MONTHYEARML24030A0672024-01-26026 January 2024 Email EA Fonsi Notice to Kewaunee Solutions for Exemptions on Site Restoration Activities ML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23134A0012023-05-0909 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305) ML23129A0672023-05-0505 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request for Low-Level Radioactive Waste Transport Change from 20 to 45 Days Acknowledgement ML23100A0032023-04-0404 April 2023 Solutions - Acknowledgement Email Regarding Exemption Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No 50-305) ML23094A1442023-03-31031 March 2023 Solutions - Acknowledgement Email Regarding Exemption for Low-Level Radioactive Waste Transport within 20 Days (Docket No. 50-305) ML22108A1762022-04-14014 April 2022 E-mail: Proposed Order Conditions for In-Direct Transfer of Licenses Held by Energysolutions, LLC (Zion, TMI Unit-2, La Crosse Boiling Water Reactor, Kewaunee, Energysolutions Radioactive Materials License, and Energysolutions Export Licens ML22053A2992022-02-18018 February 2022 Email - Additional Time for Request for Additional Information Response Regarding Kewaunee Solutions Decommissioning Quality Assurance Program; NRC Response Included; (EPID L-2021-LLO-0002 and L-2021-DP3-0000) ML22027A3642022-01-26026 January 2022 KPS: CY2022 Inspection Plan, Docket No. 05000305, License No. DPR-43 ML22007A3182022-01-0707 January 2022 E-mail from C. Adams, State of Wisconsin, to K. Sturzebecher, NRC, Notification and Request Kewaunee Power Station License Transfer (L-2021-LLO-002) ML21348A0522021-12-0303 December 2021 E-mail to P. Schmidt, State of Wisconsin, from K. Sturzebecher, NRC - Notification and Request Kewaunee Power Station License Transfer ML21096A1332021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Dominion Energy Exemptions for the Magnastor Storage Cask ML20015A3002020-01-14014 January 2020 KPS: CY2020 Master Inspection Plan ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19072A0652019-03-0606 March 2019 Conversation Record with T. Szymanski/Dominion Energy Response to 10 CFR 72.30(c)(3) in Triennial Update for Kewaunee ML19070A2642019-03-0505 March 2019 Email Conversation with T. Szymanski/Dominion Energy Decommissioning Funding Plan (Dfp): Kewaunee ML18351A2742018-12-17017 December 2018 KPS: CY2019 Master Inspection Plan ML17354A9382017-12-20020 December 2017 CY2018 Master Inspection Plan ML17156A0032017-06-0202 June 2017 NRR E-mail Capture - Acceptance for Review of Revision 24 to the Dominion Nuclear Facility Quality Assurance Program Description (QAPD) Topical Report (CAC Nos. MF9732-MF9739) ML17040A0222016-10-18018 October 2016 Wisconsin State Notification (LAR259-L53082) ML16287A7142016-10-13013 October 2016 E-mail - Request for Additional Information: Dominion Energy Kewaunee, Dominion Nuclear Connecticut and Virginia Electric Power Company Nuclear Facility Quality Assurance Program Description Topical Report ML16041A2732016-02-10010 February 2016 Final RAIs Regarding LAR 259 ML16054A2382015-10-14014 October 2015 E-44108 Attachment 8 E-mail from Stewart J. Yuen (Kewaunee Power Station) to Don Shaw (Areva) for Kewaunee Power Station ML15090A4872015-03-26026 March 2015 OEDO-15-00251 - Michael Mulligan, Citizen Ltr 2.206 - Emergency Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power Plants ML15071A2752015-03-12012 March 2015 NRR E-mail Capture - Request for Additional Information on Kewaunee 50.54(p) Changes to Physical Security Plan - TAC MF5779 ML15057A2192015-02-25025 February 2015 NRR E-mail Capture - Acceptance Review: Dominion Fleet-Request for Approval of Cyber Security Plan (CSP) Revised Implementation Schedule ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14251A0972014-08-22022 August 2014 NRR E-mail Capture - Draft RAI to Kewaunee Power Station on Control Room Staffing Issue ML14164A0742014-06-0202 June 2014 NRR E-mail Capture - Draft Request for Additional Information Concerning Dek'S Request for Exemption from Conducting Annual Force-on-Force Exercises at Kewaunee Power Station ML14132A2062014-04-27027 April 2014 NRR E-mail Capture - Kewaunee Amendment Request for Emergency Plan Changes MF3411 - Draft RAIs ML14134A5872014-04-0707 April 2014 NRR E-mail Capture - Minor Editorial/Typographical Changes to License Condition TAC MF1771) ML14155A0402014-04-0707 April 2014 NRR E-mail Capture - Summarry of Kewaunee Mitigation Strategy Phone Call Last Week ML14097A5112014-04-0101 April 2014 NRR E-mail Capture - Draft RAI Related to Kewaunee Proposed Deletion of License Condition on Mitigation Strategy ML14069A3832014-03-0606 March 2014 NRR E-mail Capture - Draft RAI on Kewaunee Permanently Defueled Technical Specifications ML13312A2422013-11-0707 November 2013 NRR E-mail Capture - MF1952-RAII-SRXB-Cunana-002-2011-11-08, Request for Additional Information ML13297A0482013-10-23023 October 2013 NRR E-mail Capture - MF2567 - Kewaunee Eplan RAI #1 and Comparable Wording from Other Eplans ML13295A5672013-10-22022 October 2013 NRR E-mail Capture - MF2567 Kewaunee Exemption Nlar 102 (50.47 and 10 CFR Appendix E) Includes Kewaunee EP Briefing - 19 June 2013 Handout ML13275A0722013-10-0101 October 2013 NRR E-mail Capture - FW: MF1771-MF1952 RAI 9-27-2013.docx ML13275A0772013-10-0101 October 2013 NRR E-mail Capture - MF2743-RAII-AHPB-Keefe-001-2013-10-01 Request for Additional Information ML13275A0622013-09-27027 September 2013 NRR E-mail Capture - FW: MF2370 - Review of Training Plan for Certified Fuel Handler (CFH) Training - (Corrected) Request for Additional Information (RAI) ML13246A0032013-08-30030 August 2013 NRR E-mail Capture - Record of Docketing of Certifications Pertaining to Decommissioning of Kewaunee Power Station (KPS) ML13218B3722013-08-0606 August 2013 NRR E-mail Capture - MF1952 KPS Permanently Defueled License and TS - Request for Additional Information - MF1952-RAII-SCVB-Heida-001-2013-08-06 ML13186A0212013-07-0303 July 2013 NRR E-mail Capture - MF1771 - Correction to Stated Date Due for Request for Information Dated 6/26/2013 (ML13178A011) ML13178A0112013-06-26026 June 2013 NRR E-mail Capture - MF1771 (and Part of MF1952) - KPS - Record of Clarification Call and Associated Request for Additional Information (RAI) Deletion of License Condition 2.C.(15) ML13151A2452013-05-29029 May 2013 NRR E-mail Capture - Kewaunee Correspondence - Dispositioning Flawed Document, Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML13149A0412013-05-28028 May 2013 NRR E-mail Capture - MF1771 - Kewaunee LAR 255 Deletion of Licensing Condition 2.C.(15) - LIC-109 Acceptance Review Results ML13144A1002013-05-23023 May 2013 NRR E-mail Capture - Record of Docketing of Outgoing NRC Correspondence Serial No. 13-293: Certification of Permanent Removal of Fuel -- Confirming Successful EIE Docketing ML13134A5272013-05-14014 May 2013 NRR E-mail Capture - ML13133A086 = MF1438 - KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13133A0862013-05-10010 May 2013 NRR E-mail Capture - FW: MF1438 KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13128A3612013-05-0707 May 2013 NRR E-mail Capture - MD7112 - Record of Permanent Cessation of Operations 10CFR50.4(b)(8), 10CFR50.82, and the Scheduling of Certain Future Decommissioning Events 2024-01-26
[Table view] |
Text
From: Feintuch, Karl To: Johnson, Don; "Byrne, Thomas"; Chawla, Mahesh
Subject:
ME6508 - 2nd round RAI clarification call
====== update 2012-04-01-2215 ET ====
The conference call started at 2 PM ET on 3/30/2012 Participation:
For NRC: Karl Feintuch, Don Johnson For DAEC: Tom Byrne, Mike Davis Discussions concerned clarification of RAI items and that DAEC is considering as an option to withdraw the application and re-submit at a later time. The withdraw / resubmit option would be to address a concern about carrying out implementation while preparing for and conducting the forthcoming fall outage with its own schedule complexities.
The conference call is to resume early next or week (Monday or Tuesday) with a withdraw decision by 4/6/2012.
Cc to Mahesh Chawla as background information to coordinate conference call next week.
====== update 2012-03-28-1310 ET ====
All parties have accepted. Unless there are documents to distribute beforehand, I dont anticipate further updates before the meeting.
I anticipate an edited version of the three items below to be issued after the meeting as firm items with a specific date for response.
====== update 2012-03-28-1100 ET ====
Meeting by phone is scheduled for 3/30/2012, starting at 2 PM ET. Subject of discussion follows:
From: Feintuch, Karl Sent: Thursday, March 22, 2012 4:20 PM [See reference to 3/22 email below]
To: 'Thomas.Byrne@nexteraenergy.com'; 'Browning, Tony'
Subject:
FW: ME6508 - FW: Duane Arnold Energy Center, Response to Request for Additional Information Re: Amendment to Change Emergency Action Levels. 03/16/2012 I am preparing an email message with a 2nd RAI cycle based on your responses contained in your supplement ML12076A236 dated 3/16/2012.
The following items: <1>, <2>, and <3> were provided by NSIR reviewer (Don Johnson). I will follow with a more formal version.
The brackets you see are my current draft edits, mostly to convert from 1st to 3rd person voice and grammar. The formal version will not contain such brackets:
<1> [The reviewer] need[s] to have [the licensees] entire proposed EAL Technical Basis Document (the Document) on the docket as part of [its] response, even if they are not changing some of the sections. Please submit [this Document] so we (NRC) can re-baseline the its approval for the entire EAL scheme (as encompassed in [DAECs] EAL Technical Basis Document).
The front section, ISFSI EAL, fission barrier matrix section, and the systems section were not provided with [the recent RAI] response.
[The NRC staff needs the docketed Document in ADAMS to reference it as] the single document found acceptable for DAECs EAL Scheme. [This reference is necessary] so that future inspectors, and site licensing staff, can readily determine the approved baseline scheme when performing future 10 CFR 50.54(q) reviews/changes.
<2> The response to RAI #6, while adequate, does not answer the question, i.e., the incorporation of information to EAL EU1. Note that this EAL was not provided with this response (see <1> above.)
<3> The response to RAI #10 requires more information to support the justification for why the Control Room is not an area for consideration, as well as documenting what areas were considered and the basis for why each area was determined to be not applicable.
[We are interested in compressing the RAI response schedule. Please propose opportunities to have a clarification conference call so I (PM Feintuch) can make suitable arrangements with the reviewer. As part of the call we want to discuss scheduling.]
Please call is there are any questions, Karl Feintuch USNRC 301-415-3079
==
From: Byrne, Thomas HYPERLINK "mailto:[1]" [2]
Sent: Wednesday, March 28, 2012 9:50 AM To: Feintuch, Karl Cc: Johnson, Don; Davis, J.Michael; Helms, Lonnie; Catron, Steve
Subject:
RE: ME6508 - FW: Duane Arnold Energy Center, Response to Request for Additional Information Re: Amendment to Change Emergency Action Levels. 03/16/2012 Karl:
1400 ET (1300 CT) on Friday 3/30 should be fine. Here's the bridge line info:
305-552-3000 Passcode 8517929 We are interested in discussing the questions to ensure our understanding of what is being asked and provide a due date. No hand outs, other than the draft questions provided in your email of 3/22. Thanks Karl! [See 3/22/2012 email above-kdf 3/28/12]
Tom From: Feintuch, Karl HYPERLINK "mailto:[3]" [4]
Sent: Wednesday, March 28, 2012 8:09 AM To: Byrne, Thomas Cc: Johnson, Don; Feintuch, Karl
Subject:
FW: ME6508 - FW: Duane Arnold Energy Center, Response to Request for Additional Information Re: Amendment to Change Emergency Action Levels. 03/16/2012 We have an appointment with Don for 2 PM ET on Friday, 3/30/12. Don and I will call in from separate locations. Can you supply the bridge line? I will invite Don and you - on behalf of attending DAEC staff - to a conference call with an Outlook invitation.
If practical please respond with:
- a short statement of agenda or reference to the question(s) of concern; and
- notes or handouts to be distributed, if any (both should be non-sensitive, publically available), that Don should look at prior to your discussion.
The information will appear in the Outlook invitation or one of its update.
I understand that until Friday your opportunities to respond are limited during the day by attendance in training.
Karl Feintuch 301-415-3079
= original message ====
We have an appointment with Don for 2 PM ET on Friday, 3/30/12. The estimated duration is 15 minutes. Don and I will call in from separate locations. Can you supply the bridge line (305-552-3000 / pass code 8517929#)? With this invitation I am inviting Don and you - on behalf of attending DAEC staff - to the conference call.
If practical please respond with:
- Whether or not to use the indicated bridge line;
- a short statement of agenda or reference to the question(s) of concern; and
- notes or handouts to be distributed, if any (both should be non-sensitive, publically available), that Don should look at prior to your discussion.
Changed information will appear as an update to this invitation.
I understand that until Friday your opportunities to respond are limited during the day by attendance in training.