

. The crew had entered and was working through PATH-i.

. RWST level reached 23.4% and the crew transitioned to EPP-01 0, Transfer to Cold Leg Recirculation.

Initial Conditions:

  • The transfer has been completed.
  • The CRS is now on step 1 3.a, Monitor For Degraded Recirculation Sump Performance and Add makeup to RWST using OP-i 07.01, CVCS BORATION, DILUTION, AND CHEMISTRY CONTROL, Section 8.4, Blender Manual Operation.

With the information provided below, the CRS has directed you to determine the requirements for the RWST makeup using OP-i 07.01, lnitiatin g Cue attachment 5. Calculations should accomplish RWST makeup in the least amount of time allowed by procedure.

2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 2 of 31 Form ES-C-i

- WORKSHEET lFORMATFON -

Task Standard: From the provided information the candidate will determine the RWST initial and final volumes, boron concentrations, flowrates and controller setpoints to makeup to the RWST during a Large Break LOCA event.

Required Materials:

  • Calculator
  • Ruler
  • handouts General

References:

Plant curve D-i Rev. 0 OP-i 07.01, Attachment 5 and Attachment 7, Rev. 18 Handouts:

  • Plant data on candidate cue sheet
  • Plant curve D-i Rev. 0
  • OP-107.01, Attachment 5 and Attachment 7, Rev. 18 Time Critical Task: No Validation Time: 20 minutes Critical Task Justification Must determine final RWST tank boron concentration to prevent dilution Ste 6 of RCS when RWST is used for suction source of ECCS pumps.

Must determine correct volume of blended fluid to be added or blend will St ep 7 be incorrect.

Must determine required blended flow concentration or final tank volume Step 8 will be at incorrect concentration.

2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 3 of 31 Form ES-C-i

- PERFORMANCE INFORMATION -

StartTime:

Performance Step: 1 Refers to plant data provided, Curve D-1 and OP-107.Oi Attachments 5 and 7.

Comment:

OP-i 07.01 Attachments 5, Step 1 Obtain data:

Performance Step: 2 Reviews provided data and determines C = 2,489 PPM Standard: Transfers provided data correctly to line 1, C 1 = 2,489 PPM Comment:

OP-107.01 Attachments 5, Step 1 (continued)

Performance Step: 3 Determine Initial Tank Volume V 1 (RWST)

Standard: 1 V = Initial RWST Tank Volume

= 20%

Curve D-i RWST Volume 20% indicated level = 140,000 GAL (135,000 145,000)

Comment:

V - Denotes Critical Steps 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 4 of 31 Form ES-C-i PERFORMANCE INFORMATION OP-i 07.01 Attachments 5, Step i (continued)

Performance Step: 4 Determine CBAT Standard: Transfers provided data correctly to line 1, OBAT = 7,263 PPM Comment:

OP-i 07.01 Attachments 5, Step 1 (continued)

Performance Step: 5 Determine Final Tank Volume V3 (RWST) = 60%

Standard: CRS provided data that RSWT should be filled to 60%

Curve D-i, 60% RWST level = 305,000 GAL (Based on 1/2 value of curve increments Range = 300,000310,000 GAL)

Comment:

OP-107.01 Attachments 5, Step 1 (continued) q Performance Step: 6 Determine Final Tank Boron Concentration C 3 Standard: Reviews provided data and determines 3 = 2,500 PPM C

Comment:

OP-i 07.01 Attachments 5, Step 2 J Performance Step: 7 Calculate volume of the blended fluid to be added:

=V 2

V 3

=

1 V Standard: Determines V 2 = 165,000 GAL (Based on reading of RWST volume at 60%,

Range = i 55,000 i 75,000 GAL)

Comment:

V - Denotes Critical Steps 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 5 of 31 Form ES-C-i

. PERFORMANCE INFORMATION OP-i 07.01 Attachments 5, Step 3 q Performance Step: 8 Calculate the required blended flow concentration by inserting the appropriate values from step 2.

=

2 C

)

V 3

1 C (C 2 )÷V 1

V Standard: Calculates C2 (2,500) (305,000) (2,489) (140,000) ÷ (165,000) = 2,509.3 PPM (Based on previous values used and ranges for each value, 2 Range = 2508.52510.3 PPM)

C Comment:

OP-i 07.01 Attachments 5, Note Prior to step 4 Performance Step: 9 Note: Blended flows at high boron concentrations require lower total makeup flow as indicated in Attachment 7.

Standard: Reads and circle slashes note Comment:

OP-107.0i Attachments 5, Step 4 Performance Step: 10 Using the required blended flow concentration (C

) and the Boric 2

Acid Tank boron concentration (CBAT), SELECT an appropriate total makeup flow rate (0) from Attachment 7.

Standard: Using C 2 = 2,509.3 PPM and the provided information of BA Tank concentration of 7263 PPM selects the appropriate total makeup flow rate (Q) as 80 GPM from Attachment 7 page 114.

Comment:

V - Denotes Critical Steps 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 6 of 31 Form ES-C-i PERFORMANCE INFORMATION OP-i 07.01 Attachments 5, Step 5 Performance Step: 11 CALCULATE the required boric acid flowrate:

X = Boric Acid Flowrate = Q (C) ÷ (C BAT) 2 Standard: Determines X = 80 (2509.3) ÷ 7263 = 27.6 (Based on previous calculations, Range = 27 28 GPM)

Comment:

OP-i 07.01 Attachments 5, Step 6 Performance Step: 12 CALCULATE total volume of boric acid: (X is equal to boric acid flowrate)

Volume of BA = (X) (V

)

2 +/- (Q)

Standard: Calculates Volume of BA = (27.6) (165,000) ÷ 80 = 56,925 GAL (Based on all calculations to this point, Range = 53,475 60,375 GAL)

Comment:

OP-i 07.01 Attachments 5, Note prior to Step 7 Performance Step: 13 NOTE: The boric Acid Flow Controller has a 10 turn potentiometer and controls linearly from 0 to 50 gpm.

Standard: Reads and circle slashes note.

Comment:

V Denotes Critical Steps

- 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 7 of 31 Form ES-C-i

- PERFORMANCE INFORMATION- -

OP-i 07.01 Attachments 5, Step 7 Performance Step: 14 CALCULATE the required controller setpoint per the following equation:

(X) gpm ÷ 5 gpm/turnturns Standard: Calculates X = 27.6 ÷ 5 gpm/turn = 5.5 (Based on previous ranges the range is 5.4 5.6 turns)

Comment:

OP-i 07.01 Attachments 5, Note prior to Step 8 Performance Step: 15 NOTE: The RWMU Flow controller has a 10 turn potentiometer and controls linearly from 0 to 160 gpm.

Standard: Reads and circle slashes note Comment:

OP-107.01 Attachments 5, Step 8 Performance Step: 16 CALCULATE the required controller setpoint per the following equation:

Q gpm ÷ 16 gpm/turn = turns Standard: Calculates required RWMU controller setpoint as:

80 gpm ÷ 16 gpm/turn = 5 turns (no range)

Comment:

V - Denotes Critical Steps 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 8 of 31 Form ES-C-i PERFORMANCE INFORMATION Performance Step: 17 Report to CRS that RWST blender requirements have been completed.

Standard: Informs examiner that task is complete Comment:

After the candidate has returned their data sheet and reported that the calculation for RWST makeup is complete:

Terminating Cue:

Evaluation on this JPM is complete.

Stop Time:

V - Denotes Critical Steps 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 9 of 31 Form ES-C-i

- KEY Plant Data (provided with candidate cue sheet):

RWST Boron Concentration = 2489 PPM RWST Level = 20%

BAT Boron Concentration = 7263 PPM RWST Final Volume = 60%

RWST Final Boron Concentration = 2500 PPM Recorded RESULTS of Calculations on OP-107.O1 Attachment 5 Initial RWST volume 140,000 Gallons (135,000 145,000)

Final RWST volume = 305,000 Gallons (300,000310,000)

Step 2, volume of blended fluid added = 165,000 Gallons (155,000 175,000)

Step 3, Required blended flow concentration = 2509 PPM (2508 2511)

Step 4, Selected total makeup flowrate = 80 GPM (80 80)

Step 5, Required boric acid flowrate = 27.6 GPM (27 28)

Step 6, Volume of boric acid added = 56,925 Gallons (53,475 60,375)

Step 7, Required BA controller setpoint = 5.5 turns (5.4 5.6)

Step 8, Required RWMU controller setpoint = 5 turns (5 5)

NOTE: Step 5 the boric acid counter has a tenths place therefore the calculation is not rounded off to whole numbers. Therefore the range for step 5 should be 27 28 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

1) w Cl) 1 0

U-cr0 U) 0

-)

1i1Ptil E 05 OL 09 0 UP 0 0 01 0 x w

> 0 C JA3il1i E Co.

9-Ow I*voa ii1t4t#ll1 000GS 0> C)

I 0

w AdflSff[

p >- .0 Ow 1441 #1N P.

r N rTrPrr7 nJflwr Ii4IlltrItlttl II .1 1 II LtHffifliD t14 00000t z 0

C*\i lx h rttti ifti IU flttll 1llflI UH I J0 11 Il 1 1t144$44t1 44+1 4HHI 0

lx zQ tll4tN44t#ti1 [It mi#m II m14frntI I 141HtI1 H Wi1+ff[K F4t44 hf ff1 oooosc 0

0 b °°°°° 0

oooot

-D ci: tttitiJ 1tI 9jj tfti1i1+/-ti+/-tt ttlttt[.

t ci) 0 0

Appendix C Page 11 of 31 Form ES-C-i

- KEY - -

KEY REFERENCE USE Attachment 5 Blender Manual Operation Calculation Sheet Sheet 1 of 4 Personcs) Perfoming Checkhst IntiaIs Name (Print) Initials Name (Print)

Remarks Indicate any component not in the prescribed position.

Checkhst Started Time Date Checklist Completed Time Date Approved by Date CR5 After receiving the final review signature, this OP Attachment becomes a QA RECORD.

OP-10701 Reu18 Page iO3of 123 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 12 of 31 Form ES-C-i KEY KEY REFERENCE USE AttachmentS Blender Manua Operation Calcubtior Sheet Sheet 2 of 4 OBTAIN the following data:

Initial Tank Boron C 2489 PPM Concentraton Irirlul Tank Volume V = 140000 GAL Boric Acid Tank Boron = 7263 PPM Concentration Fnal Tank Volume 3 V 305000 GAL Final Tank Boron 03 2500 PPM Concentraton

2. CALCULATE volume of the blended fluio to be added 2

V = V V = GAL V305000140000 165000 GAL Verij

3. CALCULAtE the requited blended flow concentration by inserting the appropriate values from above:

= )

1 (Cj(Ci = PPM C(250G l{050G0 2489 (i4o0oo= 2S09.3 PPM NOTE: Blended flows at high boron concentrations require lower totat makeup flow as indicated in Attachment 7.

4. Using the required blended flow concentration (Cs) and the Boric Acid Tank boron concentration (CEAT. SELECT an appropriate total ma!ceup flow rate (O from Attachment 7 Q=_8OGPM OP-10701 Rev.. 18 Page 104 of 123J 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 13 of 31 Form ES-C-i KEY KEY REFERENCE USE Attachment 5 Blender Manual Operation Calculation Sheet Sheet 3 of 4

& CALCULATE the required bone acid fiowrate:

X = Boric Acid Powrate = 0 (c = GPM C 3AT)

X BoricAcidFowrate ( 25O93 = 27. GPM

( 72&3 Verify

a. IF the calculated Boric Acid flow rate (X) is greater than 30 gprn.

THEN RECALCULATE using a lower total makeup flow rate (Q). Ni A

5. CALCULATE total volume of boric acid: (X is equal to boric acid flowTate)

Volume of Boric Acid (XNV) GAL 0

165000 Volume of Boric Acid = (27 G ( 525 GAL Verify NOTE: The Boric Acid Flow Controller has a 10 turn potentiometer and controls linearly fromoto50gpm.

7. CALCULATE the required controller setpoint per the following equation:

(X) gpm ÷ 5 gprn/tum = turns 27 gpm ÷ 5 gprnitum =

turns Verify OP-i O70 1 Rev 18 Page 105 of 123 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 14 of 31 Form ES-C-i KEY KEY REFERENCE USE Attachment 5 Blender Manual Operation Calculation Sheet Sheet 4 of 4 NOTE: The RWMU Flow controller has a 10 turn potentiometer and controls linearly from 0 to 160 qpim

8. CALCULATE the required controller setpoint per the following equation:

(Q) gprn ÷ 16 gpm/tum = turns gpm ÷ 16 gprn/turn = turns Verify OP-107.01 Rev 18 Page 106 of 123 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 15 of 31 Form ES-C-i

- KEY KEY REFERENCE USE Attachment 7 Makeup Concentration Limits Sheet 6 of 9 RWMU Total Makeup Flow Rate 0 = B0gpm To determine the maximum boron concentration for which makeup will be reliable at 80 gpm total flow, select the BAT boron concentration that is equal to or lower than current BAT boron concentration Z Tdeérniine the n ut&or &mcentrián fbi hich makeup will berellblab 8Ggpm total flow,. select the BAT boron concentration wic is equal to or than current BT boron concenfration BAT BORON MAXIMUM PPM FOR 60 MINIMUM PPM FOR 80 CONCENTRATION GPM MAKEUP GPM MAKEUP (PPM) (30 GPM BA FLOW) (1 GPM BA FLOW) 7000 2625 88 7050 2643 89 7100 2662 89 7150 2681 90 7200 2700 90 7250 27i 91 7300 2737 92 7350 2756 92 7400 2775 93 7450 2793 94 7500 2812 94 7550 2831 95 7600 2850 95 7650 2868 96 7700 2887 97 7750 2906 97 OP-10L01 R&v 18 Page 114 of 123 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 16 of 31 Form ES-C-i VERIFICATION OF COMPLETIO -

Job Performance Measure No.: 2012 NRC Admin Exam JPM SRO Al-i Determine Requirements for Makeup to RWST During a Large Break LOCA after Cold Leg Recirculation has been established EOP-EPP-Oi 0, OP-i 07.01, Curve D-l Examinees Name:

Date Performed:

Facility Evauator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 17 of 31 Form ES-C-i JPCUE SHEET Name:

Date:

. The plant was at 100% power when a Large Break Loss Of Coolant Accident occurred.

  • The crew had entered and was working through PATH-i.

. RWST level reached 23.4% and the crew transitioned to EPP-OiO, Transfer to Cold Leg Recirculation.

Initial Conditions:

  • The transfer has been completed.
  • The CRS is now on step 1 3.a, Monitor For Degraded Recirculation Sump Performance and Add makeup to RWST using OP-i 07.01, CVCS BORATION, DILUTION, AND CHEMISTRY CONTROL, Section 8.4, Blender Manual Operation.

With the information provided below, the CRS has directed you to determine the requirements for the RWST makeup using OP 107.01, attachment 5. Calculations should accomplish RWST makeup in the least amount of time allowed by procedure.

Plant Data:

Initiating Cue:

RWST Initial Boron Concentration = 2489 PPM RWST Initial Level = 20%

BAT Boron Concentration = 7263 PPM RWST Final Level = 60%

RWST Final Boron Concentration = 2500 PPM Record the RESULTS of your Calculations from OP-107.O1 Attachment 5 below Initial RWST volume = Gallons Final RWST volume = Gallons Step 3, Required blended flow concentration = PPM Step 4, Selected total makeup flowrate = GPM Step 5, Required boric acid flowrate = GPM Step 6, Volume of boric acid added = Gallons Step 7, Required BA controller setpoint = turns Step 8, Required RWMU controller setpoint = turns 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 18 of 31 Form ES-C-i

- JPMCUESHEET -

REFERENCE USE Attachment 5 Blender Manual Operation Calculation Sheet Sheet 1 of 4 Person(s) Perforrnng ChckIIst Intials Name Print) IMais Name (Prtht)

Remarks Indicate any component not in the prescnbed postion.

Checkhst Started Time Date Checkhst Completed Time Date Approved by Date CRS After receiving the final review signature. ths OP Attachment becomes a QA RECORD.

FP-QT01 Rev. 1$ Page W3 of 123 2012 NRC Admin Exam JPM ROISRO Al-i Rev. 1

Appendix C Page 19 of 31 Form ES-C-i JPMCUESHEET REFERENCE USE Attachment 5Blender Manua Operation Calcubtion Sheet Sheet 2 of 4 OBTAIN the fdbin data:

rriai Tank Boron C = PPM ConcentraUon

[riitial Tank Volume 1 V = GAL Bone Acid Tank Boron CEAT =

Concentration Fna Tank Vakime GAL Fnal Tank Boron C PPM Concentration I CALCULATE volume of the blended fluid to be added:

2 V = V 1 V = GAL GAL CALCULATE the requred blended flow concentration by inserting the appropbote values from above:

= PPM 2

C PPM NOTE Blended flows at high boron concentrations require lower tofrl makeup flow as indicated in Attactirnent 7.

4 Using the reruked blended flow concentration (C ) and the Bone Acid Tank boron 2

concentration (Cu-), SEtECT an appropnate total makeup flow rate (0) from Attachment 7.

Verify

[ OP 0701 Rev 18 age 10401123 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 20 of 31 Form ES-C-i

- JPMCUESI4EET -

REFERENCE USE Attachment 5 Blender Mnul Oper*tion Clcubtion Sheet S beet 3 of 4 CALCULATE the requred boric acid ftowrate:

X = 6orc Acid Powite = (3PM (C *T X E3cr[t Acid F!owrate GPM I

Verify

, IF the calculated Boric Acid flow rate (X) is greater than 30 gpm, THEN RECALCULATE using a ovr rotal makeup flow rate O).

CALCULATE total olurne of boric acid. (X is equal to bonc acid flowate)

Volume of Boric Acid = GAL Volume of oric Acd GAL C_______

Verify NOTE: The E3oric Acid Flow Controller has a 10 turn potentiometer and controls linearly om0to50gpm,

7. CALCULATE the requird controller selpoint per the following equation:

]çJpn1 ÷ Sgpmilum = - turns gpm ÷ 5 gpnvturn turns Verify OP- 10701 Rev. 18 Page 105 of 123 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 21 of 31 Form ES-C-i

. JPMCUE SKEET REFERENCE USE Attachment 5 Blender Manual Operation Calculation Sheet Sheet 4 of 4 NOTE: The RWMU Flow controiter has a 10 turn potentiometer and contros ;inead from Oo lBUgpm,

8. CALCULATE the required controller 3etpoir4 per the foliowing equation:

(0) gpm 16 gprnitwn turns gprn 16 gpm/turri Wrns Veri OP-i070l Rev, 18 Page 106 c 123 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 22 of 31 Form ES-C-i PCUESKEET . .

0 0

0 0

0 t 0

0 0

0 Q 0 0 0 0 c 0 0 0 0

0 0

c 0 c 0

0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 Ifl 0 fl 0 U) c, b 0 g W) çq c -

2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 23 of 31 Form ES-C-i

. JPM CUE SKEET REFERENCE USE Attachment 7 Makeup Concentration Limits Sheet 1 of 9 These tables were derived per calculation HNP-IIINST- 1056 using the equations of Attachment I and provide a means to select an appropriate RWMU Total Makeup Flow Rate (Q) which will yield a desired blended flow boron concentration when matched to the BAT concentration and the Boric Acid Flow Rate span of I to 30 gpm.

It is necessary to select lower RWMU Total Makeup Flow Rates when high boron concentrations are required because the Boric Acid Flow is limited by system configuration to a maximum of 33 gpm. This maximum Boric Acid Flow capability however is not used as the basis for these tables because it is necessary to allow some margin for possible system performance degradation.

Therefore a maximum Boric Acid Flow of 30 gpm is used as the basis for the following tables.

Each sheet of the tables is applicable to a specific RWMU Total Makeup Flow Rate (Q.

The maximum ppm results have been rounded down to the nearest whole number and the mnirnum ppm results have been rounded up to the nearest whole number.

OP-i0701 Rev 13 Page 109 of 123 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 24 of 31 Form ES-C-i JPM CUE SHEET REFERENCE USE Attachment 7 Makeup Concentration Limits Sheet 2 a19 RWMU Total Makeup Fiow Rate 0= 12Ogpm To determine the maximum boron concentration for v4ich makeup will be reliable at 20 gpm total tow, select the BAT boron concentration that iS equal to or bver than current BAT boron concentration, 2, To determine the minimum boicn concentration for *ich makeup w be reable at 120 gcim tota row, select the BAT boron concentrmion vich is equal to or higher than current BAT boron conceniratton.

AT BORON MA)(IMUM PPM FOR 120 MINIMUM PPfA FOR 120 CONCENTRATION GPM MAKEUP CPM MAKEUP PPM) (30 GPrvl BA FLOW l GPM BA FLOW) 7000 1750 59 70 1762 59 7100 1775 60 7150 1787 60 7200 1800 60 7250 18*1 61 7300 1825 61 1837 62 7350 7300 1850 62 7450 1862 .53 7500 1875 53 7550 1887 83 7(300 1900 64 7650 1912 64 7700 1925 65 7750 1937 65 OP-1070I Rev. 18 Page_110 of 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 25 of 31 Form ES-C-i JPM CUE SKEET REFERENCE USE Attachment 7 Makeup Concentration Limits Sheet 3 of 9 To determine the maximum boron concentration for which makeup will be reabIe at ItO gprn total tlow, select the BAT boron concentration that is equal to or lower than current BAT boron con cntration,

2. To determine the minimum boron concentration for which makeup will be reliable at 10 cipm total tow. select the BAT boron concentration whch s eaual to or higher than current BAT boron concentration.

BAT BORON MAX1MUM PPM FOR 110 MINIMUM PPM FOR 110 CONCENTRATiON GPM MAkEUP CPM MAkEUP (30 GPT1 BA FLOW) (I GPM BA FLOW) 7000 1909 7050 1922 65 7100 1936 65 7160 1950 66 7200 1963 66 7250 1977 66 7300 1990 67 j 7350 2004 67 7.l0O 2018 7150 2031 68 7500 2045 69 7550 2059 69 7600 2072 70 7650 2086 70 7700 2100 70 7750 2113 71 CP10701 Rev. 18 Page 111 of 121 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 26 of 31 Form ES-C-i IPFvICUE SKEET REFERENCE USE attachment? Makeup Concentration Limits Sheet 4 of S RWMU ToiaI Makeup Fk Rate 0= 100 To determine the maximum boron concentration for which makeup will be reliabte at 100 Qpm total flow, select the BAT boron concentration that is equal to or inwer than current BAT boron concentration.

2. To determine the minimum boron concentr3tion for which ivakeun ilI be reIiabe at iOO gpm total flow, select the BAT boron concentration which is equal to or higher than current BAT boron concentration.

3AT SORON MAXIMUM PPM FOR 100 MINIMUM PPM FOR 100 CONCENTRATION GPM MAKEUP GPM MAKEUP (PPM) (30 GPM BA FLOW) I

( GPM BA FLOW) 7000 2100 70 7050 2115 71 7100 2130 71 7150 2145 72 7200 2160 72 7250 2175 73 2190 7350 2205 71 7400 2220 4

° 225 7500 2250 75 7550 2265 7%

7600 2280 76 7650 2295 77 2310 77 7750 2325 78 0R107.01 Rev. 18 Pane ll2of 1231 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 27 of 31 Form ES-C-i JPMCUE.SHEET REFERENCE USE Attachment 7 Makeup Concentiation Limits Sheet 5 of 9

1. To deterrrine the maximum borçn concentration for which makeup will be reliable at 90 gpm total row, select the BAT boron concentration that s equal to or lower than current BAT baron concentration.
2. T detrrrie th irinimum boron concentration for which makeup will be riable at 90 gpm total 1ow, select the BAT boron concentration which is equal to or higher than current BAT boron concentration BAT BORON $AXlMUM PPM FOR 90 MINIMUM PPM FCR 90 CONCENTRATION OPM MAKEUP GPM MAKEUP i.PPM (30 GPM BA FLOW) (1 GPM BA ROW) 7C4J0 2333 Th 7050 2350 79 7100 2366 79 7150 2383 80 7200 2400 80 7250 2416 91 7300 2433 32 7350 2450 82 7400 2466 93 7450 2483 93 7500 2500 84 7550 2516 84 7500 2533 35 7650 2550 35 7700 2566 86 77.50 2583 87

[oPio7o1 Rev, 18 Page 113 of 1 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 28 of 31 Form ES-C-i

. JPMCUESI-IEET REFERENCE USE Attachment T Makeup Concentaton Limits Sheet 6of9 RVi1iAU Total Makeu Pow Rate 0 80gpm To detecmiiie the maximum boron concentration f& ihich makeup will be r&iable at 80 gpm total flow, select the BAT boron concentration that is equal to or ower than current AT boron concentration.

2. To detemine the mnimum boron concentration for which makeup will be reliable at 80 gpm total flow, select the BAT boron concentration which is equal to or higher than current BAT boron concentration SAT BORON M0MUM PPM FOR 80 MINIMUM PPM FOR 80 CONCENTRATION GPM MAKEUP GPM MAKEUP PPM) (30 GPM BA FLOW) (1 GPM BA FLOW) 7000 2625 88 7050 2643 39 7100 2662 89 7150 2681 90 7200 2700 90 7250 2718 91 7304) 2737 92 7350 2756 92 7404) 2775 93 7450 2793 94 7604) 2a12 9$

7550 2831 95 7600 2850 95 7650 2868 96 7700 2887 97 7750 2906 97 OP1070i Revi8 I Page il4of 1231 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 29 of 31 Form ES-C-i

, JPMCUESKEET REFERENCE USE Attachnient 7 Makeup Concentration Umts Sheet 7 of 9 RWMU Total Makeup Fow Rate 0 ifkjpm To detennine the maxivtm boron concentration or which makeup wdl be re[Lb1e at 70 gpm tctai flow, seect the BAT boron concentration that s equal to or ower than current BAT boron concentration.

2. To cfetermine the nnimurn boron concentration for which ivakeup will be rekale at 70 gprn total flow, seect the BAT boron concentration which is equal to or higher than current BAT boron concernration BAT BORON MAXIMUM PPM FOR 70 MiNIMUM PPM FOR 70 CONCENTRATION GPM MAKEUP (3PM MAKEUP (PPM) 30 (3PM BA FLOW) i (3PM BA FLOW) 7000 3000 100 7050 3021 101 7100 3042 102 7150 3064 103 7200 3085 103 7250 3107 104 7300 3128 105 7350 3150 105 7400 3171 106 7350 3192 107 7500 3214 108 -

750 .3236 ioa 7600 3257 109 7650 3278 110 1700 3300 1 10 7750 3321 Ill

[cP1o701 v 18 Page1l5ofi23 2012 NRC Admin Exam JPM ROISRO Al-i Rev. 1

Appendix C Page 30 of 31 Form ES-C-i V - dPM CUE SHEET -

REFERENCE USE AttacFumrnt 7 Makeup Concentration limits Sheet 8 of 9 To detemine the maximum boron concentration for wtEh makeup vl1 be reliable at

&) cpm total ficw,i, e!ct the BAT boron concentrabon that is equal to or lower than current BAT boron conceniraton, 2 To determine the minimum boron concentration for .vhich makeup i1I be reliable at 50 gpntotai tto, s&ect the BAT boron concenEraton tich s equal to or higher than current BAT boron concentration, AT BORQ4 MAXIMUM PPM FORGO MINIMUM PPM FOR 60 CONCENTRATTON (3PM MAKEUP (3PM MAKEUP

PPM) 30 GPM BA FLOW) I (3PM BA FLOW) 7000 3500 117 7050 3525 118 7100 3550 119 V V V 120 7200 :3600 120 7250 3625 121 V 7300 *V 7350 3675 123 7400 3700 124 7450 3725 125 7500 3750 125 V

7550 3775 126 7600 3800 127 7650 3825 128 7700 V V 3850 129 V V 130 OPi070i Rev 18 Prige Ll6of 1231 2012 NRC Admin Exam JPM ROISRO Al-i Rev. 1

Appendix C Page 31 of 31 Form ES-C-i JDM QLj SHT REFERENCE USE Attachment 7 Makeup Concentration Limits Sheet 9 of 9 To determine the maximum boron concentration for which makeup will be reliable at 50 gprn total flow, seleot the BAT boron concentration that is equal to or lower thaii current BAT boron concentration.

2. To determine the minimum boron concentration for which malceup will be reliable at 50 corn total flow, s&ect the BAT boron concentration which s equal to or higher than current BAT boron concentraton.

BAT 3QRQN MAXIMUM PPM FOR 50 MINIMUM PPM FOR 50 CONCENTRATION GPM MAKEUP GPM MAI<EUP PPM) (30 GPM BA FLOW) (1 GPM EA Fl_OW) 7000 4200 140 7050 4230 141 7100 260 142 7150 4290 143 7200 4320 144 7250 4350 145 7300 4380 146 7350 $10 147 7400 4440 7450 4470 149 7500 i500 150 7550 $53Q 151

7600 560 152 7650 4590 153 7700 4620 154 7750 4650 155 OPi070 Rv 18 Pge li7of 1231 2012 NRC Admin Exam JPM RO/SRO Al-i Rev. 1

Appendix C Page 1 of ii Form ES-C-i WORKSHEET INFORMATION-Facility: Shearon Harris Task No.: 301 1 35H601 Task

Title:

Determine Subcoolinci with the JPM No.: 2012 NRC Exam Subcoolinci Margin Monitor Admin JPM RO/SRO Ai-2 Unavailable K/A

Reference:

G 2.1.23 RO 4.3 SRO 4.4 Alternate path: No Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

. A Small Break LOCA has occurred

  • SI is actuated
  • PATH-i is in progress
  • Containment pressure is 3.9 psig and slowly increasing
  • All RCPs are running

. The Subcooling Margin Monitor is not available

. The hottest CET is reading 558°F

. ERFIS Pt. TRC9300 is not available

. Loop Thots are reading as follows:

Initial Conditions: T14i3 = 552°F o Tl-423=55i°F o Tl-433=553°F

. ERFIS Point PRC9455L has failed

  • Pressurizer Pressure Channels are reading as follows:

o P1-457 = 1730 psig o P1-456 = 1710 psig o Pl-455=i72opsig

. RCS Wide Range Pressure Channels are reading as follows:

o P1-402 = 1680 psig o__P1-403_=_1690_psig The CRS has directed you to determine and report the Subcooling Intiatin I g Cue margin. Show your work in the box provided.

2012 NRC Admin Exam JPM RO / SRO Ai-2 Rev. 1

Appendix C Page 2 of 11 Form ES-C-i

- WORKSHEET INFORMATION-Task Standard: Correct indications utilized and Subcooling margin determined within specified range.

Required Materials:

  • Calculator
  • Steam Tables General

References:

EOP USERS GUIDE Rev. 36 Handouts:

  • EOP USERS GUIDE, Table of Contents
  • EOP USERS GUIDE, Section 6.2 pages 31 and 32 Time Critical Task: No Validation Time: 10 minutes Critical Task Justification Must choose correct temperature to use based on provided plant Step 2 conditions. IF the wrong temperature is selected all calculations will be incorrect.

IF Containment pressure is not identified as ADVERSE then all Step 3 calculations will be using the normal Containment values and the calculations will be incorrect.

IF the saturation temperature were incorrectly calculated the final Ste p 4 calculation will be incorrect.

Final Subcooling calculation is what the candidates task was. If the Step 5 reported values are incorrect the CRS may make incorrect choices with procedure steps based on the value given.

2012 NRC Admin Exam JPM RO / SRO A1-2 Rev. 1

Appendix C Page 3 of 11 Form ES-C-i

- -ERFORMANGE INFORMATION Start Time:

Performance Step: 1 Refers to EOP Users Guide.

Comment: The candidate is not required to complete the task in discrete steps. Guidance for performing the task is provided in the EOP USERs GUIDE but procedure steps are not specified. The specified parameters must be selected for the subcooling calculation to be correct.

q Performance Step: 2 Evaluate plant conditions:

  • RCS temperature Standard: EOP Users Guide Section 6.2 Step 1 IF the Core exit TC reading on SPDS is not available then the Highest core exit TC reading from the Inadequate Core Cooling Monitor (ICCM) should be used:

Determines the hottest CET reading is the preference and chooses:

  • 558°F Comment:

V - Denotes Critical Steps 2012 NRC Admin Exam JPM P0 i SRO Ai-2 Rev. 1

Appendix C Page 4 of 11 Form ES-C-i PERFORMANCE INFORMATION -

J Performance Step: 3 Evaluate plant conditions:

  • RCS Pressure Standard: EOP Users Guide Section 6.2 Step 2 Primary pressure is obtained using the lowest of the two RCS wide-range pressure indications P1-402.1 or P1-403 when PRZ pressure is off scale low or adverse CNMT conditions exist (given CNMT pressure of 3.9 psig indicates adverse conditions)

Determines containment conditions are adverse:

  • PI-402=1680P51G Comment:

q Performance Step: 4 Determine saturation temperature.

Standard: Convert to PSIA: 1680 + 15 = 1695 PSIA Interpolates between 1660 and 1700 PSIA and determines saturation temperature to be 610°F but 611°F:

  • [35/40(613.189 609.934)] = 3.255 o 609.934 + 3.255 = 612.782°F
  • ?612°F 613°F Comment: Candidate can use the Steam Tables.

Performance Step: 5 Determine subcooling.

Standard: Calculates and reports subcooling to be 52°F but 53°F

  • 61 2.782°F 558°F = 54.782°
  • >52°F <53°F Comment:

V - Denotes Critical Steps 2012 NRC Admin Exam JPM RO / SRO A1-2 Rev. 1

Appendix C Page 5 of ii Form ES-C-i PERFORMANCE INFORMATION After the candidate has reported the calculated Subcooling Terminating Cue: margin:

Evaluation on this JPM is complete.

Stop Time:

V - Denotes Critical Steps 2012 NRC Admin Exam JPM RO I SRO A1-2 Rev. 1

Appendix C Page 6 of 11 Form ES-C-i VERIF+CATIONOFCOMPLETION -

Job Performance Measure No.: 2012 NRC Admin Exam JPM RO / SRO Ai-2 Determine Subcooling with the Subcooling Margin Monitor U navai able EOP Users Guide, Section 6.2, Subcooling Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2012 NRC Admin Exam JPM RO / SRO Ai-2 Rev. 1

Appendix C Page 7 of ii Form ES-C-i

  • JPMCUESKEET Name:

Date:

. A Small Break LOCA has occurred

. SI is actuated

. PATH-i is in progress

. Containment pressure is 3.9 psig and slowly increasing

. All RCPs are running

. The Subcooling Margin Monitor is not available

. The hottest CET is reading 558°F

. ERFIS Pt. TRC9300 is not available

. Loop Thots are reading as follows:

o Tl-413=552°F Initial Conditions: 0 Tl-423 = 551 °F 0 Tl-433=553°F

. ERFIS Point PRC9455L has failed

. Pressurizer Pressure Channels are reading as follows:

0 P1-457 = 1730 psig 0 P1-456 = 1710 psig 0 P1-455 = 1720 psig

. RCS Wide Range Pressure Channels are reading as follows:

0 Pl-402=i68Opsig 0 P1-403 = 1690 psig The CRS has directed you to determine and report the Subcooling Infain i I I g ue margin. (Show work below) 2012 NRC Admin Exam JPM RO I SRO A1-2 Rev. 1

Appendix C Page 8 of 1 1 Form ES-C-i JPM CUE-SHEET I

HARRIS uCI.EAR PLAKT PLANT OP5ATiNG PW1U 1OLUME 3 PART 4 POcDURE rfP EMERGENCY cWRAT1NG PCEOURE (EOF)

NUMBER:

S GUIDE t

EOP-USER Tfl1E USERS GUIDE EOP-USERS GUIDE R. 36 Pe I of87 2012 NRC Admin Exam JPM RO / SRO Ai-2 Rev. 1

Appendix C Page 9 of ii Form ES-C-i JPM CUE SHEET -

E T4 a Ctn eUar Tifle 1JJ Parp4e 4 2.a e7ences .3 3.a Re(Iffle a 4jj 51 Car Ra Usage ot EQP Nett ia 2 Con Ua9 of St Trees 2 Cor FOGTI L*g t , FOIL .fld FRPS Gen cmab

&1 r,und and 51s nzr EOP eat .31 53 Cubco 31 6.) Rew1rn 3L A JhW r4o41 32 54 3eAeiIcer Oper 33 6.5 1e PrsEwWrc+/-wperire 33 6.5 Feirnent of Pant qLe1t Fiq St Tena11c 33 7 OefV$OM of Cf*L dt 34

6. CS W Fig ressun iabom 34 6.5 Da Steam at axIm Rate 35 5iO Cc of RLØMed Steam Geierater LeeI 36 H UNDML .17 6.12 PATh GLlO 31 6.13 33

&8 F 1rmtfufne1 and Plant Conuter 35 6 of PRZ DIng Osz 6.iEi UfCNCCSlnvy 41 6.17 Sftitt1alkn 42 6.1 TDA?W Fuiy2 Speed cider Setpt 42

6. 3 Te spec *n ami* 4.3 6.2 Deiuiing FCS pec and C1 4.3 6.21 Uaflg Core Et TC bc etemflne aquate Core Coaling CondIes 44 6.22 CcuInq tee Pant Cpe!rh StaIr 44 flAWfl $5 6.2 CP Alteill4te 1l V $5 635 Sareg1d Vaon Dr FP 1emenn 37 6.25 FecaUi of RCP Cociq and FCP Res&ait 6.27 Ue of BMk SGT t4rI9 ATW 43

&2e RCP at romg 43 625 Loss at 51 FRiu tndIaatki 55 6.30 Cogenc1es Terrnci of St F 51 6.31 Tr wter . Qtc Pt1i

.)2 CraIion of tne Vi5 Staht a1te 6.33 Pote5ai G 1n#re52n ir tee CSIP Sual1an 6.34 TrUi le Sewre Mcicter Mnaoment Guanee 55 i5 1nrndt13 L*1 Qurq ATW 2012 NRC Admin Exam JPM RO / SRO Ai-2 Rev. 1

Appendix C Page 10 of 1 1 Form ES-C-i JPMCUEHEET USEWS GUIDE

& GENERAL INFORMATtON

&1 5actrcind and EaIs fir EOP Nt*o Cr1ng the eicatn and vaIat)aa of ne EOP netwrt, ard durq Operator strTuIatc1 iraIr many queEIns e frequently -aseti cncemIng the EOP netwcrL The bacKground and basis for the SHNPP EOP nerK Is ounti In deaD In the acIcground dccunients of the WOG EGs anti the EOP Slep DeilatIcn Oocwner4& me fdllowlflg secilonE oor ciartflcabon viaertaffl praceiliraf requIrements that are freqtremtly queBilorled by the perathr&.

52 CS Subcoolmg The ERFIS pfanL oonpfJter functan as the pL3rlt subccolKig ncnthr. RCS uteecrg wi normally be cbtaed from the tap Iee1 SalPAy Parner DlspLy System 4SP0S) screen

{Tumn-Orl-cade: SPTOP, Pweer SU5GOOL tDEGFT, ERFIS point TRCS8D). T for eiiie reason Ihe subaoafing monitar Is not avabre, the aperatoms &Ifl mnanuaty detennlne subcoalln usIr one ci the fallowing Refrce 2.2.22c

  • Suboig Mari Cab Prvçram - Version tG
  • Steam T1es SubcooWig aies are generally F4resenied In the fcfowlng fonnat:

1O F i4 Fl C-2O F 1E Fl M-The top set or values ts normally used when the subcoollrt monitor Is aiallable (destgnated by C).

The boithm set of numbers is used only when the subcoalln mnonftcr Is not avab(e (designated byM for manual). The sub000mg vaKies used In the procedure were determined based xi specIl1 isunefTt 1accuTacle& Sbaid It be necessary manuay deterniie 6)cQO the foawInq nvenons apply:

1 Primary teruperalure Is abtaied .usln one ci the To*wmg based on aalIabWy of the Indbadorls (listed In order ci preference)r

  • core etit TC reaig on SF05 (Th n-cctie SPTOP, Paraniet 9 EXIT fDEGF, EftEispolat TRC93O). Thisreadhig Isthe aver eaftheehottestcoro exltTcsand Is tile IrWut used f the Sihcorr Mchltoi..
  • Highest come exItTCreadInrcm the InadeiaIe Care Cooling Monitor (ICCM).
  • Highest actte op 1e range T-hc( {Tl-41 3, 423, 433}. An aciie loop Is defhied as one that has forced or natural ccuIadan flow. If any RCPs are niinnig, all kiaps wtJ be aciNe bacaw is aiaIIable In loops where RCPs are not runrtInq. A classb expIe ala non-active loop waud be a loop that bas a SGTR since It is batated and natural cculan w In this loop would not be avtati(e.

(continued an next page)

ECP4JSERS GUIDE Re!,. I Page 31 of 7 2012 NRC Admin Exam JPM RO / SRO A1-2 Rev. 1

Appendix C Page ii of 1 1 Form ES-C-i JPM CUE-SHEET USEWS GU E 2 RCS S bc4Iq 11kd)

I P!1mry puie IE Xa1ned iiçj one at e ftaowig *a&el cn th rie n4 aaat) c PZ p*e Id1a:

f tS I n SPDS ic* S7OP.

P3rawqer PRZ PRES (PS1G, ERFJS poht P 455L) ITPRZ pcee is aba i7 PIG, rd ltt 1fl ktw* if P142 n iPT-47, PT4, PT-4%5 IF P14Z pre l bew 1700 PIG. thIs adm I w the 1i F4CS wfr rg PT4Q2 ERFS pi4 PRdO2) PT-4O ERIS pc*it PRC4O

  • 1 PRZ sire 1700 PSt CI4hIT nrrnaI. m kw P142 h b 4PI-47, P-4S, r PM. I )
  • f RZ Eir oft ct adee MT onm . I_t of the two RCS we-iar pressure PI-iü2i cr P1-4i OnLy PT-442 awl PT-4L13 ciEc ln cai otIL xw1arief11 WIen CS ei an 700 PSQ, Pi4I2A bf PM2A ree;

!rçut fm qualIfle Inne PT-402 d Its nrz scale p avkes a more prece IraitI at priwe.

seiIir .L Pn A, PIie , 1W IoLn In mtev 1, P1aA. Pfl 5. awl FW faI are retut prr ie that epuns Icted by these grial& There av be ces; Thoeer, ten the OP cIIre m uLaQ1 of campaneits id te re rort t!as riot been ceoted In be reset Ic This case Is vnssle lo res the assuaed rwevet. the of M5 Ofl suR be of eIiI, ree at SI ar1 PIlaie A may reExg Ixqt* se8cTh aerad prY1ectkIn cr I1mqwe vaIve that r asttIa cn SI b rpo1a1 ) e *q recofaL hi e the cC the 1Uir ates stmIlmt be evatuaI p In reseg the sI. N*t that se RM ie reaI wbeil SI Is reei4 ai the eiit*ri portkm at SI v caUi ataairrit of C*IM-004 13c*II b cacipIsted YerWed usZn the pLt camputer prt reset1g SI OPRSGUiDE 2012 NRC Admin Exam JPM RO I SRO A1-2 Rev. 1

Appendix C Job Performance Measure Form ES-C-i

- Worksheet Facility: Shearon Harris Task No.:

Task

Title:

Determine the arroval JPM No.: 2012 NRC Exam Admin reQuirements and stay time limit for JPM RO / SRO A3 workinci in a Locked Hicjh Radiation Area.

K/A

Reference:

G 2.3.4 RO 3.2 / SRO 3.7 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinci:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

. The plant is operating at 100% power

. A Letdown line leak has occurred Initial Conditions:

  • Your accumulated TEDE dose for this year is 1640 mR.

You have been assigned to operate the valve inside the LHRA.

Determine the minimum HP coverage and your maximum stay time to Initiating Cue: comply with the RWP. Assume that the radiation level meets the minimum requirements for LHRA classification, no dose is received in transit, and no dose extension will be granted.

2012 NRC Exam Admin JPM RO / SRO A3 Rev 1

Appendix C Job Performance Measure Form ES-C-i

- Worksheet Task Standard: Approval requirements and TEDE limit calculation correct.

Required Materials: Calculator General

References:

  • AP-504, ADMINISTRATIVE CONTROL OF LOCKED &

RESTRICTED HIGH RADIATION AREAS, Rev. 31

  • HPS-NGGC-0003, RADIOLOGICAL POSTING, LABELING AND SURVEYS, Rev. 15 Handouts:
  • An EXAMINATION ONLY RWP written for this task with the ED DOSE Alarm setting listed as 200 mR.

Time Critical Task: NO Validation Time: 20 minutes Critical Task Justification Must choose correct HP coverage. IF the wrong HP coverage is Step 1 determined an inadvertent high radiation dose could be obtained by the individual.

Must determine what the accumulated dose alarm is in order to monitor St ep 2 when the total dose approaches the alarm setting.

Must accurately determine the maximum stay time in order to determine Step 3 how long work can be performed without exceeding the limits of the RW P.

2012 NRC Exam Admin JPM RO / SRO A3 Rev 1

Appendix C Page 3 of 8 Form ES-C-i

-- PERFORMANCE [NFORMATION (Denote Critical Steps with a q)

Start Time:

.J Performance Step: 1 Determine LHRA entry requirements. (RWP or AP-504)

Standard:

  • Continuous HP coverage [RWP, p. 2]

Comment:

q Performance Step: 2 Determine first administrative limit.

Standard: Determines accumulated dose alarm (ED DOSE ALARM) for this RWP is set at 200 mrem.

Evaluator Note: Accumulated dose alarm requires exiting the area.

(RWP, pg. 2).

Comment:

q Performance Step: 3 Calculate maximum stay time before exit is required.

Standard: (200 mR/i 000 mR)(60) = 12 minutes.

Comment:

Terminating Cue: After stay time has been calculated: Evaluation on this JPM is complete.

STOP Time:

V - Denotes a Critical Step 2012 NRC Exam Admin JPM RO / SRO A3 Rev 1

Appendix C Page 4 of 8 Form ES-C-i

- VERFICAT1ON OF COMPLETION Job Performance Measure No.: 2012 NRC Exam Admin JPM SRO A3 Determine the approval requirements and stay time limit for working in a Locked High Radiation Area.

Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2012 NRC Exam Admin JPM RO / SRO A3 Rev 1

Appendix C Page 5 of 8 Form ES-C-i JPMCUESHEET

. The plant is operating at 100% power

. A Letdown line leak has occurred Initial Conditions: . .

. A valve located inside a Locked High Radiation Area (LHRA) must be SHUT

. Your accumulated TEDE dose for this year is 1640 mR.

You have been assigned to operate the valve inside the LHRA. Determine the minimum HP coverage and your

.. maximum stay time to comply with the RWP. Assume that Initiating Cue:

the radiation level meets the minimum requirements for LHRA classification, no dose is received in transit, and no dose extension will be granted.

Name Date The minimum HP coverage is:

The maximum stay time to comply with the RWP is:

2012 NRC Exam Admin JPM RO I SRO A3 Rev 1

Appendix C Page 6 of 8 Form ES-C-i V

JPMCUESHEEI V

  • 012871300201*

RADIATION WORK PERMIT REPORT ID TIPH900 RWP Nwn.ber: 00006258 00 ALARA Task Page  : 1 Facility  : HNP 01715478 01 01 RWP Title  : OPERATIONS WORK ACTIVITIES Type  : MR Status : ACTIVE Date  : TODAY 00:00 Area  : GENERAL FACILITY Location Work Begin Date: TODAY 00:00 Work End Date  : Tomorrow 23:59 Extention Date : By Initiated Date : YESTERDAY 03:18 By : KIVETP CHRISTENSEN CHRIS Approved Date  : YESTERDAY 03:18 By : TYSINB TYSINGER BRENDA ALARA TASK ALARA Task  : 01287131 02 01 Status: READY TO WORK ALARA Desc  : O,TR, ISOLATE LEAK IN LETDOWN Radiological Conditions ED Time Alarm: 900 (in minutes)

Administrative Dose Limit: 600( mrem)

ED DOSE ALARM: 200 (mrem) ED Dose Rate Alarm: 1500 (mrem/hr)

Radi ol ogi cal Hazards Radiological Hazard I--Distance--I I Reading I SEE SPECIAL INSTRUCT N/A N/A N/A Radiation Protection Requirements Dosimetry Type : S STANDARD (DRD/TLD)

Multi-Pack Type:

Type Code Description SPCL SPCL SEE SPECIAL INSTRUCTIONS 2012 NRC Exam Admin JPM RO I SRO A3 Rev 1

Appendix C Page 7 of 8 Form ES-C-i

. JPM CUE SHEET -

PASSPORT - TOTAL EXPOSURE SYSTEM

  • 012871300201*

RADIATION WORK PERMIT REPORT ID TIPH900 RWP Number: 00006258 00 ALARA Task Page  : 2 Facility  : HNP 01715478 01 01 Hold Points and Special Instructions 30 HOT PARTICLE AREAS (HPA) 30 WORK AREAS GREATER THAN 1000 MREM/HR Nbr Special Instructions 10 ************

WORK DESCRIPTION*************

10 ROUNTINE OPERATIONS ACTIVITIES 10 10 1.REVIEW AREA SURVEY MAPS AND/OR CONTACT RADIATION 10 PROTECTION FOR SPECIFIC WORK AREA RADIOLOGICAL 10 CONDITIONS PRIOR TO START OF WORK.

10 2.IF RADIOLOGICAL CONDITIONS ARE SIGNIFICANTLY HIGHER 10 THAN CURRENT SURVEYS OR HISTORICAL SURVEY DATA 10 THEN WORK IS NOT ALLOWED TO CONTINUE ON THIS RWP 10 WITHOUT APPROVAL FROM RP SUPERVISION.

10 3.NOTIFY RADIATION PROTECTION PRIOR TO CLIMBING IN THE OVERHEAD.

10 4.FOR HIGH NOISE AREAS EVALUATE THE USE OF THE FOLLOWING:

10 - LED LIGHT 10 - TELEMETRY 10 5.IF ACCUMULATED DOSE ALARM OR UNANTICIPATED DOSE RATE ALARM SOUNDS, 10 LEAVE THE AREA AND CONTACT RADIATION PROTECTION.

10 6.INTERMITTENT RP COVERAGE, UNLESS OTHERWISE INSTRUCTED 10 7.ENGINEERING CONTROLS MAY BE REQUIRED BASED ON 10 RADIOLOGICAL CONDITIONS.

20 ********LOCKED HIGH RADIATION AREA ENTRIES*****

20 20 1.PRE-JOB BRIEFING REQUIRED.

20 2.RP SUPERVISOR APPROVAL REQUIRED PRIOR TO ENTRY.

20 3.CONTINUOUS RADIATION PROTECTION COVERAGE REQUIRED 20 4.WHEN PROVIDING CONTINUOUS COVERAGE, RP PERSONNEL 20 SHALL NOT ENGAGE IN ANY ACTIVITIES WHICH COULD 20 DISTRACT THEM FROM MONITORING THE WORKERS AND THE 20 WORK ENVIRONMENT.

40 CONTAMINATED SYSTEM BREACH (LINES > 1 INCH) ***

40 40 1.CONTINUOUS RP COVERAGE REQUIRED FOR INITIAL 40 SYSTEM BREACH.

40 2.FULL PROTECTIVE CLOTHING (TYPE W) W/HOOD 40 REQUIRED FOR WET WORK.

40 3.GLOVES AND A CONTAINMENT DEVICE ARE REQUIRED AS A 40 MINIMUM IN CLEAN AREAS.

40 4.PROVIDE PATH OR CONTAINMENT FOR SYSTEM DRAINAGE, 40 IF NEEDED TO CONTAIN LIQUIDS.

40 2012 NRC Exam Admin JPM RO / SRO A3 Rev 1

Appendix C Page 8 of 8 Form ES-C-i JPMCUESI-IEET PAS SPORT - TOTAL EXPOSURE SYSTEM RADIATION WORK PERNIT

  • 012871300201*

REPORT ID : TIPH900 RWP Number: 00006258 00 ALARA Task Page  : 3 Facility  : HNP 01715478 01 01 Hold Points and Special Instructions 60 ***********CONTANINATED AREA ENTRIES*************

60 60 1.GLOVES AND SHOECOVERS REQUIRED AS A MINIMUM 60 2.FULL PROTECTIVE CLOTHING AND HOOD (TYPE D) REQUIRED 60 FOR CLIMBING IN OVERHEAD ABOVE 8 FEET AND/OR 60 CRAWLING.

60 3.FULL PROTECTIVE CLOTHING (TYPE D) REQUIRED FOR HANDS 60 ON WORK.

60 4.DOUBLE SURGEONS GLOVES MAY BE SUBSTITUTED FOR 60 RUBBER GLOVES WITH RADIATION PROTECTION APPROVAL.

60 5.FULL PROTECTIVE CLOTHING (TYPE W) WITH HOOD REQUIRED 60 FOR WET WORK.

60 2012 NRC Exam Admin JPM RO / SRO A3 Rev 1

Appendix C Job Performance Measure Form ES-C-i

.--w Facility: Shearon Harris Task No.: 015004H201 Task

Title:

Perform the Quadrant Power Tilt JPM No.: 2012 NRC Exam Ratio Surveillance Admin JPM SRO A2 K/A

Reference:

G2.2.12 RO 3.7 SRO 4.1 Alternate Path: No Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

. The plant has been stabilized at 75% power following a dropped rod in Control Bank B (M-6) while performing a plant startup.

Initial Conditions:

  • The crew is performing AOP-001, MALFUNCTION OF ROD CONTROL AND INDICATION SYSTEM.
  • There are NO deficiency tags on PRNIs.

The CRS has directed you to perform a manual QPTR lAW OST-1 039, CALCULATION OF QPTR. The Power Range NIS readings are provided in the table below.

Initiating Cue:

For the purposes of the examination, there will be no independent verification. Show values of your work.

2012 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Job Performance Measure Form ES-C-i

- Worksheet-Task Standard: Calculations within required band.

Correct Tech Spec actions are identified.

Required Materials: Calculator General

References:

OST-1039, CALCULATION OF QPTR, Revision 15 Technical Specifications Handouts:

  • OST-1039
  • Power Range NI Current and Voltage Set point Table
  • Technical Specifications Time Critical Task: No Validation Time: 15 minutes Critical Step Justification Must accurately determine the correct calculation based on collecting Step 11 and inputting either provided data or visual inspection data. The calculation will yield an unsatisfactory QPTR.

Must identify that the QPTR upper is outside the band which will make Ste I 14 this overall results unsatisfactory.

Must unsatisfactory that the QPTR is greater than 1.02 (which is a Tech Ste p 15 Spec limit).

Must correctly identify through documentation that the QPTR limits are Step 16 exceeded.

Must accurately identify associated Tech Specs with a QPTR that has Ste I 17 exceeded the limits specified in HNP Tech Specs.

2012 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 3 of 14 Form ES-C-i PERFORMANGE INFORMATION Start Time:

Performance Step: 1 Obtain procedure.

Standard: Reviews procedure.

Evaluator Cue: Provide OST-1 039.

Evaluator Note: A KEY is provided for your use on JPM prior to candidate pages.

Comment:

NOTE: The NI curve numbers provided in this JPM are Evaluator Note: numbers made specifically for use in this JPM they are NOT current plant values.

Precaution and Limitation 4.0.1 has guidance if performing this Procedure Note: OST with one Power Range Channel inoperable.

Performance Step: 2 Completes Prerequisites section:

  • Verify instrumentation needed for the performance of this test is free of deficiencies that affect instrument indication.
  • Verify the most recent Curve F-X-8 is used in the performance of this procedure. (Reference 2.1.1 and 2.1.2)
  • OBTAIN CRS permission to perform this OST.

Standard:

  • Logs F-X-8 revision number: 9
  • Initials/signs all blocks Comment:

V - Denotes Critical Steps 2012 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 4 of 14 Form ES-C-i PERFORMANCE INFORMATION Performance Step: 3

  • IF Quadrant Power Tilt Ratio Calculation Computer Program is used, THEN PERFORM the following:
  • MARK Step 7.0.2 N/A.
  • MARK Section 7.2 N/A.
  • PERFORM Section 7.1.
  • IF manual calculation of the Quadrant Power Tilt Ratio is used, THEN PERFORM the following:
  • MARK Section 7.1 N/A.
  • PERFORM Section 7.2.

Standard:

  • Marks Section 7.1 N/A
  • Proceeds to Section 7.2 Comment:

OST-i 039 Section 7.2 Note prior to step 1 Performance Step: 4 NOTE: The detector current meters on each power range channel drawer are designated as left-upper, right-lower.

Standard: Reads and circle slashes note Comment:

OST-i 039 Section 7.2, Step 1 Performance Step: 5 Prior to reading the value of detector current, VERIFY the meter range/rate switch is in the 400 iA/SLOW position.

Standard: Prior to reading the value of detector current, VERIFIES the Meter Range/Rate switch is in the 400 pA/SLOW position.

Evaluator Note: This information is on the JPM Cue Sheet Comment:

V - Denotes Critical Steps 2012 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 5 of 14 Form ES-C-i PERFORMANCE INFORMAT[ON OST-i 039 Section 7.2, Step 2 Performance Step: 6 RECORD on Attachment 2, in column A, the upper and lower detector currents from all operable power range channels as read on the Nuclear Instrumentation Cabinet.

Standard: Transposes readings from PRNIS Readings Table onto Attachment 2.

Comment:

OST-1039 Section 7.2, Step 3 J Performance Step: 7 RECORD on Attachment 2, in column B, the 100% power normalized current for each channel from Curve F-x-8.

Standard: Transposes TOP and BOTTOM 100% current values from the Curve Book provided.

Comment:

OST-1 039 Section 7.2, Note prior to Step 4 Performance Step: 8 NOTE: When recording all fractions and ratios, record to four decimal places, dropping the fifth and subsequent decimal places.

Standard: Reads and circle slashes note Comment:

OST-1 039 Section 7.2, Step 4 Performance Step: 9 Divide values in Column A by the respective normalized current in Column B and record the result in Column C as the Normalized Fraction.

Standard: Divides each Upper and Lower reading by the respective 100%

normalized current value and records in Column C.

Comment:

V Denotes Critical Steps

- 2012 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 6 of 14 Form ES-C-i PERFORMANCEINFORMATFON OST-1 039 Section 7.2, Step 5 Performance Step: 10 CALCULATE the average value for the upper and the lower Normalized Fractions as follows:

  • ADD the Normalized Fraction in each section of column C, recording the sum in the space provided.
  • DIVIDE the sum obtained in Step 7.2.5.a by the number of operable NI channels, recording the result in column D of Attachment 2.

Standard: Adds all Normalized Fractions for the same plane and records the sum in the space provided.

Divides by the sum by four and records result in Column D.

Comment:

OST-1039 Section 7.2, Step 6 J Performance Step: 11 Using the formula and values from Attachment 2, CALCULATE the Upper and Lower Ratios.

Standard:

  • Divides the Maximum Normalized Fraction by the Average Normalized Fraction on each plane.
  • Determines the UPPER ratio is 1 .02 The applicant may inform the CRS as soon as any Evaluator Note: calculation is> 1.02. If so, acknowledge and direct applicant to complete Attachment 2.

Comment:

OST-1 039 Section 7.2, Step 7 Performance Step: 12 PERFORM independent verification of all calculations made on Attachment2.

Standard: Requests Independent Verifier.

Evaluator Cue: If necessary, repeat Initiating Cue: For the purpose of this examination, there will be no independent verification of your work.

Comment: Candidate may choose to check calculations.

- Denotes Critical Steps 2012 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 7 of 14 Form ES-C-i

- PERFORMANCE INFORMATION OST-1039 Section 7.2, Note prior to Step 8 Performance Step: 13 NOTE: The upper ratio or the lower ratio, whichever is greater, is the quadrant power tilt ratio (QPTR).

Standard: Reads and circle slashes note Comment:

OST-1 039 Section 7.2, Step 8 q Performance Step: 14 RECORD QPTR:

Standard: Records QPTR value as 1.0400 to 1.0410 (N44 UPPER)

Identities Upper as outside the band Comment: Acceptable band is +1- 5% (rounded to .0005).

UPPER calculated band is 1.0400 to 1.0410 LOWER calculated band is 1.0155 to 1.0165 OST-1 039 Section 7.2, Step 9 1 Performance Step: 15 CHECK QPTR is less than or equal to 1.02.

Standard: Identities Upper QPTR as greater than 1.02 and QPTR is unacceptable Comment:

V - Denotes Critical Steps 2012 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 8 of 14 Form ES-C-i PERFORMANCE INFORMATION - -

OST-1 039 Section 7.3, Test Completion Step 1 J Performance Step: 16

  • IF this test was performed due to an inoperable QPTR alarm, THEN DOCUMENT completion of PMID 22125 RQ 01.
  • COMPLETE applicable sections of Attachment 3, Certifications and Reviews.
  • INFORM the CRS this test is completed.

Standard:

  • Check marks Periodic Surveillance or notes AOP-001 in Comments section
  • Plant Condition: 75% Power (may note dropped rod)
  • Mode 1
  • Todays Date
  • Current Time
  • OST Completed By: Applicants name
  • Initials/Name q
  • Indicate in General Comments Section and/or informs CRS that the limit is exceeded Evaluator Cue: Acknowledge any report.

If examinee identifies that QPTR is greater than 1.02, direct the examinee to identify:

(1) which Tech Spec is exceeded (2) the required action statements to be implemented (3) the time requirement associated with each applicable action statement.

Comment:

- Denotes Critical Steps 2012 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 9 of 14 Form ES-C-i

- PERFORMANCE INFORMATION -

J Performance Step: 17 Identify the Tech Spec LCOs that would be in effect.

Standard: Identifies that Tech Spec 3.2.4, Quadrant Power Tilt Ratio has been exceeded

  • Identifies the following ACTION statements to be implemented and the required time limitation (see page 1 1) o 3.2.4.a.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> o 3.2.4.a.2 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> o 3.2.4.a.3 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TS 3.2.4.a.4 is not required to be identified since no direction is Evaluator Note

. provided in the cue for increasing thermal power.

Comment:

After the CRS has been notified:

Terminating Cue:

Evaluation on this JPM is complete.

STOP Time:

V - Denotes Critical Steps 2012 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 10 of 14 Form ES-C-i

- PERFORMANCE INFORMATION KEY Record QPTR = 1.0405 Acceptable band is +1- 5% (rounded to .0005) 1.0400 to 1.0410 CHECK QPTR is less than or equal to 1.02 (circle) YES A B C D UPPER UPPER AVERAGE UPPER 100% POWER NORMALIZED UPPER UPPER DETECTOR NORMALIZED FRACTION NORMALIZED DETECTOR CURRENT CURRENT (NOTE 1) FRACTION 152.9 0.7567 N-41 115.7 172.7 0.7255 N-42 125.3 0.7543 193.0 0.7502 N-43 144.8 153.9 0.7849 N-44 120.8 SUM 3.01 73 Maximum Upper Normalized Fraction 0.7849 Upper Ratio = = 1 Q4Q5*

Average Upper Normalized Fraction 0.7543 Standard for this calculation is 1.0400 to 1.0410 A B C D LOWER LOWER AVERAGE LOWER 100% POWER NORMALIZED LOWER LOWER DETECTOR NORMALIZED FRACTION NORMALIZED DETECTOR CURRENT CURRENT (NOTE 1) FRACTION 174.1 0.7369 N-41 128.3 200.4 0.7544 N-42 151.2 0.7425 214.7 0.7494 N-43 160.9 187.9 0.7296 N-44 137.1 SUM 2.9703 Maximum Lower Normalized Fraction 0.7544 Lower Ratio = = 1.0160**

Average Lower Normalized Fraction 0.7425 Standard for this calculation is 1.0155 to 1.0165 V - Denotes Critical Steps 2012 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page ii of 14 Form ES-C-i PERFORMANCE INFORMATION-

!!!L RItCN LIt z QuA1 .p TILl ATT tT1 OP$ -

i .L 4 ma qUAORA$T .4R flit AfiO &aI I at ixet4 1. 3Z. -

ACAeILFr? OE 1, aava S of kTtO ThE 4M.

1 4.

L Eth the tJACRA$T ER fliT Afi z .xcwad L3Z but Tin than r aI t Ci1sIate the QUARAN7 P(WE TtLT ATt at lent oNCe r Sour

.LntU aith.r a) The 1L*ORA$t iER flLt ATT ri reduced ta ts H*it o t) ThAL PWER s to e:s tiin f AT! ThEAL a wiaTr ri e1ther a) the QUADRANT ER fliT )AflO ta i4thin ft$

Halt, or b) educ. 1lEMAL POWER it lent fr ATD ThEAL ?ER far aac iX of Indicated QUAO*t PER flit *ATtO h excess af I ari4 sialtarly the PøWe? Ftane Nutrn F1ixNh Trip Setpints within thi next 4 iour1 Yertf thit the qUMRMr PCWER fliT RATtO Is within its lieit wIthin 24 wi ft.r .xc*.dinq tha 111t or re4*ce fl4(AL t* len than - af RATED ThE P4NE* wW*In the iqt 2 høUrs aM rçthe r Rançe Neutrøn FTuxHlqh TH S.to I tts ta liii than ar qual ta $S% t ATE ThEtAi POb*ER within the .xt 4 hourt; aM

4. 74enti ty nd crrct the ciuse of the c-fl left dittaa prior to Irr,aslq ThEL CWER; n*aqu*øt PR QPEATtC$

5 at RATED TI. P( y prcee4 radd.4 that the QUACRMt PVWfR TtLT RATN is vertfie4 within its if ut at Iaar c* p.r flour far It aur1 or mtfI srff.d .pt1e at t or r4it.r RATED TNE PtR Sea S.cia1 Test E*c*tions S.dflc*tlon 3 1O1.

3/42U V - Denotes Critical Steps 2012 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 12 of 14 Form ES-C-i

- VERIFICAT[ON OF COMPLETION-Job Performance Measure No: 2012 NRC Exam Admin JPM SRO A2 Perform a Quadrant Power Tilt Ratio Surveillance Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2012 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 13 of 14 Form ES-C-i

- J PM CUE SHEET -

Name:

Date:

. The plant has been stabilized at 75% power following a dropped rod in Control Bank B (M-6) while performing a Initial Conditions:

  • tcerforming AOP-001, MALFUNCTION OF ROD CONTROL AND INDICATION SYSTEM.

.__No_deficiency_tags_on_PRNIs.

The CRS has directed you to perform a manual QPTR lAW OST-1 039, CALCULATION OF QPTR. The Power Range NIS readings are provided in the table below.

Initiating Cue:

For the purposes of the examination, there will be no independent verification. Show values of your work.

Recorded QPTR =

CHECK QPTR is less than or equal to 1.02 (circle) YES / NO PR NIS Readincls*

PRNIS Channel UPPER READING LOWER READING N41 115.7 128.3 N42 125.3 151.2 N43 144.8 160.9 N44 120.8 137.1 All values were taken with the Range/Rate switch in 400 pA/Slow position.

2012 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 14 of 14 Form ES-C-i JPMCUE SHEET Current and Voltage Setpoints Table (100% Power, 0% Incore Axial Offset)

Top Current Bottom Current Channel # (ptA) (iA)

N41 152.9 174.1 N42 172.7 200.4 N43 193.0 214.7 N44 153.9 187.9 Curve No. F-17-8 Rev. 9 2012 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Job Performance Measure Form ES-C-i

- Worksheet -

Facility: Shearon-Harris Task No.: 345001 H602 Task

Title:

Classify an EAL and JPM No.: 2012 NRC Exam Determine a PAR Admin JPM SRO A4 K/A

Reference:

G2.4.4i RO 2.9 SRO 4.6 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testincj: This JPM can be performed in any setting with the required references available.

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

You are the Site Emergency Coordinator.

- The Reactor is tripped and Safety Injection is actuated

- The A SUT transfer locked out during the fast bus transfer

- The A EDG failed to start

- The crew is implementing PATH-i

- RCPs are secured At 0351 the B CSIP trips on overcurrent Initial Conditions:

At 0403 the following conditions exist:

- CSFST Core Cooling is RED

- Core Exit TCs are 735°F

- RCS Pressure is 1200 psig

- RVLIS Full Range Level is 36%

The time is now 0419:

- Core Exit TCs are 743°F and rising

- RVLIS Full Range Level is 33% and lowering Evaluate the EAL Matrix and determine the highest classification Initiating Cue:

required for these plant conditions. This is a time critical JPM.

I This is a two (2) part TIME CRITICAL JPM where each part will be Evaluators Note:

timed separately.

2012 NRC Exam Admin JPM SRO A4 Rev. 1

Appendix C Job Performance Measure Form ES-C-i Worksheet Task Standard: Classify the highest EAL as a GE and correctly identify the PAR Required Materials: None General

References:

PEP-lb EAL Matrix PEP 110 EP-EAL (allowed reference)

Handouts:

  • Attached Initial Conditions
  • PEP11O
  • PEP-i 10 EAL Matrix
  • EP-EAL Time Critical Task: YES 15 minutes for classification. 15 minutes for PAR.

Validation Time: 30 minutes (accounts for 15 minute criteria for classification and PAR)

CRITICAL TASK JUSTIFICATION Classification of the event is critical for determining State and County Step 1 notifications, public information notices, site information notices, and event reportabiNty to the Nuclear Regulatory Commission.

Identification of protective recommendation to the State and County is Ste p 2 part of the standard goal of protecting the health and safety of the public.

2012 NRC Exam Admin JPM SRO A4 Rev. 1

Appendix C Page 3 of 6 Form ES-C-i

- PERFORMANGE1IWORMATION Start Time for this portion of JPM begins when the Evaluator Cue:

individual has been briefed.

START TIME:

Performance Step: 1 Identify EAL Classification for events in progress.

Standard: The correct EAL is: General Emerciency FG1 .1 The time required to make the classification by is:

0419 + 15 minutes= 0434 The Fuel is determined to be LOSS based on CSFST Core Cooling RED The RCS is determined to be LOSS based on RCS leak rate>

ECCS capability due to the loss of subcooling The CNMT is determined to be POTENTIAL LOSS based on FRP-C.1 Entry met (>730°F with RVLIS < 39%) and FRP-C.i is not effective within 15 minutes. 16 minutes since FRP-C.i Entry met and TCs still going up/RVLIS still going down.

Comments:

STOP TIME:

Terminating Cue: EAL classification(s) completed and provided to evaluator.

Start Time for this portion of JPM begins when the individual has been provided the directions to make a protective action recommendation and given the wind direction.

IF the candidate has determined that a General Emergency Evaluator Cue:

is declared then CUE:

Make a protective action recommendation (PAR). On the JPM cue sheet under the EAL classification identify the required Evacuation and Shelter Zones based on the wind is blowing from 130°.

V Denotes Critical Steps

- 2012 NRC Exam Admin JPM SRO A4 Rev. 1

Appendix C Page 4 of 6 Form ES-C-i

. PERFORMANCE INEORMATIOi4 -

START TIME:

V Performance Step: 2 Determine PAR. Refers to PEP-li 0 Attachment 3.

Time of PAR determination:

Standard: PROTECTIVE ACTION RECOMMENDATION:

. Evacuate 2 Mile Radius & 5 Miles downwind. Shelter all other subzones

. EVACUATE Subzones: A, B. L

. SHELTER Subzones: C, D. E. F, G, H, I, J. K, M, N PAR is determined < 15 minutes from time of classification.

Comment:

Terminating Cue: After the PAR is specified: This JPM is complete.

STOP TIME:

V - Denotes Critical Steps 2012 NRC Exam Admin JPM SRO A4 Rev. 1

Appendix C Page 5 of 6 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2012 NRC Exam Admin JPM SRO A4 Classify an Event and Identify PARs Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SAT UNSAT Examiners Signature: Date:

2012 NRC Exam Admin JPM SRO A4 Rev. 1

Appendix C Page 6 of 6 Form ES-C-i

- JPMCUESHEET -

Name:

Date:

You are the Site Emergency Coordinator.

- The Reactor is tripped and Safety Injection is actuated

- The A SUT transfer locked out during the fast bus transfer

- The A EDG failed to start

- The crew is implementing PATH-i

- RCPs are secured At 0351 the B CSIP trips on overcurrent Initial Conditions:

At 0403 the following conditions exist:

- CSFST Core Cooling is RED

- Core Exit TCs are 735°F

- RCS Pressure is 1200 psig

- RVLIS Full Range Level is 36%

The time is now 0419:

- Core Exit TCs are 743°F and rising

- RVLIS Full Range Level is 33% and lowering Evaluate the EAL Matrix and determine the classification(s)

Initiating Cue: required for these plant conditions.

This is a time critical JPM.

EAL Classification AND Time that classification is required to be declared by:

EAL:

Time required to be declared by:

2012 NRC Exam Admin JPM SRO A4 Rev. 1