Text
May 9, 2012
Mr. Peter Dietrich
Senior Vice President and
Chief Nuclear Officer
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION - NOTIFICATION OF
INSPECTION (NRC INSPECTION REPORT 05000361/2012003 AND
05000362/2012003) AND REQUEST FOR INFORMATION
Dear Mr. Dietrich:
From June 18-29, 2012, Reactor Inspectors from NRCs Region IV office will perform the
baseline inspection of changes, tests, experiments, and permanent plant modifications at
San Onofre Nuclear Generating Station, Units 2 and 3, using NRC Inspection
Procedure 71111.17, Evaluations of Changes, Tests, Experiments, and Permanent Plant
Modifications.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Upon review of these documents, the inspectors will select additional documentation for review
upon arrival. It is important that all of these documents are up-to-date and complete in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. David Axline of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, Mr. Ron Kopriva, at 817-200-1104 or by email at
Ron.Kopriva@nrc.gov.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
RE G IO N I V
1600 EAST LAMAR BLVD
ARLINGTON, TEXAS 76011-4511
P. Dietrich
- 2 -
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos. 0500050361, 0500050362
Enclosure:
Evaluations of Changes, Tests, or Experiments and
Permanent Plant Modifications Document Request
Electronic Distribution for SONGS
P. Dietrich
- 3 -
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Acting Director (Tom.Blount@nrc.gov)
DRS Acting Deputy Director (Patrick.Louden@nrc.gov)
Senior Resident Inspector (Greg.Warnick@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov)
Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)
SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)
Project Engineer, DRP/D (David.You@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Randy.Hall@nrc.gov)
Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
RIV/ETA: OEDO (Michael.McCoppin@nrc.gov)
R:\\_REACTORS\\_SONGS\\2012\\SO2012003 RFI-RAK
SUNSI Rev Compl.
- Yes No
- Yes No
Reviewer Initials
TRF
Publicly Avail
- Yes No
Sensitive
Yes : No
Sens. Type Initials
TRF
R:IV/DRS/EB1
C:EB1
RKopriva
TFarnholtz
/RA/
/RA/
5/9/2012
5/9/2012
OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax
- 1 -
Enclosure
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification
Inspection Dates:
June 18-29, 2012
Inspection Procedures:
IP 71111.17 Evaluation of Changes, Tests, or Experiments and
Permanent Plant Modifications
Inspectors:
Ron Kopriva, Senior Reactor Inspector, Lead Inspector
Brian Correll, Reactor Inspector
TBD, Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (Certrec database preferred), in care of Ron Kopriva, by June 4, 2012, to facilitate the
selection of specific items that will be reviewed during the onsite inspection week. The
inspectors will select specific items from the information requested below and then request from
your staff additional documents needed during the onsite inspection weeks. We ask that the
specific items requested be available and ready for review on the first day of inspection. Also,
we request that you categorize the documents in your response with the numbered list below.
Please provide requested documentation electronically if possible. If requested documents are
large and only hard copy formats are available, please inform the inspector(s), and provide
subject documentation during the first day of the onsite inspection. If you have any questions
regarding this information request, please call the lead inspector as soon as possible.
1. A list with descriptions of all 50.59 screenings (or equivalent) performed since
September 2009 which did not result in an evaluation. Note: Description of screenings
should be brief, but of sufficient detail so that inspectors can determine the significance
of the issue.
2. A list with descriptions of all 10 CFR 50.59 evaluations performed which did not result in
an application for license amendment to NRC from September 2009 to the present.
Note: Description of evaluations should be brief, but of sufficient detail so that
inspectors can determine the significance of the issue.
3. San Onofre Nuclear Generating Station, Units 2 and 3, procedure(s) for conducting
10 CFR 50.59 screenings and evaluations.
4. A list with descriptions of all Corrective Action documents related to 50.59 activities,
including screenings and evaluations from September 2009 to the present.
5. A list with descriptions of all permanent plant modifications dating from September 2009.
Include sufficient detail to enable the inspector to determine the significance of each
modification. For this inspection, permanent plant modifications include permanent plant
changes, design changes, setpoint changes, procedure changes, equivalency
evaluations, suitability analyses, calculations, and commercial grade dedications.
- 2 -
Enclosure
6. San Onofre Nuclear Generating Station, Units 2 and 3, procedure for implementing and
controlling permanent plant modifications.
7. A list with descriptions of all Corrective Action documents related to your permanent
plant modification program and its implementation since September 2009. Include
sufficient detail to enable the inspector to determine the significance of each
modification.
8. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including
qualification dates.
9. A listing of personnel qualified to review and approve 50.59 screenings and/or
evaluations, including qualification dates.
Inspector Contact Information:
Senior Reactor Inspector
Reactor Inspector
Reactor Inspector
817-200-1104
817-200-1565
Ron.Kopriva@nrc.gov
Brian.Correll@nrc.gov
Mailing Address:
US NRC Region IV
Attn: Ron Kopriva
1600 E. Lamar Blvd.
Arlington, TX 76011