EDO Principal Correspondence Control FROM:
DUE: 06/06/12 EDO CONTROL: G20120337 DOC DT: 05/01/12 FINAL REPLY:
Mayor Joe G. Kellejian City of Solana Beach, California TO:
Chairman Jaczko FOR SIGNATURE OF :
PRI CRC NO: 12-0206 Chairman Jaczko DESC:
ROUTING:
San Onofre Nuclear Generating Station - Safety Concerns (EDATS: SECY-2012-0251)
DATE: 05/17/12 Borchardt Weber Johnson Ash Mamish OGC/GC Collins, RIV Zobler, OGC
- Bowman, OEDO ASSIGNED TO:
NRR CONTACT:
Leeds SPECIAL INSTRUCTIONS OR REMARKS:
rT-2!d 5C-oC sEs/6
EDATS Number: SECY-2012-0251 Source: SECY Genra Inomto Assigned To: NRR Other Assignees:
Subject:
San Onofre Nuclear Generating Station - Safety Concerns
==
Description:==
OEDO Due Date: 6/6/2012 11:00 PM SECY Due Date: 6/8/2012 11:00 PM CC Routing: RegionlV; OGC ADAMS Accession Numbers -
Incoming: NONE Response/Package: NONE OhrInformatio Cross Reference Number: G20120337, LTR-12-0206 Related Task:
File Routing: EDATS Staff Initiated: NO Recurring Item: NO Agency Lesson Learned: NO OEDO Monthly Report Item: NO I,
Prcs Inomtn I
Action Type: Letter Signature Level: Chairman Jaczko Approval Level: No Approval Required OEDO Concurrence: YES OCM Concurrence: NO OCA Concurrence: NO Special Instructions:
Priority: Medium Sensitivity: None Urgency: NO Originator Name: Mayor Joe G. Kellejian Date of Incoming: 5/1/2012 Originating Organization: City of Solana Beach, Document Received by SECY Date: 5/17/2012 California Addressee: Chairman Jaczko Date Response Requested by Originator: NONE Incoming Task Received: Letter Page 1 of l
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: May 17, 2012 10:05 PAPER NUMBER:
ACTION OFFICE:
LTR-12-0206 EDO LOGGING DATE: 05/08/2012 AUTHOR:
AFFILIATION:
ADDRESSEE:
SUBJECT:
ACTION:
DISTRIBUTION:
LETTER DATE:
ACKNOWLEDGED SPECIAL HANDLING:
Joe Kellejian, Mayor, Solana Beach CA Gregory Jaczko Concerns the safety of the San Onofre Nuclear Generating Station Signature of Chairman RF, SECY to Ack 05/01/2012 No NOTES:
FILE LOCATION:
ADAMS DATE DUE:
0 92012 DATE SIGNED:
EDO -- G20120337
QCITY OF SOLANA BEACH 635 SOUTH HIGHWAY 101 SOLANA BEACH, CALIFORNIA 92075-2215 o
(858) 720-2400 www.ci.solana-beach.ca.us FAX (858) 792-6513 / (858) 755-1782 May 1, 2012 The Honorable Gregory Jaczko Chairman U.S. Nuclear Regulatory Commission Mail Stop O-16G4 Washington, D.C. 20555-0001
Dear Chairman Jaczko:
There has been increased interest and focus in the Southern California region on the San Onofre Nuclear Generating Station since the tragic March 2011 earthquake and tsunami that struck Japan's coastline and the resulting destruction of the Fukushima-Dalichi Nuclear Generating Station and radiation release.
The City of Solana Beach, a coastal community located in San Diego County, is located approximately 30 miles from the San Onofre Nuclear Generating Station (SONGS).
While the nuclear power generating industry has generally provided electricity safely and reliably, we know that an incident at a nuclear power generating facility can have devastating and generational consequences, as witnessed in Chernobyl and most recently in Japan. There are approximately 7.4 million people living within a 50-mile radius of SONGS. A catastrophic operational incident there, whether caused by natural events such as an earthquake or an event caused by equipment malfunction or human error, would render this densely populated area located in Southern California a virtual wasteland.
There have been several operational safety issues over the past years at SONGS. The most recent issue occurred this past January. As we are sure you are aware, on January 3 1st of this year it was discovered that the Unit 3 nuclear generating reactor steam generator tubes, which had been installed in the last two years, experienced significant premature wear and developed small leaks.
Southern California Edison, the operator of SONGS, shut down the electrical power-generating unit as soon as the leaks and release of radiation were detected. Very recently it was discovered that the steam generator tubes in Unit 2, which had been shut down for maintenance, have also experienced premature wear. These nuclear reactor power generating reactor units remain out of service until the cause is determined for the premature wear and a solution is developed and approved to repair the steam generators tubes.
One of the primary responsibilities of local government is the public safety and the welfare of its citizens. The City Council of Solana Beach takes this responsibility very seriously. With the recent events that occurred in Japan and the recent troubling events that have occurred at SONGS, the City Council believes that it's important that not only are these steam generators repaired once the cause is determined and addressed, but that it is imperative based on the tragic incidents that have occurred
Chairman Jaczko May 1, 2012 Page 2 at the Fukushima-Dalichi Nuclear Generating Station that a more comprehensive study of SONGS and its operations be conducted before either unit is brought back online. The consequences of a disaster at the facility are far too great not to take this time to assure that all reasonable safety precautions have been taken.
As the local elected representatives for the citizens of the City of Solana Beach, we, the City Council of Solana Beach, respectfully request that you, as the chairman of the Nuclear Regulatory Commission (NRC), and the Commission as a body:
" Support Senator Boxer and Senator Feinstein's efforts to advocate that the NRC modify its relicensing policies to ensure a full re-examination of the basics of the design elements including seismic and tsunami hazards, operational issues, plant security, and emergency preparedness.
" Support Senators Boxer and Feinstein's call for the NRC to implement the short-term recommendations of the NRC 90 Day Taskforce Report as soon as possible and that it develop a feasible more immediate plan for implementing their longer term recommendations, including expanding the evacuation zone from a 10-mile radius to a 50-mile radius as recommended in "The Lessons From Fukushima".
Public safety is government's most important responsibility; therefore, it is essential that the NRC thoroughly and expeditiously evaluate the known threats and potential risks in regards to the continuance of operations at SONGS. It is vitally important that the NRC ensures that SONGS and the infrastructure that support the facility and its operations are adequately constructed and maintained and that the personnel who work at the facility, are trained and prepared to prevent accidents from happening whether they're caused by natural or manmade events, or an intentional act such as terrorism. In addition, it is critical that the NRC assures that emergency plans are sufficient to ensure the protection and safety of the 7.4 million residents living within a 50-mile radius of the facility if the unthinkable were to happen.
Thank you for your prompt attention to this very important matter.
Respectfully, Joe Kellejian David W Roberts Mayor Deputy Mayor Mike Nichols Thomas M Campbell Lesa Heebner Council Member Council Member Council Member cc: Kristine L Svinicki, Commissioner George Apostolakis, Commissioner William D Magwood, IV, Commissioner William C Ostendorff, Commissioner