MONTHYEARL-PI-11-037, License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil2011-08-11011 August 2011 License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil Project stage: Request ML1126300412011-09-16016 September 2011 Ngp Units 1 and 2 - Acceptance Review of LAR to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 and 3.8.3 Project stage: Acceptance Review ML1200603092012-01-19019 January 2012 Request for Additional Information Related to License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 and 3.8.3 Project stage: RAI L-PI-12-007, Response to Requests for Additional Information for License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8, Cooling Water System & 3.8.3, Diesel Fuel Oil.2012-02-21021 February 2012 Response to Requests for Additional Information for License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8, Cooling Water System & 3.8.3, Diesel Fuel Oil. Project stage: Response to RAI ML12132A3132012-05-0808 May 2012 Ngp - Draft Request for Clarification of February 21, 2012 RAI Response Concerning Diesel Fuel Oil LAR Project stage: Draft RAI ML12142A1562012-05-23023 May 2012 Request for Additional Information Related to License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 and 3.8.3 Project stage: RAI L-PI-12-047, Supplement to License Amendment Request (LAR) to Add Diesel Fuel Oil License Bases and Revise Technical Specifications (TS) 3.7.8, Cooling Water (Cl) System and 3.8.3, Diesel Fuel Oil (TAC Nos. ME6849 and ME68501)2012-07-0909 July 2012 Supplement to License Amendment Request (LAR) to Add Diesel Fuel Oil License Bases and Revise Technical Specifications (TS) 3.7.8, Cooling Water (Cl) System and 3.8.3, Diesel Fuel Oil (TAC Nos. ME6849 and ME68501) Project stage: Supplement L-PI-12-088, Supplement to License Amendment Request (LAR) to Add Diesel Fuel Oil License Bases and Revise Technical Specifications (TS) 3.7.8, Cooling Water (Cl) System and 3.8.3, Diesel Fuel Oil (TAC Nos. ME6849 and ME6850)2012-10-0404 October 2012 Supplement to License Amendment Request (LAR) to Add Diesel Fuel Oil License Bases and Revise Technical Specifications (TS) 3.7.8, Cooling Water (Cl) System and 3.8.3, Diesel Fuel Oil (TAC Nos. ME6849 and ME6850) Project stage: Supplement ML13011A3892013-01-22022 January 2013 Request for Additional Information Related to License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 and 3.8.3 Project stage: RAI L-PI-13-001, Supplement to License Amendment Request (LAR) to Add Diesel Fuel Oil License Bases and Revise Technical Specifications (TS) 3.7.8, Cooling Water (Cl) System and 3.8.3, Diesel Fuel Oil.2013-02-0808 February 2013 Supplement to License Amendment Request (LAR) to Add Diesel Fuel Oil License Bases and Revise Technical Specifications (TS) 3.7.8, Cooling Water (Cl) System and 3.8.3, Diesel Fuel Oil. Project stage: Supplement L-PI-13-039, Supplement to License Amendment Request (LAR) to Add Diesel Fuel Oil License Bases and Revise Technical Specifications (TS) 3.7.8, Cooling Water (Cl) System and 3.8.3, Diesel Fuel Oil.2013-04-30030 April 2013 Supplement to License Amendment Request (LAR) to Add Diesel Fuel Oil License Bases and Revise Technical Specifications (TS) 3.7.8, Cooling Water (Cl) System and 3.8.3, Diesel Fuel Oil. Project stage: Supplement ML13093A3442013-05-0909 May 2013 License Amendments for Fuel Oil System and TSTF-501 Project stage: Other ML13214A0292013-08-0202 August 2013 Correction Letter for License Amendment Nos. 207 (Unit 1) and 194 (Unit 2) Project stage: Other 2012-05-08
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report L-PI-23-010, Annual Report of Individual Monitoring2023-04-27027 April 2023 Annual Report of Individual Monitoring L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-005, CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2023-03-0303 March 2023 CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) L-PI-23-001, Day Steam Generator Tube Inspection Report2023-01-30030 January 2023 Day Steam Generator Tube Inspection Report L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report2022-12-21021 December 2022 Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report L-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2022-12-0202 December 2022 Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-037, Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts2022-09-20020 September 2022 Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts L-PI-22-032, CFR 50.46 LOCA Annual Report2022-06-16016 June 2022 CFR 50.46 LOCA Annual Report L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles2022-06-10010 June 2022 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-024, Supplement to Application for License Amendment to Implement 24-Month Operating Cycle2022-03-0707 March 2022 Supplement to Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 22021-12-0707 December 2021 Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request2021-11-0404 November 2021 Response to Request for Additional Information Cooling Water System License Amendment Request L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 L-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island2021-09-30030 September 2021 Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island L-PI-21-016, Application for License Amendment to Implement 24-Month Operating Cycle2021-08-0606 August 2021 Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-027, 2020 10 CFR 50.46 LOCA Annual Report2021-06-28028 June 2021 2020 10 CFR 50.46 LOCA Annual Report L-PI-21-023, Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report2021-05-14014 May 2021 Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes2021-04-19019 April 2021 Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes L-PI-20-050, Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic2020-10-0707 October 2020 Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic L-PI-20-051, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2020-09-28028 September 2020 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ2020-09-0101 September 2020 Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 L-PI-20-035, = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule2020-07-28028 July 2020 = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI)2020-06-10010 June 2020 Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) L-PI-20-014, Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI2020-04-29029 April 2020 Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI L-PI-20-004, License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.132020-03-30030 March 2020 License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.13 L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency L-PI-19-038, Submittal of Revised Pressure and Temperature Limits Report2019-09-19019 September 2019 Submittal of Revised Pressure and Temperature Limits Report L-PI-19-037, Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals2019-09-16016 September 2019 Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals L-PI-19-025, Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP)2019-08-27027 August 2019 Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-029, Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For...2019-08-0505 August 2019 Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For... L-PI-19-002, 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 22019-06-13013 June 2019 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 2 L-PI-19-014, Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-04-29029 April 2019 Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-PI-19-003, Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP)2019-02-0404 February 2019 Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-006, Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements2019-01-29029 January 2019 Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements L-PI-19-005, Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.692019-01-15015 January 2019 Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.69 L-PI-18-063, Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 8052018-12-0606 December 2018 Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 805 2024-01-02
[Table view] |
Text
/@ Xcel EnergyB L-PI-I 2-047 10 CFR 50.90 U S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 Renewed License Nos. DPR-42 and DPR-60 Supplement to License Amendment Request (LAR) to Add Diesel Fuel Oil License Bases and Revise Technical Specifications (TS) 3.7.8, "Cooling Water (CL) System" and 3.8.3, "Diesel Fuel Oil" (TAC Nos. ME6849 AND ME68501 By letter dated August 11,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. M L I 12240140), Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), requested NRC review and approval of additional diesel fuel oil (DFO) license bases and amendments to TS 3.7.8, "Cooling Water (CL) System" and 3.8.3, "Diesel Fuel Oil" for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. NSPM supplemented this LAR by letter dated February 21, 2012 (ADAMS Accession No. MLl2054A057). By letter dated May 23,2012, ADAMS Accession No. ML12142A156, NRC Staff requested additional information (RAI) to support review of the LAR dated August 11,2011 (MLI 12240140) as supplemented February 21,2012. The enclosure to this letter provides responses to the NRC Staff RAls. NSPM submits this supplement in accordance with the provisions of 10 CFR 50.90.
The supplemental information provided in this letter and enclosure does not impact the conclusions of the Determination of No Significant Hazards Consideration or Environmental Assessment presented in the August II , 201 I(ADAMS Accession No.
M L I 12240140) submittal as supplemented February 21,2012 (ADAMS Accession No. ML12054A057).
In accordance with 10 CFR 50.91, NSPM is notifying the State of Minnesota of this LAR supplement by transmitting a copy of this letter and enclosure to the designated State Official.
If there are any questions or if additional information is needed, please contact Mr. Dale Vincent, P.E., at 651-388-1 121.
1717 Wakonade Drive East Welch, Minnesota 55089-9642 Telephone: 651.388.1 121
Document Control Desk Page 2 Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
I declare under penalty of perjury that the foregoing is true and correct.
Executed On JUL O 9 2012 n
James E. Molden uSite Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Enclosures (1) cc: Administrator, Region Ill, USNRC Project Manager, PINGP, USNRC Resident Inspector, PINGP, USNRC State of Minnesota
ENCLOSURE Response to Requests for Additional Information (RAls) for License Amendment Request (LAR) to Add Diesel Fuel Oil License Bases and Revise Technical Specifications (TS) 3.7.8, "Cooling Water (CL) System" and 3.8.3, "Diesel Fuel Oil" (TAC Nos. ME6849 and ME6850)
This enclosure provides responses from Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), to Nuclear Regulatory Commission (NRC) RAls provided by letter dated May 23, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12142A156) regarding the LAR requesting NRC review and approval of additional diesel fuel oil (DFO) license bases and amendments to TS 3.7.8, "Cooling Water (CL)
System" and TS 3.8.3, "Diesel Fuel OilJ1 for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2, submitted by letter dated August 11, 201 1 (MLI 12240140) as supplemented February 21,2012 (ML12054A057).
NRC RAI EEEB-7 In its February 21, 2012, letter, the licensee's response to RAI EEEB-la delineates the flow paths that are available from each of the storage tanks to the day tank of each diesel engine. Technical Specification (TS) surveillance requirement (SR) 3.8.1.5 requires verification of capability of the fuel oil transfer system to transfer fuel oil from the storage tank to the day tank. Validate that current plant procedures verify operability of each of the paths delineated in the NSPM response to comply with TS requirements.
NSPM Response to RAI EEEB-7:
SR 3.8.1.5 is focused on the ability of the Unit 1 and 2 fuel oil system, which supports operation of the safety-related Emergency Diesel Generators (EDGs), to transfer fuel oil from the storage tanks to the day tanks. As stated in the TS Bases for this SR, "This Surveillance demonstrates that each required fuel oil transfer pump operates and transfers fuel oil from its associated storage tank to its associated day tank." The SR 3.8.1.5 31 day frequency is aligned with the surveillance test that is also performed every 31 days to satisfy requirements for the Diesel Fuel Oil Testing Program per TS 5.5.11. Steps are located in the monthly sampling surveillance procedures to operate each transfer pump and verify that a level change is seen at the associated day tank.
The appropriate steps and checks are marked with an asterisk (*) to denote that they are acceptance criteria to meet a TS requirement. The control switch is verified to be placed in the "auto" position after the performance of the test for each transfer pump.
The procedures for monthly sampling for Unit 1 and 2 EDGs also satisfy the requirements for SR 3.8.1.4.
Page 1 of 4
Diesel Fuel Oil RAls NRC RAI EEEB-8 The licensee's response to RAI EEEB-4a states that Section 8.4 of the PlNGP Updated Safety Analysis Report (USAR) defines the design-basis worst case accident from the emergency diesel generator (EDG) loading perspective as a large-break loss-of-coolant accident (LBLOCA) concurrent with a loss of offsite power (LOOP). NSPM further states that the basis for EDG load reduction within the first hour of EDG operation during this event is associated with the draindown of the refueling water storage tank (RWST) and the subsequent transfer to the recirculation mode.
The NRC staff notes that the LOOP/LBLOCA event may result in the 'most severe' short term loading of the EDG and may be used to determine the kilowatt rating of the EDG.
However, it may not be the most conservative loading from a fuel oil consumption perspective, when some pumps may operate for longer durations depending on the type of break or event. USAR Table 14.7-4 (Unit 2) provides the time durations for RWST low level alarm actuation for various break sizes. According to this Table, the RWST low level is not reached for a 1.5 inch break size and it takes approximately 5467 seconds to reach the low level alarm point following a 2 inch break.
Validate that the calculation of record for fuel oil consumption evaluated events related to different size breaks for LOCA and steam line breaks inside containment for a bounding case.
NSPM Response to RAI EEEB-8:
The calculation of record for fuel oil consumption does not evaluate events related to difference size breaks for LOCA and steam line breaks inside containment for a bounding case. The PlNGP design basis for fuel oil storage has included specific reference to the LBLOCA EDG loading Table 8.4-1 in the USAR since the initial licensing of the plant.
As previously discussed in the NSPM response to NRC RAI EEEB-3 in letter L-PI 007, there is no combination of a worst case design basis accident coincident with an external flood in the current PlNGP design basis for fuel oil storage requirements.
When the new design basis for fuel oil storage as requested in this LAR is implemented, a worst case fuel consumption design basis accident EDG loading case will be created in the EDG loading calculation that will include loads required during a LBLOCA and/or a SBLOCA. Significant loading differences for SBLOCA will include the operation of pressurizer heaters and the duration of injection will be extended to the maximum time allowed for transfer to recirculation phase to prevent boron precipitation. The maximum allowed time per the time critical operator action to prevent boron precipitation is 7.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> as described in plant operator instructions. The fuel oil storage calculations will use this loading case as design input to determine fuel storage requirements.
Page 2 of 4
Diesel Fuel Oil RAls NRC RAI EEEB-9 The licensee's response to RAI EPTB - l a and -I b states that fuel oil consumption rates were determined based on manufacturer's testing and pre-operational testing records.
The test records provide the consumption rates (in units of pounds I[brake horsepower
- hours] for the Unit 1 EDGs or (in units of grams I[kilowatt
- hours]) for the Unit 2 EDGs at various loading conditions. Provide details on the power factor values that were used in the testing program and how the EDG fuel oil consumption calculations accounted for the reactive power required by accident-mitigating equipment.
NSPM Response to RAI EEEB-9:
Test records indicate that the fuel consumption rate testing was likely done at unity power factor. Increases in reactive power have no direct impact on fuel oil consumption. There are however, indirect impacts (secondary effects) that result from increased reactive power. The indirect impacts include:
- 1. Additional power consumed by the excitation system.
- 2. Additional power consumed via resistive losses in the generator, cabling and distribution system transformers due to the higher current flow.
The PlNGP fuel oil storage calculations use the PlNGP EDG loading calculation (ENG-EE-021) as design input for EDG load which includes estimated cable and transformer losses in the EDG load. Generator excitation system losses are not expressly included in the EDG loading since they are normally accounted for in the generator efficiency when a parasitic excitation system is used. As a result, including excitation system losses in the output loading would amount to "double dippingJJwith respect to required brake horse power (BHP) and fuel consumption.
Nevertheless, the excitation system power requirements (losses) at 100% loading and rated (0.8) power factor are bounded by conservatisms in the estimated losses in ENG-EE-021 as follows using Unit 1 Train A EDG D l as an example:
ENG-EE-021 used a conservative value of 2% of 480V load for transformer losses and determined the losses to be 20.25 kW. The PlNGP Electrical Transient Analysis Program (ETAP) model in the degraded voltage calculation (ENG-EE-171) for the same plant alignment with the exception that the system is fed from offsite sources shows a worst case transformer loss value of < 0.8% of the total 480 V load. Using I% for conservatism, the expected Train A transformer losses would be approximately 10.IkW.
ENG-EE-021 used a conservative value of 3% for cable losses and determined the losses to be 66.12 kW. The PlNGP ETAP model in ENG-EE-171 for the same plant alignment with the exception that the system is fed from offsite Page 3 of 4
Diesel Fuel Oil RAls sources shows a worst case cable and motor overload relay (MOLR) heater loss value of < 1.I %. Using I.5% for conservatism, the expected Train A cable and MOLR heater losses would be approximately 33.1 kW.
ENG-EE-021 uses 20.25 + 66.12 = 86.37 kW as the combined losses in Train A for cables and transformers. The ETAP results in ENG-EE-171 indicate that the combined losses are approximately 10.1 + 33.1 = 43.2 kW. This shows that the estimate in ENG-EE-021 is conservative (over estimates) by approximately 86.4 - 43.2 = 43.2 kW.
The exciter test documentation indicates that the exciter draws less than 17 kW at 100% load and 0.8 power factor. The 43.2 kW of conservatism in the ENG-EE-021 estimated losses is more than twice the losses in the exciter test report for the condition when the EDG is loaded to 100% at a power factor of 0.8.
Therefore, the power consumed by the excitation system is bounded by the conservatisms in the losses calculated in the EDG loading calculation.
Examination of the estimated losses in ENG-EE-021 versus the losses calculated in ENG-EE-171 by ETAP shows a similar amount of conservatism (more than twice the losses shown in the exciter test report).
Note that the cable and transformer losses in ENG-EE-171 are calculated at the degraded voltage analytical limit value, which is lower than the EDG's output voltage.
Since the loading on the safety buses during the postulated events is predominantly motor (constant kVA) loads, the currents will be slightly higher at the lower voltage. As a result, the cable and transformer losses determined by ETAP in ENG-EE-171 will be slightly higher (conservative) relative to the losses when the system is fed from the EDG.
The EDG loading values from ENG-EE-021 are divided by generator efficiency to arrive at required BHP used in the fuel consumption rate calculation, which accounts for resistive losses in the generator.
Therefore, the EDG loading and EDG fuel oil consumption calculations have accounted for the reactive power required by accident-mitigating equipment.
Page 4 of 4