UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

July 5, 2012

Mr. Michael J. Pacilio

Senior Vice President, Exelon Generation Company, LLC

President and Chief Nuclear Officer (CNO), Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION - NOTIFICATION OF AN NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST

FOR INFORMATION INSPECTION REPORT 05000254/2012004(DRS);

05000265/2012004(DRS)

Dear Mr. Pacilio:

On September 17, 2012, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site

portion of the Triennial Heat Sink Performance Inspection at your Quad Cities Nuclear Power

Station, Units 1 and 2. This inspection will be performed in accordance with NRC baseline

inspection procedure (IP) 71111.07.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

The first group lists information necessary for our initial inspection scoping activities.

This information should be available to the lead inspector no later than August 3, 2012. By

August 17, 2012, the inspector will communicate the initial selected set of approximately 2-3

risk significant heat exchangers.

The second group of documents requested is those items needed to support our in-office

preparation activities. This set of documents, including the calculations associated with

the selected heat exchangers, should be available at the Regional Office no later than

August 30, 2012. This information should be separated for each selected component,

especially if provided electronically (e.g., folder with component name that includes

calculations, condition reports, maintenance history, etc.). During the in-office preparation

activities, the inspector may identify additional information needed to support the inspection.

The last group includes the additional information above, as well as plant specific

reference material. This information should be available on-site to the inspector on

September 17, 2012. It is also requested that corrective action documents and/or

questions developed during the inspection be provided to the inspector as the documents

are generated.

.

M. Pacilio

-2-

The lead inspector for this inspection is Mr. Larry J. Jones Jr. We understand that our

regulatory contact for this inspection is Tom Petersen of your organization. If there are

questions about the material requested, or the inspection, please call Larry J. Jones Jr. at

(630) 829-9864. Please send the information electronically or to the following e-mail address

larry.jones@nrc.gov. A hard-copy with the required information is also an acceptable option.

It is important that these documents be as complete as possible, in order to minimize the

number of documents requested during the preparation week or during the on-site inspection.

All requested documents are to be for the time period from the on-site inspection period back to

the documents that were provided in response to the previous heat sink performance

inspection. If no activities were accomplished in that time period, then the request applies to the

last applicable document in the previous time period.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA by A. Dunlop for/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-254, 50-265 and 72-053

License Nos. DPR-29 and DPR-30

Enclosure:

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT

REQUEST

cc w/encl:

Distribution via ListServ'

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

1

Enclosure

Inspection Report: 05000254/2012004(DRS); 05000265/2012004(DRS)

Inspection Dates:

September 17 - 21, 2012

Inspection Procedure:

Inspection Procedure (IP) 71111.07, Heat Sink Performance

Lead Inspector:

(630) 829-9864

Larry J. Jones Jr.

larry.jones@nrc.gov

Team Member

(630) 829-9624

Gerard F. ODwyer

I.

Information Requested By August 3, 2012

gerard.odwyer@nrc.gov

1. List of all Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of corrective action program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat

exchanger testing, for the previous three years or since the last corrective action

program document list was sent to the NRC for the previous heat sink performance

inspection. The list should include all corrective action program documents not on

the last corrective action program document list.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5. Last two System Health Report(s) and maintenance rule system notebooks for all the

GL 89-13 heat exchangers.

6. List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be for

the time period from the on-site inspection period back to the documents that were

provided in response to the previous heat sink performance inspection.

7. List of permanent and temporary modifications (with a short description) associated

with GL 89-13 heat exchangers. The requested documents are to be for the time

period from the on-site inspection period back to the documents that were provided

in response to the previous heat sink performance inspection.

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

2

Enclosure

II.

Information Requested By August 30, 2012

1. Copies of the GL 89-13 responses.

2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to the

GL 89-13 Heat Exchanger Program.

3. Copies of procedures developed to implement the recommendations of GL 89-13

(e.g., the GL 89-13 Heat Exchanger Program description).

4. Copies of the selected corrective action program documents.

5. For the specific heat exchangers selected:

a. Copies of the UFSAR sections applicable for each heat exchanger;

b. Copy of system description and design basis document for the heat exchangers

(as applicable);

c. Copies of normal, abnormal, and emergency operating procedures associated

with the selected heat exchangers;

d. Copy of the construction code, Design Specification, heat exchanger data

sheets, and vendor documents including component drawings applicable for the

heat exchangers;

e. Copies of calculations (excluding data files), which currently apply to each heat

exchanger that:

i. establish the limiting design basis heat load required to be removed by each

of these heat exchangers;

ii. demonstrate the heat exchangers capacity to remove the limiting heat load;

iii. correlate surveillance testing and/or inspection results from these heat

exchangers with design basis heat removal capability (e.g., basis for

surveillance test and/or inspection acceptance criteria);

iv. evaluate the potential for water hammer in each heat exchanger or

associated piping; and

v. evaluate excessive tube vibration in each heat exchanger.

f. Provide a list of calculations (with a short description), which currently apply to

each heat exchanger excluding the calculations requested in the previous item;

g. Copy of any operability determination or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers;

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

3

Enclosure

h. Copies of the two most recent completed tests and evaluation data confirming

thermal performance for those heat exchangers, which are performance tested;

i.

Provide a list of instruments (with a short description) associated with automatic

or alarm functions for these heat exchangers;

6. For the ultimate heat sink (UHS) and the safety-related service water system (or

equivalent):

a. Copies of the applicable UFSAR sections;

b. Copy of system description and design basis document (as applicable);

c. Copy of the construction code and Design Specification;

d. Copies of normal, abnormal, and emergency operating procedures associated

with the UHS and safety-related service water systems including procedures for

loss of these systems;

e. Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service water system;

f. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that

states the maximum cooling water system inlet temperature limit that still allows

full licensed power operation of the nuclear reactor;

g. Copies of corrective action documents associated with waterhammer or hydraulic

transients in the service water system since the last Heat Sink Inspection;

h. If available, provide an electronic copy of piping and instrumentation diagrams

(P&IDs) for the service water system, including the intake structure;

i.

Provide a list of calculations (with a short description), which currently apply to

UHS and service water system;

j.

Provide a list of instruments (with a short description) associated with automatic

or alarm functions for the safety-related service water system and/or UHS;

k. Provide a list of any design change (with a short description) performed on the

UHS or safety-related service water system since the last heat sink performance

inspection;

l. Copy of the last flow balance testing performed on the safety-related service

water system;

7. A schedule of all inspections, cleanings, maintenance, or testing of any safety-

related plant heat exchanger to be performed during the on-site portion

of the inspection.

8. If available, electronic copies of the current Technical Specifications, Technical

Specifications Basis, and Technical Report Manual.

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

4

Enclosure

III.

Information Requested to be Available on First Day of Inspection,

September 17, 2012

1. For the specific heat exchangers selected:

a. Documentation and procedures that identify the types, accuracy, and location of

any special instrumentation used for the two most recently completed thermal

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests;

b. Copies of calculations that determine the setpoint values of any alarms which

monitor on-line performance;

c. Copies of the documents describing the open-and-inspect results of each heat

exchanger. The requested documents are to be for the time period from the on-

site inspection period back to the documents that were provided in response to

the previous heat sink performance inspection;

d. The cleaning and inspection maintenance schedule for each heat exchanger for

the next 5 years;

e. Copy of the operating procedure that ensures that the maximum cooling water

system inlet temperature limit is not exceeded. Also, provide a copy of the

calculation that demonstrates the acceptability of the maximum cooling water

inlet temperature;

f. Copy of documents that describe the controls that prevent heat exchanger

degradation due to excessive flow induced vibration during operation;

g. Copy of the periodic flow testing at or near maximum design flow. The requested

documents are to be for the time period from the on-site inspection period back

to the documents that were provided in response to the previous heat sink

performance inspection;

h. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation, which establishes the

maximum number of tubes which can be plugged in each heat exchanger;

i.

Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchange;

j.

Copies of the documents describing the structural integrity inspection results the

heat exchangers (e.g., eddy current summary sheets, ultrasonic testing results,

and visual inspection results). The requested documents are to be for the time

period from the on-site inspection period back to the documents that were

provided in response to the previous heat sink performance inspection;

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

5

Enclosure

k. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers; and

l.

Hardcopies of piping and instrumentation diagrams (P&IDs) of the systems

applicable to the selected heat exchangers (11X17 or similar size is preferred if

legible).

2. For the UHS:

a. Copies of the toe of the weir or embankment inspection procedures and the

associated results. The requested documents are to be for the time period from

the on-site inspection period back to the documents that were provided in

response to the previous heat sink performance inspection;

b. Copies of the inspection procedures of the rip rap protection placed on excavated

side slopes and the associated results. The requested documents are to be for

the time period from the on-site inspection period back to the documents that

were provided in response to the previous heat sink performance inspection;

c. Copies of the dam inspection procedures that monitor the integrity of the heat

sink and the associated results, if applicable. The requested documents are to

be for the time period from the on-site inspection period back to the documents

that were provided in response to the previous heat sink performance inspection;

d. Copies of the inspection procedures for the verification of the structural integrity

of underwater/underground UHS and the associated results. The requested

documents are to be for the time period from the on-site inspection period back

to the documents that were provided in response to the previous heat sink

performance inspection;

e. Copies of the maintenance and/or inspection procedures for underwater UHS

sediment intrusion and the associated results including underwater/underground

diving inspections and/or sediment removal activities. The requested documents

are to be for the time period from the on-site inspection period back to the

documents that were provided in response to the previous heat sink performance

inspection;

f. Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability; and

g. Copies of surveillance procedures and testing results performed on the

instrumentation relied upon to determine UHS reservoir capability. The

requested documents are to be for the time period from the on-site inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

3. For the review associated with the system walkdown of the service water intake

structure:

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

6

Enclosure

a. Copies of the documents associated with the monitoring, trending, and

remediation macrofouling (e.g., silt, dead mussel shells, or debris) and biotic

fouling (e.g., fish, algae, grass, or kelp) at the service water pump bay. The

requested documents are to be for the time period from the on-site inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection;

b. Copies of procedures associated with operating during adverse conditions (e.g.,

icing, high temperatures, low water level, grass intrusion);

c. Copies of surveillance procedures and testing results performed on the service

water pump house water level instruments. The requested documents are to be

for the time period from the on-site inspection period back to the documents that

were provided in response to the previous heat sink performance inspection;

d. Copies of documents associated with the monitoring of safety-related service

water pump performance for potential strong-pump vs. weak-pump interaction;

e. Copy of the evaluation for the potential effects of low flow/level on underwater

weir walls intended to limit silt or sand intake, if applicable;

f. Copies of procedures used to monitor interface valves between the safety-related

section of the service water system and the non-safety-related section and the

associated results. The requested documents are to be for the time period from

the on-site inspection period back to the documents that were provided in

response to the previous heat sink performance inspection;

g. Hardcopies of piping and instrumentation diagrams (P&IDs) of the safety-related

service water system (11X17 or similar size is preferred if legible);

If the information requested above will not be available, please contact Larry J. Jones Jr., as

soon as possible at (630) 829-9864 or email larry.jones@nrc.gov.

M. Pacilio

-2-

The lead inspector for this inspection is Mr. Larry J. Jones Jr. We understand that our regulatory contact

for this inspection is Tom Petersen of your organization. If there are questions about the material

requested, or the inspection, please call Larry J. Jones Jr. at (630) 829-9864. Please send the

information electronically or to the following e-mail address larry.jones@nrc.gov. A hard-copy with the

required information is also an acceptable option.

It is important that these documents be as complete as possible, in order to minimize the number of

documents requested during the preparation week or during the on-site inspection.

All requested documents are to be for the time period from the on-site inspection period back to the

documents that were provided in response to the previous heat sink performance inspection. If no

activities were accomplished in that time period, then the request applies to the last applicable document

in the previous time period.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements

were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not

conduct or sponsor, and a person is not required to respond to, a request for information or an

information collection requirement unless the requesting document displays a currently valid Office of

Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure

will be available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the

NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by A. Dunlop for/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos.: 50-254 and 50-265

License Nos.: DPR-29 and DPR-30

Enclosure:

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

cc w/encl: Distribution via ListServ'

DISTRIBUTION:

See next page

DOCUMENT NAME: G:\\DRSIII\\DRS\\Work in Progress\\Ltr 070512 Quad Cities Heat Sink RFI LJJ.docx

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE

RIII

RIII

NAME

LJones:ls

AMStone

DATE

07/05/12

07/05/12

OFFICIAL RECORD COPY

Letter to Mr. Michael J. Pacilio from Ms. Ann Marie Stone dated July 5, 2021.

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION - NOTIFICATION OF AN NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST

FOR INFORMATION INSPECTION REPORT 05000254/2012004(DRS);

05000265/2012004(DRS)

DISTRIBUTION:

Silas Kennedy

RidsNrrDorlLpl3-2 Resource

RidsNrrPMQuadCities Resource

RidsNrrDirsIrib Resource

Chuck Casto

Cynthia Pederson

Steven Orth

Jared Heck

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Tammy Tomczak