UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 17, 2012 Mr. Jon A. Franke Vice President, Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708
SUBJECT:
CRYSTAL RIVER, UNIT 3 - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Franke:
On July 9, 2012, the Nuclear Regulatory Commission (NRC) will begin inspection activities at the Crystal River Nuclear Plant, Unit 3, in accordance with Temporary Instruction (TI) 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. This on-site inspection is scheduled to be performed from July 9 to July 11, 2012, and will address the inspection requirements for Phase 1 of this TI.
In order to minimize the impact to your on-site resources, and to ensure a productive inspection, we have enclosed a list of documents needed for the preparation and implementation of this inspection. The documents that are requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase 1 of this inspection.
We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Mr. Dennis Herrin of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Cecil Fletcher at 404-997-4402 or cecil.fletcher@nrc.gov.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its Enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide
2 FPC Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/ adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Steven J. Vias, Chief Engineering Branch 3 Division of Reactor Safety Docket No.
50-302 License No.
Enclosure:
Temporary Instruction (TI 2515-182) Inspection Document Request cc w/encl: (See page 3 and 4)
ML12138A024 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS/EB3 RII:DRS/EB3 SIGNATURE CMF1 SJV NAME C. Fletcher S. Vias DATE 5/ 16 /2012 5/ 16 /2012 E-MAIL COPY YES NO YES NO
FPC 3
cc w/encl:
Kelvin Henderson General Manager Nuclear Fleet Operations Progress Energy Electronic Mail Distribution Robert J. Duncan II Vice President Nuclear Operations Progress Energy Electronic Mail Distribution Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution Terry Hobbs Plant General Manager Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Stephen J. Cahill Director - Engineering Nuclear Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution R. Alexander Glenn General Counsel Progress Energy Electronic Mail Distribution Jeffrey R. Swartz Director Site Operations Crystal River Nuclear Plant Electronic Mail Distribution Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim)
Progress Energy Electronic Mail Distribution Thomas Sapporito Consulting Associate (Public Correspondence Only)
Post Office Box 8413 Jupiter, FL 33468 William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Daniel R. Westcott Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B)
Electronic Mail Distribution Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution Jack E. Huegel Manager, Nuclear Oversight Crystal River Nuclear Plant Electronic Mail Distribution David T. Conley Senior Counsel Legal Department Progress Energy Electronic Mail Distribution Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Crystal River Nuclear Generating Plant U.S. NRC 6745 N Tallahassee Rd Crystal River, FL 34428 Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050 cc w/encl: (continued on page 4)
4 FPC cc w/encl: (continued from page 3)
Bryan Koon Director Florida Division of Emergency Management Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250
Enclosure TI 2515-182 INSPECTION DOCUMENT REQUEST Inspection Dates:
July 9 - 11, 2012 Inspection Procedures:
TI 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Inspector:
Cecil Fletcher, Senior Reactor Inspector A. Information Requested for the In-Office Preparation Week
- 1. The following documents listed below are requested (electronic copy or CD ROM if possible) by June 25, 2012, to facilitate the preparation for the on-site inspection week.
- a. Site point(s) of contact responsible for the implementation of the underground piping and tanks program; and
- b. Schedule for completion of the following NEI 09-14, Guideline For The Management of Underground Piping and Tank Integrity, Revision 1, attributes:
Buried Piping Procedures and Oversight Risk Ranking Inspection Plan Plan Implementation Asset Management Plan Underground Piping and Tanks Procedures and Oversight Prioritization Condition Assessment Plan Plan Implementation Asset Management Plan
2 B. Information to Be Provided On-Site to the Inspector at the Entrance Meeting
- 1. Copy of EPRI document Recommendations for an Effective Program to Control the Degradation of Buried Pipe.
- 2. Copy of Site Underground Piping and Tanks Program.
- 3. Self or third party assessments of the Underground Piping and Tanks Program (if any have been performed).
- 4. For any of the NEI 09-14, Revision 1, or subsequent revision attributes identified below which have been completed prior to the NRCs on-site inspection, provide written records that demonstrate that the program attribute is complete.
Buried Piping Procedures and Oversight Risk Ranking Inspection Plan Plan Implementation Asset Management Plan Underground Piping and Tanks
- Procedures and Oversight
- Prioritization
- Condition Assessment Plan
- Plan Implementation
- Asset Management Plan