ML12129A338

From kanterella
Jump to navigation Jump to search
Notification of NRC Inspection and Request for Information
ML12129A338
Person / Time
Site: McGuire, Mcguire  
Issue date: 05/08/2012
From: Vias S
NRC/RGN-II/DRS/EB3
To: Repko R
Duke Energy Carolinas
Linda Gruhler 404-997-4614
References
TI 2515-182
Download: ML12129A338 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 8, 2012 Mr. Regis T. Repko Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station MG01VP/12700 Hagers Ferry Road Huntersville, NC 28078

SUBJECT:

MCGUIRE NUCLEAR STATION - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Repko:

On June 25, 2012, the Nuclear Regulatory Commission (NRC) will begin inspection activities at your McGuire Nuclear Station in accordance with temporary instruction (TI) 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. This on-site inspection is scheduled to be performed from June 25 to June 27, 2012, and will address the inspection requirements for Phase 1 of this TI.

In order to minimize the impact to your on-site resources, and to ensure a productive inspection, we have enclosed a list of documents needed for the preparation and implementation of this inspection. The documents that are requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase 1 of this inspection.

We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Mr. Jeff Ashley, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Robert Williams Jr. at (404) 997-4664 or robert.williams@nrc.gov.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its Enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system

2 DEC (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/

adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by Joel Rivera-Ortiz Acting For/

Steven J. Vias, Chief Engineering Branch 3 Division of Reactor Safety Docket No.

50-369 and 50-370 License No.

NPF-9 and NPF-17

Enclosure:

Temporary Instruction (TI 2515-182)

Inspection Document Request cc w/encl: (See page 3)

ML12129A338 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS/EB3 RII:DRS/EB3 RII:DRS/EB3 SIGNATURE REW1/ via email CMF1/via email JER6 / Joel Rivera For NAME R. Williams C. Fletcher S. Vias DATE 4/ 30 /2012 4/ 27 /2012 5/ 8 /2012 E-MAIL COPY YES NO YES NO YES NO

DEC 3

cc w/encl:

Beth J. Horsley Wholesale Customer Relations Duke Energy Corporation Electronic Mail Distribution Charles J. Thomas Fleet Licensing Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Clark E. Curry Engineering Manager McGuire Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution David A. Cummings Associate General Counsel Duke Energy Corporation Electronic Mail Distribution H. Duncan Brewer Safety Assurance Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Kay L. Crane Senior Licensing Specialist McGuire Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution Luellen B. Jones Fleet Licensing Engineer Duke Energy Carolinas, LLC Electronic Mail Distribution M. Christopher Nolan Fleet Safety Assurance Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Steven D. Capps Station Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Peter Schuerger Training Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Kenneth L. Ashe Regulatory Compliance Manager Duke Energy Carolinas, LLC Electronic Mail Distribution Lara S. Nichols Vice President-Legal Duke Energy Corporation Electronic Mail Distribution David A. Repka Winston Strawn LLP Electronic Mail Distribution County Manager of Mecklenburg County 720 East Fourth Street Charlotte, NC 28202 Richardson, Alicia Licensing Administrative Assistant Duke Energy Corporation Electronic Mail Distribution W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution David A. Baxter Vice President, Nuclear Engineering General Office Duke Energy Carolinas, LLC Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission William B. McGuire Nuclear Station U.S. NRC 12700 Hagers Ferry Rd Huntersville, NC 28078

Enclosure TI 2515-182 INSPECTION DOCUMENT REQUEST Inspection Dates:

June 25-27, 2012 Inspection Procedures:

TI 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Inspector:

Robert Williams Jr., Reactor Inspector A. Information Requested for the In-Office Preparation Week

1. The following documents listed below are requested (electronic copy or CD ROM if possible) by June 18, 2012, to facilitate the preparation for the on-site inspection week.
a. Site point(s) of contact responsible for the implementation of the underground piping and tanks program; and
b. Schedule for completion of the following NEI 09-14, Guideline For The Management of Underground Piping and Tank Integrity, Revision 1 attributes:

Buried Piping Procedures and Oversight Risk Ranking Inspection Plan Plan Implementation Asset Management Plan Underground Piping and Tanks Procedures and Oversight Prioritization Condition Assessment Plan Plan Implementation Asset Management Plan

2 B. Information to Be Provided On-Site to the Inspector at the Entrance Meeting

a. Copy of EPRI document Recommendations for an Effective Program to Control the Degradation of Buried Pipe.
b. Copy of Site Underground Piping and Tanks Program.
c. Self or third party assessments of the Underground Piping and Tanks Program (if any have been performed).
d. For any of the NEI 09-14 Revision 1 or subsequent revision attributes identified below which have been completed prior to the NRCs onsite inspection, provide written records that demonstrate that the program attribute is complete.

Buried Piping Procedures and Oversight Risk Ranking Inspection Plan Plan Implementation Asset Management Plan Underground Piping and Tanks

  • Procedures and Oversight
  • Prioritization
  • Condition Assessment Plan
  • Plan Implementation
  • Asset Management Plan