Public Meeting Regarding RIS on NRC Position on GDC Relationship to Operability. (Superseded by ML12207A211)
ML12188A402
Person / Time
Site: Technical Specifications Task Force
Issue date: 07/24/2012
From: Michelle Honcharik
Licensing Processes Branch (DPR)
To: John Jolicoeur
Licensing Processes Branch (DPR)
Honcharik M
References
Download: ML12188A402 (5)


Text

July 24, 2012 (Superseded by ML12207A211)

MEMORANDUM TO: John R. Jolicoeur, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM:

Michelle C. Honcharik, Sr. Project Manager /RA John Jolicoeur for/

Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING PUBLIC MEETING WITH INDUSTRY STAKEHOLDERS AND THE U.S. NUCLEAR REGULATORY COMMISSION (NRC) RE: DRAFT REGULATORY ISSUE

SUMMARY

(RIS), NRC STAFF POSITION ON THE RELATIONSHIP BETWEEN GDC [GENERAL DESIGN CRITERIA] REQUIREMENTS AND TECHNICAL SPECIFICATION OPERABILITY DATE & TIME:

Wednesday, August 8, 2012 12:00 p.m. - 5:00 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike, Room T-8A1 Rockville, MD 20852 PURPOSE:

To discuss and seek public comment on the Draft RIS, NRC Staff Position on the Relationship Between GDC Requirements and Technical Specification Operability. The draft RIS clarifies the NRC staffs position on the relationship between the GDC for nuclear power plants and technical specification operability. In addition, the RIS clarifies the process for addressing non-conformances with GDC as incorporated into a plants current licensing basis.

CATEGORY 2*:

This is a Category 2 Meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.

MEETING CONTACTS:

Michelle C. Honcharik, NRR Holly D. Cruz, NRR 301-415-1774 301-415-1053 Michelle.Honcharik@nrc.gov Holly.Cruz@nrc.gov

  • Commissions Policy Statement on Enhancing Public Participation in NRC Meetings, (67 FR 36920), May 28, 2002

J. Jolicoeur The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. braille, large print), please notify the NRC's meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and the Office of New Reactors (NRO).

Participants from the industry will include members of the Technical Specifications Task Force.

NRC Michelle Honcharik (NRR)

Robert Elliott (NRR)

Eric Oesterle (NRO), et al.

Project No. 753

Enclosure:

Agenda cc w/encl: See next page

ML12188A402 NRC-001 OFFICE PLPB/LA PLPB/PM PLPB/BC NAME DBaxley (JJolicoeur for)

MHoncharik JJolicoeur DATE 7/23/2012 7/24/2012 7/24/2012 Technical Specifications Task Force Project No. 753 cc:

Technical Specifications Task Force 11921 Rockville Pike Suite 100 Rockville, MD 20852 Attention: Donald R. Hoffman E-mail: donaldh@excelservices.com Norman J. (Jack) Stringfellow Southern Nuclear Operating Company P.O. Box 1295 Birmingham, AL 35201-1295 E-mail: string@southernco.com Roy A. (Tony) Browning Duane Arnold Energy Center 3277 DAEC Rd.

PSC/Licensing Palo, IA 52324-9785 E-mail: tony.browning@nexteraenergy.com William J. (Billy) Steelman Entergy Waterford 3 17265 River Road Hwy 18 Killona, LA 70057 E-mail: wsteelm@energy.com Wendy E. Croft Exelon Nuclear 200 Exelon Way, Suite 340 Kennett Square, PA 19348 E-mail: wendi.croft@exeloncorp.com Brian D. Mann EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 E-mail: brianm@excelservices.com

Agenda for Public Meeting with Industry Stakeholders and the U.S. Nuclear Regulatory Commission (NRC) RE: Draft Regulatory Issue Summary (RIS),

NRC Staff Position on the Relationship between GDC [General Design Criteria]

Requirements and Technical Specification Operability August 8, 2012 12:00 p.m. - 5:00 p.m.

Topics Administrative o Introductions o Other Administrative Issues Summary of RIS by NRC Staff Public Comments Open Discussion Adjourn Meeting ENCLOSURE