Reactor Coolant System Standpipe Level Indication System
ML12172A408
Person / Time
Site: Surry Dominion icon.png
Issue date: 06/06/2012
From: Lane N
Virginia Electric & Power Co (VEPCO), Dominion
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
12-366
Download: ML12172A408 (2)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 June 6, 2012 U.S. Nuclear Regulatory Commission Serial No.12-366 Attention: Document Control Desk NL&OS/GDM R1 Washington, DC 20555 Docket No.

50-281 License No.

DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

SURRY POWER STATION UNIT 2 REACTOR COOLANT SYSTEM STANDPIPE LEVEL INDICATION SYSTEM By letter dated May 10, 2012, the Nuclear Regulatory Commission (NRC) provided its final significance determination for the inspection finding associated with the Surry Unit 2 Reactor Coolant System (RCS) standpipe level indication system, as discussed in NRC Inspection Report Nos. 05000280/2012007 and 05000281/2012007. In that letter the NRC concluded that, based on new information presented by Dominion during the April 19, 2012 regulatory conference, the bases for the finding and associated apparent violation were no longer valid.

During the regulatory conference, Dominion stated that it is committed to either identifying and correcting the definitive cause of the erratic Surry Unit 2 RCS standpipe level indication or replacing the existing system with a reliable RCS level indication system during the next Unit 2 refueling outage. This letter serves to confirm that commitment. Furthermore, the repair/replacement activities will ensure that the Generic Letter 88-17 specifications for independent, reliable, and continuous RCS water level indication during reduced inventory conditions are met and maintained.

If you have any questions or require additional information, please contact Gary D. Miller at (804) 273-2771.

Sincerely, N. L. Lane Site Vice President Acot QfkL

Serial No.12-366 Docket No. 50-281 Page 2 of 2 Commitment made in this letter:

1. Dominion will either correct the existing erratic Surry Unit 2 RCS standpipe level indication or replace the system with a reliable RCS level indication system during the next Unit 2 refueling outage.

cc:

U.S. Nuclear Regulatory Commission, Region II Regional Administrator 245 Peachtree Center Ave. NE Suite 1200 Atlanta, Georgia 30303-1257 K. R. Cotton Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Surry Power Station