ML12115A049

From kanterella
Jump to navigation Jump to search
Meeting Summary
ML12115A049
Person / Time
Site: Farley  
Issue date: 04/23/2012
From: Frank Ehrhardt
NRC/RGN-II/DRP/RPB2
To: Lynch T
Southern Nuclear Operating Co
References
Download: ML12115A049 (26)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 23, 2012 Mr. T. A. Lynch Site Vice President - Farley Southern Nuclear Operating Company, Inc.

7388 North State Highway 95 Columbia, AL 36319

SUBJECT:

PUBLIC MEETING

SUMMARY

- JOSEPH M. FARLEY NUCLEAR PLANT DOCKET NOS. 50-348 AND 50-364

Dear Mr. Lynch:

This refers to the meeting conducted on April 10, 2012, in Dothan, Alabama. The purpose of the meeting/open house session was to provide opportunities to discuss the annual assessment of Joseph M. Farley Nuclear Plant with the public for the period of January 1, 2011

- December 31, 2011.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4611.

Sincerely,

/RA/

Frank Ehrhardt, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-348 and 50-364 License Nos.: NPF-2 and NPF-8

Enclosures:

1. List of Attendees
2. Poster Boards
3. Powerpoint Handout cc w/encls: (See page 2)

_ _ ML12115A049__

G SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE

/RA/

/RA By FErhardt for/

/RA By FErhardt for/

NAME FEhrhardt MMiller TLighty DATE 04/23/2012 4/23/2012 04/23/2012 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO

SNC 2

cc w/encls:

S. Kuczynski Chairman, President and CEO Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution J. L. Pemberton SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution D. G. Bost Chief Nuclear Officer Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Dennis R. Madison Vice President Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution T. E. Tynan Site Vice President Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Mark Williams Commissioner Georgia Department of Natural Resources Electronic Mail Distribution B. D. McKinney, Jr.

Regulatory Response Manager Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution D. W. Daughhetee Licensing Engineer Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution T. D. Honeycutt Regulatory Response Supervisor Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Bradley J. Adams Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution N. J. Stringfellow Licensing Manager Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution L. P. Hill Licensing Supervisor Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution L. L. Crumpton Administrative Assistant, Sr.

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution William D. Oldfield Principal Licensing Engineer Joseph M. Farley Nuclear Plant Electronic Mail Distribution Cheryl Greyheart Plant Manager Joseph M. Farley Nuclear Plant Electronic Mail Distribution John G. Horn Site Support Manager Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution (cc w/encls - contd - See page 3)

SNC 3

cc w/encls contd:

Senior Resident Inspector U.S. Nuclear Regulatory Commission Joseph M. Farley Nuclear Plant U.S. NRC P. O. Box 620 Ashford, AL 36312 Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Mark Culver Chairman Houston County Commission P. O. Box 6406 Dothan, AL 36302 James L. McNees, CHP Director Office of Radiation Control Alabama Dept. of Public Health P. O. Box 303017 Montgomery, AL 36130-3017 Donald E. Williamson State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 30317 Montgomery, AL 36130-3017 Chuck Mueller Manager Policy and Radiation Program Georgia Department of Natural Resources Electronic Mail Distribution

SNC 4

Letter to Thomas A. Lynch from Frank Ehrhardt dated April 23, 2012

SUBJECT:

PUBLIC MEETING

SUMMARY

- JOSEPH M. FARLEY NUCLEAR PLANT -

DOCKET NOS. 50-348 AND 50-364 Distribution w/encls:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMFarley Resource

NRC Strategic Plan Strategic Goals Safety: Ensure adequate protection of public health and safety and the environment.

Security: Ensure adequate protection in the secure use and management of radioactive materials.

Strategic Objectives Openness: The NRC appropriately informs and involves stakeholders in the regulatory process.

Effectiveness: NRC actions are high quality, efficient, timely, and realistic, to enable the safe and beneficial use of radioactive materials.

Operational Excellence: NRC operations use effective business methods and solutions to achieve excellence in accomplishing the agencys mission.

Nuclear Security &

Safeguards Physical Protection Security Inspections Force-on-Force Exercises Interagency Cooperation Intrusion Detection & Assessment Response &Offsite Assistance Threat Assessment Information Security Preventing Unauthorized Disclosure

Safety Review of Aging Management License Renewal Review of Environmental Impacts Opportunities for Public Participation

Spent Nuclear Fuel Safe and Secure Storage & Transport Assured By Comprehensive Regulations Detailed NRC Review Robust Cask & Package Designs Significant Experience Base Continued Oversight U.S. Independent Spent Fuel Storage Installations U.S. Independent Spent Fuel Storage Installations LEGEND Interstate Highways Railroads As of August 2007:

Disclaimer: This map provides only general information regarding the current and potential ISFSI licensees, based on various information sources that may be inexact and may change.

Browns Ferry Hatch Farley Grand Gulf River Bend Sequoyah Oconee Catawba McGuire Brunswick Robinson Surry North Anna Shearon Harris Vogtle Summer Crystal River Waterford Turkey Point St. Lucie Watts Bar Beaver Valley Fitzpatrick Nine Mile Pt Ginna 1

2 5

6 7 8

9 10 11 12 13 Northeast:

1. Maine Yankee
2. Seabrook
3. Vermont Yankee
4. Yankee Rowe
5. Pilgrim
6. Haddam Neck
7. Millstone
8. Indian Point
9. Susquehanna 10.Three Mile Island
11. Limerick
12. Peach Bottom
13. Oyster Creek
14. Hope Creek
15. Salem
16. Calvert Cliffs 16 Big Rock Point Davis Besse Perry Fermi Point Beach Kewaunee Monticello Prairie Island LaCross e

Zion Cook Palisade s

1 2

3 4

Midwest:

1. Dresden
2. GE Morris (wet)
3. Braidwood
4. Lasalle
5. Byron
6. Duane Arnold
7. Quad Cities
8. Clinton 5

6 7

8 Ft. Calhoun Cooper Callaway Wolf Creek Arkansas Nuclear One South Texas Project Comanche Peak DOE TMI-2 Storage DOE Idaho Spent Fuel Facility Private Fuel Storage Ft Saint Vrain (vault storage)

Humboldt Bay Trojan Columbia Rancho Seco Diablo Canyon San Onofre Palo Verde 31 Operating General Licensed ISFSIs at Reactor Sites 18 Reactor Sites Pursuing a General licensed ISFSI 15 Specific Licensed ISFSIs (At or Away from Reactor Sites)

[No known sites are pursuing a future Specific Licensed ISFSI]

19 reactor sites have not announced intentions regarding ISFSI 30 States have at least one ISFSI 15 14 4

3

NRC Annual Assessment Summary Southern Nuclear operated the plant safely and in a manner that preserved the public health and safety and protected the environment.

Farley Units 1 & 2 were in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2011.

Farley 2011

NRC Inspection Activities 4703 Hours of Direct Inspection and Related Activities 3929Inspection hours 774 Plant Status hours (Includes Security & Plant walkdown) 2 Resident Inspectors (RIs) on site RIs complete multiple baseline inspections and document the results in 4 quarterly integrated inspection reports RIs continuously monitor licensee activities throughout the year 1 Reactive Inspection Security Special Inspection 3 Major Regional Team Inspections Triennial Fire Protection NFP 805 Transition Problem Identification & Resolution Component Design Basis Inspection Farley 2011