AUG 29 2011 FPL.

POWERING TODAY.

EMPOW.RINGTOMORROw. L-201.l-349 10 CFR 2.390 Bruno Caballero Chief Examiner, Region II U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Initial Operator Examination Outlines In accordance with the requirements ofNUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Florida Power and Light (FPL) is submitting herein the following initial license examination outlines for the Turkey Point Nuclear Plant for the December 2011 examination:

ES-201-2 Examination Outline Quality Checklist ES-201 -3 Examination Security Agreement (copy)

ES-301-1 Administrative Topics Outline (RO)

ES-301-l Administrative Topics Outline (SRO)

ES-301-2 Control Room/In-Plant Systems Outline (RO)

ES-301-2 Control Roomlln-Plant Systems Outline (SRO)

ES-301-5 Transient and Event Checklist (4 scenarios)

ES-D-1 Scenario Outlines (4 scenarios)

ES-401-2 PWR Examination Outline (RO Exam)

ES-401-2 PWR Examination Outline (SRO Exam)

ES-40 1-3 RO Generic Knowledge and Abilities Outline ES-401-4 Record of Rejected K/As Requested Plant Reference Material (3 disks)

Requested Electronic Exam Material (1 disk)

Audit Exam ES-301-1 Administrative Topics Outline (RO)

Audit Exam ES-301-1 Administrative Topics Outline (SRO)

Audit Exam ES-301-2 Control Room/In-Plant Systems Outline (RO)

Audit Exam ES-301-2 Control Room/In-Plant Systems Outline (SRO)

Audit Exam ES-D-1 Scenario Outlines (4 scenarios) an FPL Group company

L-201 1-349 Page 2 Pursuant to the provisions of NUREG 1021, Revision 9, Supp. 1, the enclosed material shall be withheld from public disclosure until after the examinations are complete. Should there be any questions, please contact Mark Wilson at (305) 246-6900.

Very truly yours, Michael W Ku Vice President Turkey Point Nuclear Plant Enclosure cc: Chief, Operations Branch, Division of Reactor Safety, Region II, w/o enclosure Document Control Desk, USNRC, Washington, D.C., w/o enclosure Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant, w/o enclosure

C C

L-1

L C

C J)

S 012011 FPL.

POWERING TODAY.

EMPOWERING TOMORROW.

L-201 1-365 10 CFR 2.390 Bruno Caballero Chief Examiner, Region II U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Initial Operator Written Examination Information In accordance with the requirements of NUREG- 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Florida Power and Light (FPL) is submitting herein the following initial license examination outlines for the Turkey Point Nuclear Plant for the December 2011 examination:

ES-401-5 Written Examination Key with Reference Material for Each Question (2 Binders)

ES-401-6 Written Examination Quality Checklist Requested Electronic Exam Material (1 disk)

Pursuant to the provisions of NUREG 1021, Revision 9, Supp. 1, the enclosed material shall be withheld from public disclosure until after the examinations are complete. Should there be any questions, please contact Mark Wilson at (305) 246-6900.

Very truly yours, Michael W. K ey.

Vice President Turkey Point Nuclear Plant Enclosure cc: Chief, Operations Branch, Division of Reactor Safety, Region II, w/o enclosure Document Control Desk, USNRC, Washington, D.C., w/o enclosure Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant, w/o enclosure an FPL Group company

9

C (J1

NOV 162011 FPL POWERING TODAY. L-201 1-506 EMPOWERING TOMORROW.

10 CFR 2.390 Edwin Lea, Chief Examiner, Region II U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 1 Initial Operator Written Examination Outlines and Exams Final Submittal In accordance with the requirements ofNUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Florida Power and Light (FPL) is submitting herein the following initial license examination outlines for the Turkey Point Nuclear Plant for the December 2011 examination:

ES-201-2 Examination Quality Checklist Revised ES-20 1-3 Examination Security Agreement Revised ES-401-4 Record of Rejected K/As ES-40 1-5 Written Examination Key Revised ES-401-6 Written Exam Quality Checklist Revised Electronic Exam Material (1 disk)

Pursuant to the provisions of NUREG 1021, Revision 9, Supp. 1, the enclosed material shall be withheld from public disclosure until after the examinations are complete. Should there be any questions, please contact Mark Wilson at (305) 246-6900.

Very truly yours, Michael W. Kiley.

Vice President Turkey Point Nuclear Plant Enclosure cc: Chief, Operations Branch, Division of Reactor Safety, Region II, w/o enclosure Document Control Desk, USNRC, Washington, D.C., w/o enclosure Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant, w/o enclosure anFPLGroupcompany

L-201 1-506 ENCLOSURE FPL TURKEY POINT UNITS 3 AND 4 INITIAL OPERATOR EXAMINATION OUTLINES

DEC 012011 L-201 1-526 FPL 10 CFR 2.390 POWERING TODAY.

EMPOWERING TOMORROW.

Bruno Caballero Chief Examiner, Region II U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 1 Initial License Operator Written Examination Final Update In accordance with the requirements ofNUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Florida Power and Light (FPL) is submitting herein the following Initial License Operator Written Examination Material for the Turkey Point Nuclear Plant for the December 2011 Examination:

ES-401-5 Written Examination Key (electronic file on disc) Revised ES-40 1-6 Written Exam Quality Checklist (paper and electronic file on disc) Revised RO Written Exam (electronic file on disc) Revised SRO Written Exam (electronic file on disc) Revised Written Exam Reference Package (electronic file on disc) Revised Electronic Exam Material (1 disc)

Pursuant to the provisions of NUREG 1021, Revision 9, Supp. 1, the enclosed material shall be withheld from public disclosure until after the examinations are complete. Should there be any questions, please contact Mark Wilson at (305) 246-6900.

Very truly yours, Michael W Kiley Vice President Turkey Point Nuclear Plant Enclosure cc: Chief, Operations Branch, Division of Reactor Safety, Region II, w/o enclosure Document Control Desk, USNRC, Washington, D.C., w/o enclosure Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant, w/o enclosure an FPL Group company

L-201 1-526 ENCLOSURE FPL TURKEY POINT UNITS 3 AND 4 INITIAL OPERATOR EXAMINATION OUTLINES

To: Bruno Caballero From: Mark Similey S oint Written Exam Results Date: 12/20/2011 B run o, Enclosed is the material required to be submitted by ES-402 D.4.e, and ES-501 C.i.a.

1. Master examination no changes were required to be made to any question or distractors.
2. Master Answer Key for RO and SRO exams changed correct answer on question 61 to AID and question 80 to A. Justification is provided.
3. The original questions students had during the examination with the clarification provided by the proctor are included in package. These were clarification only and did not requiring a question change.

All High missed questions (3 or more incorrect answers on the RO section or 2 incorrect answers on the SRO section) were analyzed to ensure the question was correct and accurate as written. All questions ( 9 RO questions and 3 SRO questions) were reviewed and are valid ardorrecThnll stand without a hanquestion 61 was credited with two answers and question 80 the answer key was marked incorrectly. The high miss gueons have been reviewed with the ass along with the exaainatiQn. The initial license program will be evaluated to ensure the missed questions were not a result of a gap in the training program; AR-01717986 was generated to track these items.

5. Applicants cover sheets.
6. The original of applicants answer sheets prior to grading and one clean copy.
7. Seating chart for the exam.
8. Security Agreements The original Security Agreements are not included as it will take several weeks to meet with each person to have them sign off the agreement. Will forward these as soon as they have been completed.

A copy of the post-examination letter signed by the Site Vice-President is also included, If there is anything else needed, please contact me at 305-246- 6991.

Ope ations Initial Training Supervisor

(Th NRC LICENSE EXAM COMMENT SHEET 2011-302 TURKEY POINT INITIAL LICENSE OPERATOR EXAM Unincorporated recommendations Test Item (Question #1 Issue Recommendation Reference Comments Scena riolJ PM) 3-EOP-ES-1 .2 does not control subcooling Controlling subcooling to ensure continued is to prevent voiding Rejected RCP operation.

while depressurizing. 3-EOP-ES-1 .2 recommendation to However, minimizing Question # 3 accept distractor A as Subcooling is subcooling refers to BD-EOP-ES-1 .2 the correct answer. controlled by lowering controlling RCS pressure to depressurization to reduce RCS break reduce break flow.

flow.

Plant Simulator 3-OSP-203.1 & 2 Either Containment A single Phase A Rejected 561 O-E-28 Sht 31 F Phase A Pushbutton Manual Pushbutton recommendation to 561O-E28 Sht 31G on 3C06 will actuate Question #48 does not always close accept distractor B as 5613-E-25 Sht 32C the required all Phase A Valves, the correct answer. 5613-E-25 Sht 32D Safeguards relays on 5613-E-25 Sht 32E QR5O & 51.

NUREG-1122 K/As require the ability to to be able to monitor the cooling water supplied This question is Rejected the NUREG-1122 the Containment outside the scope of recommendation to Spray System, Question # 53 knowledge and remove the question 3-ARP-097.CR.H including system abilities for a Reactor from the exam. limitations. An alarm Operator.

setpoint is within this criteria.

TR-AA-220-F02 Revision 0 1

NRC LICENSE EXAM COMMENT SHEET 2011-302 TURKEY POINT INITIAL LICENSE OPERATOR EXAM Unincorporated recommendations The stem describes all applicable actions of 3-ONOP-049.1 have been completed.

Therefore Steam 3-ONOP-049. 1 Dumps are reset. No A correct answer is Rejected concern of no Question # 60 other additional NOT provided. correct answer.

5610-T-L1 Sht 22A operator actions have been taken.

Therefore, Steam Dumps can only be armed automatically by a turbine trip.

The stem of the question states all 3 CCW Hxs have ICW flow of 3,000 gpm.

The required flowrates per 3-NOP-019 are 3,500 per Hx with a minimum of 11,000 3-NOP-Ol 9, gpm Total. Without Clarify why TS LCO Step 2.2.4 minimum flowrates, 3.0.3 is applicable and Question # 90 the flow limitation Answer was clarified.

TS 3.7.2 & 3 the headers are affected. One header associated with ICW.

is allowed to be out of TS LCO 3.0.3 service per TS. Also, more than 2 CCW Hxs are out of service with inadequate flow.

Both conditions do not have actions, therefore LCO 3.0.3 entry is required.

TR-AA-220-F02 Revision 0 2

CD 0 CD CD 0 4.)

-I C

m

-o 0

-1, z

-I C)

-I z

-I I

z I

C.) C) m I-z Cl, C) m m 0 z

-o cj) m m

0 -I m CD 0 0.

m x

C-)

0 C) C C, m z

0

-I Cl)

I-I. I CD m

- m CD C, -1 0

3 3

CD 1

0 Cl, CD Cl) 0 D

C