2012 Prairie Island Nuclear Generating Plant Initial License Examination Forms ES-D-1
ML12166A038
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 05/22/2012
From: Mcneil D
Operations Branch III
To:
References
50-282/12-301, 50-306/12-301
Download: ML12166A038 (3)


Text

Appendix D Scenario Outline Form ES-D-1 Facility: Prairie Island Scenario No.:1 Op-Test No.: 2012301 Examiners: _D. McNeil__________________ Operators:

_M. Bielby__________________

_D. Reeser__________________

Initial Conditions: Power is level near 10%. The main generator is synched to the grid @ 10 MWe.

Turnover: _The Crew will prepare to perform a power ascension to 15% power and complete the remainder of 1C1.2 actions including transferring from the M to R sources.

Event No.

Malf.

No.

Event Type*

Event Description 1

R (RO)

Raise power to 15%

2 N (SRO)

(BOP)

Transfer on-site loads from the M to R source 3

I (RO)

TS (SRO)

Pressurizer level channel fails high 4

C (RO) 11 CV Pump trips.

5 I (RO/

BOP)

TS (SRO)

N43 Power Range NI Fails Low 6

M (ALL)

Turbine Trip occurs - Loss of All AC Power (Station Blackout) 7 C (BOP, SRO)

TDAFW Pump Auto Start Failure (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: PINGP Units 1 and 2 Scenario No.: 2 Op-Test No.: 2012301 Examiners: D. McNeil Operators:

M. Bielby :

D. Reeser Initial Conditions: Unit 1 @ ~ 225 MWe BOL, Plant Startup in Progress. Unit 2 @ 100% power, MOL Equilibrium Xenon. Repairs and testing complete on 12 MFW pump. 2nd Condensate pump is in service.

Turnover: Power is to be reduced < MWe to facilitate a common cause evaluation of the 11 MFP.

Crew will brief power reduction and MFP swapping prior to entering the simulator. Maintain Unit 2 @

100% power. Equipment OOS, Nothing abnormal, only equipment related to plant specific issues.

Event No.

Malf.

No.

Event Type*

Event Description 1

R (RO)

N (BOP)

Reduce power to < 200 MWe 2

N (SRO)

N (BOP)

Swap Running MFP (Start 12 MFP and Secure 11 MFP) 3 I (RO)

TS (SRO) 12 SG Pressure Transmitter Fails High 4

I (RO)

TS (SRO)

Pressurizer Pressure Channel Fails High 5

M (ALL) 12 SG Tube Rupture ~ 250 gpm 6

C (BOP)

C (SRO) 12 MSIV Fails to Close 7

C (BOP)

SI Pumps Fail to Auto Start 8

C (BOP) 12 MDAFW Pump Fails to Auto Start (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form-ES-D-1 Facility: Prairie Island Scenario No.: 3 Op-Test No.: 2012301 Examiners: _D. McNeil______________________ Operators: _____________________________

_M. Bielby______________________

Initial Conditions: 93% Power and stable_________________________________________________

Turnover: _TSO is waiting to direct a reduction to 90% power. When directed, the crew is expected to reduce power to ~ 90% power and then perform a condensate pump swap.

Event No.

Malf.

No.

Event Type*

Event Description 1

I (RO)

TS (SRO)

Tcold Instrument Fails High 2

R (RO)

N (BOP)

Restore Tave to Tref (Power reduction per TSO) 3 N (BOP)

Swap Condensate Pumps 4

C (RO)

TS (SRO)

Pressurizer PORV significant leakage 5

C (BOP)

Condensate Pump Trip 6

C (RO)

Reactor Fails to Auto Trip 7

M (ALL)

Main Feedwater Line Break Inside Containment 8

C (BOP)

A Train Safeguards Equipment Fails to Auto Actuate (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor