ML12181A337

From kanterella
Jump to navigation Jump to search
Response to Inspection Report No. 05000361-12403 and 50000362-12403; EA-12-083 and EA-11-067
ML12181A337
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/28/2012
From: St.Onge R
Southern California Edison Co
To: Hay M
Plant Support Branch-1
References
EA-11-067, EA-12-083, IR-12-403
Download: ML12181A337 (1)


Text

<....~.'.. :iNI ED ISON

' ~< :.~ :.

SOUTHERN CALIfORNIA Richard J. 81. Onge Director, Nuclear Regulatory Affairs and Emergency Planning An EDIS ON IN TER NATIONA L Comp an y June 28, 2012 10 CFR 50.4 Mr. Michael C. Hay, Chief, Plant Support Branch 1 U.S. Nuclear Regulatory Commission 1600 East Lamar Blvd Arlington, Texas 76011-4511

Subject:

Docket Nos. 50-361 and 50-362 Response to Inspection Report No. 05000361/2012403 and 50000362/2012403; EA-12-083 and EA-11-067 San Onofre Nuclear Generation Station, Units 2 and 3

Reference:

Letter from Mr. Thomas Blount (NRC) to Mr. Peter Dietrich (SCE) dated June 11, 2012, NRC Inspection Report 05000361/2012403 ; 05000362/2012403; Preliminary Greater Than Green Finding; and Exercise of Discretion

Dear Mr. Hay:

The reference letter transmitted NRC Inspection Report Nos. 05000361/2012403 and 05000362/2012403, which provided the results of a security baseline inspection completed on May 16, 2012, at San Onofre Nuclear Generating Station (SONGS), Units 2 and 3. The letter identified an apparent violation that is being considered for escalated enforcement and provided Southern California Edison (SCE) the opportunity to either: 1) request a predecisional enforcement conference; or 2) submit our position of the finding to the NRC in writing. The letter requested that SCE contact Mr. Michael C. Hay, Chief, Plant Support Branch 1, by phone and in writing within 10 days to notify the NRC of our intentions. In addition, the letter noted that if no response is received within 10 days, the NRC would continue with the significance determination and enforcement decision .

SCE has elected to accept the finding as characterized and, therefore, is not requesting a predecisional enforcement conference. Mr. D. Bauder, Site Vice President , informed Mr. Hay of this decision by phone on June 15, 2012.

This letter does not contain any commitments. If you have any questions, please feel free to contact me or Mr. R. J. S1. Onge at (949) 368-6240 .

cc: E. E. Collins, Regional Administrator, NRC Region IV G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3 R. Hall, NRC Project Manager, San Onofre Units 2 and 3 Document Control Desk P.O. Box 128 San Clemente, CA 92672