Category:E-Mail
MONTHYEARML24290A0442024-10-15015 October 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for September 2024 ML24281A1592024-10-0707 October 2024 Acceptance Review for FPL LAR - St. Lucie Unit 2 - Fuel Methodology Changes in Support of Transition to 24- Month Fuel Cycles ML24254A2562024-09-0606 September 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for August 2024 ML24248A2422024-09-0404 September 2024 Acceptance Review for St. Lucie, Unit 2 - Relief Request (RR) 14: Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval ML24246A0152024-08-12012 August 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for July 2024 ML24194A1222024-07-11011 July 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for June 2024 ML24192A2302024-07-10010 July 2024 003 Radiation Safety Baseline Inspection Information Request ML24176A1612024-06-15015 June 2024 NRR E-mail Capture - (External_Sender) May 2024 FPL Marine Turtle Removal Monthly Report ML24150A2192024-05-29029 May 2024 (E-Mail) St. Lucie, Unit 2 - License Amendment Request, Updated Spent Fuel Pool Criticality Analysis - Acceptance Review ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24134A0142024-05-10010 May 2024 NRR E-mail Capture - (External_Sender) Pasl Monthly Turtle Report for April 2024 ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24113A0372024-04-22022 April 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 and St. Lucie 2 - Request to Use Later Code of ASME (L-2024-LLR-0024) ML24101A2202024-04-0808 April 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for March 2024 ML24074A4262024-03-12012 March 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for February 2024 ML24177A2512024-02-12012 February 2024 Acceptance Review for RR 7-Proposed Alternative - Extension of Inspection Interval for St. Lucie Unit 1 Reactor Pressure Vessel Welds from 10 to 20 Years ML24036A2152024-02-0505 February 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for January 2024 ML24031A5472024-01-13013 January 2024 NRR E-mail Capture - (External_Sender) December 2023 FPL Marine Turtle Removal Monthly Report ML24002A7272023-12-16016 December 2023 NRR E-mail Capture - (External_Sender) November 2023 FPL Marine Turtle Removal Monthly Report ML23332A0352023-11-27027 November 2023 – Conversion to Improved Technical Specifications Change in Estimated Review Schedule ML23326A0252023-11-20020 November 2023 NRR E-mail Capture - (External_Sender) October 2023 FPL Marine Turtle Removal Monthly Report ML24008A1582023-11-14014 November 2023 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for October 2023 ML23254A2852023-09-11011 September 2023 NRR E-mail Capture - (External_Sender) August 2023 FPL Marine Turtle Removal Monthly Report ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23243A9182023-08-31031 August 2023 NRR E-mail Capture - Re Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23228A1482023-08-16016 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PSL2-I5-RR-01 (L-2023-LLR-0038) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23226A0692023-08-12012 August 2023 NRR E-mail Capture - (External_Sender) July 2023 FPL Marine Turtle Removal Monthly Report ML23223A0152023-08-11011 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PR-10 (L-2023-LLR-0039) ML23191A1952023-07-10010 July 2023 NRR E-mail Capture - (External_Sender) June 2023 FPL Marine Turtle Removal Monthly Report ML23216A1412023-06-30030 June 2023 August 2023 RP Inspection Document Request ML23248A1292023-06-29029 June 2023 NRR E-mail Capture - St Lucie 50.69 - Additional Audit Questions ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23198A0662023-06-22022 June 2023 NRR E-mail Capture - (External_Sender) Green Turtle Nest on Canal Bank, June 2023 ML23198A0642023-06-12012 June 2023 NRR E-mail Capture - (External_Sender) Loggerhead Nest on Canal Bank, May 2023 ML23163A1732023-06-10010 June 2023 NRR E-mail Capture - (External_Sender) May 2023 FPL Marine Turtle Removal Monthly Report ML23163A1222023-05-30030 May 2023 NRR E-mail Capture - (External_Sender) Nest on Intake Canal Bank ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23137A0942023-05-17017 May 2023 NRR E-mail Capture - Audit Plan - St Lucie Plant, Units 1 and 2 - 10 CFR 50.69 LAR ML23135A0292023-05-12012 May 2023 NRR E-mail Capture - (External_Sender) April 2023 FPL Marine Turtle Removal Monthly Report ML23129A8312023-05-0808 May 2023 NRR E-mail Capture - Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23109A1862023-04-19019 April 2023 And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23198A1592023-04-0707 April 2023 NRR E-mail Capture - (External_Sender) March 2023 FPL Marine Turtle Removal Monthly Report ML23074A2292023-03-15015 March 2023 NRR E-mail Capture - (External_Sender) February 2023 FPL Marine Turtle Removal Monthly Report ML23041A2262023-02-10010 February 2023 NRR E-mail Capture - (External_Sender) January 2023 FPL Marine Turtle Removal Monthly Report ML23065A1142023-02-0101 February 2023 NRR E-mail Capture - (External_Sender) FPL St. Lucie Plant Biological Opinion SERO-2019-03494 - Submittal ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML23019A0142023-01-18018 January 2023 NRR E-mail Capture - (External_Sender) Regarding St. Lucie Olive Ridley Capture 1/3/2023 ML23006A1822023-01-0606 January 2023 NRR E-mail Capture - (External_Sender) Psl Smalltooth Sawfish Capture 1/5/23 ML23006A1882023-01-0606 January 2023 NRR E-mail Capture - (External_Sender) December 2022 FPL Marine Turtle Removal Monthly Report 2024-09-06
[Table view] Category:Note to File incl Telcon Record
MONTHYEARML15086A2232015-03-27027 March 2015 Summary of Meeting Concerning the Annual Assessment of St. Lucie Nuclear Plant, Units 1 and 2 ML12171A3082012-06-18018 June 2012 E-mail Re Draft Summary of 05-31-12 Phone Call ML0909705822009-04-0707 April 2009 Phone Call Summary with Licensees and Alion Science and Technology on April 2, 2009 to Address NRC Staff Position on Chemical Effects Refinements ML18108A6681976-12-23023 December 1976 Letter Enclosing a Letter Dated December 1, 1976 Regarding the Federal Court Injunction Halting All Work on St. Lucie Unit # 2 Nuclear Plant Pending the Outcome of Hearings to Consider Alternate Sites 2015-03-27
[Table view] Category:Verbal Comm
MONTHYEARML15086A2232015-03-27027 March 2015 Summary of Meeting Concerning the Annual Assessment of St. Lucie Nuclear Plant, Units 1 and 2 ML12171A3082012-06-18018 June 2012 E-mail Re Draft Summary of 05-31-12 Phone Call ML0909705822009-04-0707 April 2009 Phone Call Summary with Licensees and Alion Science and Technology on April 2, 2009 to Address NRC Staff Position on Chemical Effects Refinements ML18108A6681976-12-23023 December 1976 Letter Enclosing a Letter Dated December 1, 1976 Regarding the Federal Court Injunction Halting All Work on St. Lucie Unit # 2 Nuclear Plant Pending the Outcome of Hearings to Consider Alternate Sites 2015-03-27
[Table view] Category:Meeting Summary
MONTHYEARML24185A1262024-07-10010 July 2024 Summary of Meeting with Florida Power and Light on License Amendment Requests Regarding the Spent Fuel Criticality Analysis in Support of Planned Transition to 24-Month Fuel Cycles for St. Lucie, Unit 2 ML24128A2102024-05-0707 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting Regarding Saint Lucie ML23166A0042023-06-15015 June 2023 Summary of Meeting Concerning 2023 Annual Assessment of the Saint Lucie and the Turkey Point Nuclear Plants ML23107A2312023-04-18018 April 2023 Summary Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23069A0282023-03-15015 March 2023 Summary of January 31, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23066A0872023-03-15015 March 2023 Summary of Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML23044A4172023-03-0606 March 2023 Summary of January 17, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests ML22357A0742023-01-19019 January 2023 Summary of December 1, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests ML22350A7082023-01-17017 January 2023 Summary of November 21, 2022, Presubmittal Meeting with Florida Power and Light on St. Lucie License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML22327A2402022-12-0808 December 2022 Summary of October 27, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests ML22263A0122022-09-27027 September 2022 Summary of August 29, 2022, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Requests (EPID Nos. L-2021-LLI-0000 and L 2021 Lli 0002) ML22144A0022022-09-14014 September 2022 Summary of February 16, and May 18, 2022, Meetings with Nextera Energy/Florida Power & Light Company Regarding Planned Submittal of License Amendment Request for a Common Fleet Emergency Plan ML22229A5252022-08-24024 August 2022 Summary of August 11, 2022, Mtg. with Florida Power & Light/Nextera on St. Lucie and Turkey Point Improved Technical Specification Conversion License Amendment Request (EPIDs L-2021-LLI-0000 & -0002) ML22145A3932022-05-25025 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting 20220434 ML22020A4032022-02-0707 February 2022 Summary of November 17, 2021, Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests (EPIDs L-2021-LLI-0000 and L-2021-LLI-0002) ML22020A4052022-01-24024 January 2022 Summary of January 14, 2022, Teleconference with Florida Power & Light Co. Regarding Verbal Authorization of Request for Alternative to the Requirements of ASME Code for Examination of Closure Head CEDM Housing 27 Canopy Seal Weld ML21342A3752022-01-0606 January 2022 Summary of Meeting with Florida Power and Light/Nextera on Proposed Improved Technical Specification Conversions ML21337A1962021-12-16016 December 2021 Public Scoping Meeting Summary for the Environmental Review of the Subsequent License Renewal Application for St. Lucie Plant, Units 1 and 2 ML21337A2062021-11-0303 November 2021 Environmental Scoping Meeting Related to the St. Lucie Plant, Units 1 and 2, Subsequent License Renewal Application ML21173A2922021-07-0909 July 2021 5-20-21 St. Lucie Plant Units 1 & 2 Subsequent License Renewal Environmental Pre-Application Meeting Summary ML21176A0552021-06-29029 June 2021 Subsequent License Renewal Application - 2nd Public Meeting Summary of Pre-Submittal Meeting ML21159A1352021-06-0808 June 2021 Public Meeting Summary Regarding the Saint Lucie Nuclear Plant, Units 1 and 2, Docket No. 50-335 and 389, and the Turkey Point Nuclear Generating Station Units 3 and 4, Docket No. 50-250 and 50-251; Meeting Number 20210505 ML21127A2182021-05-11011 May 2021 Subsequent License Renewal Application - Public Meeting Summary of Pre-Submittal Meeting ML21092A1022021-04-13013 April 2021 Summary of Pre-Application Meeting to Discuss Planned License Amendments Regarding Conversion to Improved Technical Specifications for the Turkey Point Nuclear Generating, Unit Nos.3 and 4 and St. Lucie Plant, Unit Nos. 1 and 2 Facilities ML20044E6802020-02-20020 February 2020 Summary of February 10, 2020, Teleconference with Florida Power and Light Company St, Lucie, Unit 2 - Regarding Verbal Authorization of Request to Use ASME Code Case N-513-4 for Alternate Repair of Intake Cooling Water System ML20034F2862020-02-0303 February 2020 Summary of January 29, 2020, NRC-NMFS Teleconference Regarding St. Lucie Endangered Species Act Consultation ML19221B6742019-08-13013 August 2019 Summary of Teleconference with Florida Power & Light Company Regarding Verbal Authorization of Request for Alternative Repair of the 2B Boric Acid Makeup Pump ML19149A5942019-07-0808 July 2019 Summary of March 13, 2019, Meeting with Florida Power & Light Company Regarding a Planned License Amendment Request for St. Lucie Plant, Unit 2 ML19121A6102019-05-0101 May 2019 Public Meeting Summary - St Lucie Nuclear Plant, Docket Nos. 50-389 and 50-335 ML18242A3552018-09-21021 September 2018 Summary of Meeting with Florida Power & Light Company Regarding Planned License Amendment Requests for Turkey Point Nuclear Generating Unit Nos. 3 and 4 and St. Lucie Plant, Unit Nos. 1 and 2 ML18136A9052018-05-31031 May 2018 Summary of April 25, 2017, Meeting with Florida Power & Light Company/Nextera Energy Regarding Planned Submittal of Exemption Requests to Support Closure of NRC Generic Safety Issue 191/NRC Generic Letter 2004-02 ML18135A2462018-05-31031 May 2018 Summary of April 24, 2018, Meeting with Florida Power & Light Company/Nextera Energy Regarding Planned Submittal of License Amendment Request to Adopt Standard Technical Specification 3.0.6 ML18144A1452018-05-24024 May 2018 Public Meeting Summary - St. Lucie Nuclear Plant Docket Nos. 50-335 and 50-389 ML18122A1952018-05-17017 May 2018 Summary of Meeting with Florida Power & Light Company Regarding a Planned License Amendment Request for St. Lucie Nuclear Plant Unit 2 ML17310B2062017-11-20020 November 2017 Summary of September 20, 2017, Meeting with Florida Power & Light Company and NextEra Energy Regarding Closure of NRC Generic Safety Issue 191/NRC Generic Letter 2004-02 ML17291A0452017-11-0606 November 2017 Summary of Meeting with Florida Power and Light Company, Regarding Planned License Amendment Requests for St. Lucie Plants, Units 1 and 2 and Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML17216A1732017-09-0707 September 2017 Notice of Meeting with Florida Power & Light Company and NextEra Energy to Discuss Closing Out Generic Safety Issue-191 and Generic Letter 2004-02 ML16097A1302016-04-0404 April 2016 March 29, 2016 Summary of Public Meeting - 2015 Annual Assessment Regarding Saint Lucie ML15188A3402015-07-13013 July 2015 Summary of Closed Meeting with Florida Power and Light Company and Areva Regarding Request for Additional Information for the License Amendment and Exemption Requests Re. the Transitioning to Areva Fuel ML15086A2232015-03-27027 March 2015 Summary of Meeting Concerning the Annual Assessment of St. Lucie Nuclear Plant, Units 1 and 2 ML14163A6522014-06-19019 June 2014 Summary of May 29, 2014, Public Meeting with NextEra Energy, Inc. and Florida Power & Light Company Regarding Proposed Amendment to Transition Fuel Type at St. Lucie Unit 2 ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13107B4002013-04-17017 April 2013 Summary of Public Meeting, Florida Power & Light, St. Lucie Nuclear Plant ML13095A3472013-04-11011 April 2013 3/14/2013 - Summary of Meeting with Florida Power & Light Co., to Discuss Insights About the Performance of the Steam Generators at St. Lucie Plant, Unit No. 2 After Three Operating Cycles ML13084A0302013-04-0404 April 2013 9/13/2012 - Summary of Conference Call with Florida Power & Light Co. Re. the Findings of the Fall 2012 Steam Generator Tube Inspections at Saint Lucie Plant, Unit No. 2 ML13077A4482013-03-27027 March 2013 7/27/11 Summary of Conference Call with Florida Power and Light Co. Re Findings of the Spring 2011 SG Tube Inspections for St. Lucie Unit 2 ML12326A8162012-11-21021 November 2012 11/9/2012 - Summary of Meeting with the Florida Power and Light Company Regarding the St. Lucie Nuclear Plant ML12258A0802012-09-14014 September 2012 NRC Conference Call St. Lucie Unit 2 Steam Generator Inspection September 13, 2012 ML12171A3082012-06-18018 June 2012 E-mail Re Draft Summary of 05-31-12 Phone Call 2024-07-10
[Table view] |
Text
From: Klett, Audrey To: "SLIDER, James" Cc: Balazik, Michael
Subject:
Draft Summary of 05-31-12 Phone Call.docx Date: Monday, June 18, 2012 8:13:00 AM Attachments: Draft Summary of 05-31-12 Phone Call.docx Hi Jim, Attached is a draft summary of the May 31st phone call we had had with FP&L. Please let me know if youd like to provide comments or an enclosure/attachment containing any notes on industrys perspectives.
Phone Call Summary:
On Thursday, May 31, 2012 at 1:00 pm, U.S. Nuclear Regulatory Commission (NRC) staff held a teleconference with staff from the Nuclear Energy Institute (NEI) and Florida Power & Light Co. (FP&L) to obtain additional information regarding the St. Lucie Plant operators response to a scram that occurred on March 31, 2012. The teleconference was held to support resolution of a Reactor Oversight Process (ROP) performance indicator program frequently asked question (FAQ). FAQ 12-03 was submitted to the NRC during an ROP working group public meeting held on May 2, 2012 (ML12144A235). NEI staff provided the NRC a revision of the FAQ on May 31, 2012 (ML12153A230) after this teleconference.
NRC staff requested that FP&L staff discuss actions taken and decisions made pertaining to the emergency operating procedures (EOPs) used following the scram. The EOPs referenced during the teleconference were EOP-01, Standard Post-Trip Actions, EOP-02, Reactor Trip Recovery, and EOP-05, Excess Steam Demand (ESD).
NRC staff requested FP&L staff to summarize the actions and decisions made in EOP-01 while focusing on issues involving reactor coolant system (RCS) temperature. FP&L staff confirmed that plant equipment was restoring RCS average temperature (Tavg) to between 525 and 535 degrees Fahrenheit (°F) during implementation of EOP-01. FP&L staff confirmed that all the questions on the left side of the EOP-01 diagnostic flowchart were answered, yes; therefore, operators were able to transition to EOP-02 without having to use another optimal recovery procedure prior to entering EOP-02. FP&L staff stated that the optimal recovery procedures consisted of EOP-02 through EOP-10.
NRC staff asked FP&L staff to describe the decision-making basis used while the operators were in EOP-02 regarding the transfer to EOP-05. NRC staff referenced EOP-02, Step 4.0.1, Confirm Diagnosis, which requires operators to verify that uncomplicated Reactor Trip Safety Function Status Check acceptance criteria are satisfied every 15 minutes. Because St Lucie operators did not meet the criteria for RCS temperature, they had to follow the contingency action for that step, which directs operators to (1) re-diagnose the event using the EOP-01 Diagnostic Flow Chart and (2) go to one of the following procedures: the appropriate Optimal Recovery Procedure or EOP-15, Functional Recovery. NRC staff asked FP&L staff why they decided to transition to EOP-05. The operators indicated that EOP-05 was appropriate because one of its entry criteria is that an ESD has occurred, and that the EOP would be used to confirm that an ESD did or would not recur. FP&L staff also stated that that because the safety function status criteria were not met in EOP-02, the operators would choose a procedure in which the safety function status criteria of that procedure would be met. NRC staff asked FP&L staff why EOP-02 requires that RCS temperature be within a band of 525 - 535 °F. FP&L staff responded that the low end of that temperature band serves to confirm that an excess cool-down is not in progress and that the upper band serves to confirm that there is not a loss of the heat sink.
NRC staff asked FP&L staff to describe the decisions made while in EOP-05 regarding the step that required operators to verify Safety Function Status Check acceptance criteria were satisfied every 15 minutes. EOP-05, Attachment 1, Safety Function Status Check Sheet, Step 6 required that RCS Tcold be stable or lowering. NRC staff asked FP&L operators about the decision basis for determining that the safety function status check criterion for RCS temperature was met given that the step requires RCS temperature to be stable or decreasing whereas the desired response of RCS temperature was to increase. FP&L staff responded that stable meant under control or performing as expected and not necessarily remaining at or near a constant temperature value. NRC staff asked FP&L staff to confirm the purpose of the EOP-
05 safety function status check for RCS temperature. FP&L staff stated that the requirement for RCS temperature to be stable or lowering was to avoid a pressurized thermal shock concern in the event that an excessive steam demand event was ongoing.
List of attendees:
Audrey Klett, NRR/DIRS/IPAB Chris Cowdrey, NRR/DIRS/IOEB Steven Rose, R2 Malcolm Widmann, R2 Philip Capehart, R2 Craig Kontz, R2 Tim Hoeg, R2 Roger Reyes. R2 Michael Donithan, R2 Jim Slider, NEI Steve Catron Eric Katzman Paul Rasmus Tim [last name?]