Appendix D Scenario Outline Form ES-D-1 Facility: Prairie Island Scenario No.:1 Op-Test No.: 2012301 Examiners: _D. McNeil__________________ Operators:
_M. Bielby__________________
_D. Reeser__________________
Initial Conditions: Power is level near 10%. The main generator is synched to the grid @ 10 MWe.
Turnover: _The Crew will prepare to perform a power ascension to 15% power and complete the remainder of 1C1.2 actions including transferring from the M to R sources.
Event No.
Malf.
No.
Event Type*
Event Description 1
R (RO)
Raise power to 15%
2 N (SRO)
(BOP)
Transfer on-site loads from the M to R source 3
I (RO)
TS (SRO)
Pressurizer level channel fails high 4
C (RO) 11 CV Pump trips.
5 I (RO/
BOP)
TS (SRO)
N43 Power Range NI Fails Low 6
M (ALL)
Turbine Trip occurs - Loss of All AC Power (Station Blackout) 7 C (BOP, SRO)
TDAFW Pump Auto Start Failure (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: PINGP Units 1 and 2 Scenario No.: 2 Op-Test No.: 2012301 Examiners: D. McNeil Operators:
M. Bielby :
D. Reeser Initial Conditions: Unit 1 @ ~ 225 MWe BOL, Plant Startup in Progress. Unit 2 @ 100% power, MOL Equilibrium Xenon. Repairs and testing complete on 12 MFW pump. 2nd Condensate pump is in service.
Turnover: Power is to be reduced < MWe to facilitate a common cause evaluation of the 11 MFP.
Crew will brief power reduction and MFP swapping prior to entering the simulator. Maintain Unit 2 @
100% power. Equipment OOS, Nothing abnormal, only equipment related to plant specific issues.
Event No.
Malf.
No.
Event Type*
Event Description 1
R (RO)
N (BOP)
Reduce power to < 200 MWe 2
N (SRO)
N (BOP)
Swap Running MFP (Start 12 MFP and Secure 11 MFP) 3 I (RO)
TS (SRO) 12 SG Pressure Transmitter Fails High 4
I (RO)
TS (SRO)
Pressurizer Pressure Channel Fails High 5
M (ALL) 12 SG Tube Rupture ~ 250 gpm 6
C (BOP)
C (SRO) 12 MSIV Fails to Close 7
C (BOP)
SI Pumps Fail to Auto Start 8
C (BOP) 12 MDAFW Pump Fails to Auto Start (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form-ES-D-1 Facility: Prairie Island Scenario No.: 3 Op-Test No.: 2012301 Examiners: _D. McNeil______________________ Operators: _____________________________
_M. Bielby______________________
Initial Conditions: 93% Power and stable_________________________________________________
Turnover: _TSO is waiting to direct a reduction to 90% power. When directed, the crew is expected to reduce power to ~ 90% power and then perform a condensate pump swap.
Event No.
Malf.
No.
Event Type*
Event Description 1
I (RO)
TS (SRO)
Tcold Instrument Fails High 2
R (RO)
N (BOP)
Restore Tave to Tref (Power reduction per TSO) 3 N (BOP)
Swap Condensate Pumps 4
C (RO)
TS (SRO)
Pressurizer PORV significant leakage 5
C (BOP)
Condensate Pump Trip 6
C (RO)
Reactor Fails to Auto Trip 7
M (ALL)
Main Feedwater Line Break Inside Containment 8
C (BOP)
A Train Safeguards Equipment Fails to Auto Actuate (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor