L-12-178, FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights From.

From kanterella
(Redirected from ML12163A318)
Jump to navigation Jump to search
FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights From.
ML12163A318
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 06/11/2012
From: Sena P
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-12-178
Download: ML12163A318 (2)


Text

FENOC

-_---\

76 South Main Street FirstEnergyNuclear Operating Company Akron. Ohio 44308 tufplrP.Sendlil Presidentand Chief Operating Officer J u n e11 , 2 0 1 2 L-12-178 10 cFR 50.54(f)

ATTN: DocumentControlDesk U.S.NuclearRegulatory Commission 11555Rockville Pike Rockville. MD 20852

SUBJECT:

BeaverValleyPowerStation,UnitNos.1 and2 DocketNo.50-334,LicenseNo.DPR-66 DocketNo.50-412,LicenseNo.NPF-73 Davis-Besse NuclearPowerStation DocketNo.50-346,LicenseNo.NPF-3 PerryNuclearPowerPlant DocketNo.50-440,LicenseNo.NPF-58 FENOCResponse to NRCRequestfor lnformation Pursuantto 10 CFR50.54(fl Reqardinq the Floodinq Aspectsof Recommendation 2.3 of the Near-Term TaskForce Reviewof Insiqhts fromthe Fukushima Dai-ichiAccident On March12,2012,the NuclearRegulatory Commission (NRC)issueda lettertitled, "Requestfor lnformation Pursuantto Title10 of the Codeof FederalRegulations 50.54(f)Regarding Recommendations 2.1,2.3,and9.3of the Near-Term TaskForce Reviewof Insightsfromthe Fukushima Dai-ichiAccident," to all power reactorlicensees and holdersof construction permitsin activeor deferredstatus.Enclosure 4 of the 10 CFR50.54(f)lettercontainsspecificRequested Actions,Requested lnformation, and RequiredResponses associated withRecommendation 2.3 tor FloodingWalkdowns.

ThisletterprovidesFENOC's90 day responseto the 10 CFR50.54(0letterfor Beaver ValleyPowerStation,UnitNos.1 and2 (BVPS),Davis-Besse NuclearPowerStation (DBNPS), andPerryNuclearPowerPlant(PNPP).

ForfloodingRecommendation 2.3(walkdowns), Enclosure 4 of the 10 CFR50.54(0 letterstatesthateachlicenseewillconfirmthatit intendsto usethe NRC-endorsed floodingwalkdownprocedure or providea description of the processit will use.

BeaverValleyPowerStation,UnitNos.1 and2 Davis-Besse NuclearPowerStation PerryNuclearPowerPlant L-12-178 Page2 FENOCconfirms thatit intendsto usethefloodingwalkdown procedure (NEl 12-07, Guidelinesfor PerformingVerificationWalkdownsof PlantFloodProtectionFeatures) endorsed by the NRCas the basisfor theflooding walkdowns at BVPS,DBNPS,and PNPP.

Thislettercontainsno newregulatory commitments. Shouldyou haveany questions concerning -

the contentof this letter,pleasecontactMr. PhilH. Lashley,Supervisor FleetLicensing, at 330-315-6808.

I declareunderpenaltyof perjurythatthe foregoingis trueand correct.Executedon June // ,2012.

Resnec2Jlv' n D -

tuF14 PeterP. Sena.lll cc: Director,Officeof NuclearReactorRegulation (NRR)

NRCRegionI Administrator NRCRegionlll Administrator NRCResident Inspector(BVPS)

NRCResident lnspector(DBNPS)

NRCResident Inspector(PNPP)

NRRProjectManager(BVPS)

NRRProjectManager(DBNPS)

NRRProjectManager(PNPP)

DirectorBRP/DEP SiteBRP/DEPRepresentative UtilityRadiological SafetyBoard