ML12115A049

From kanterella
Jump to navigation Jump to search
Meeting Summary
ML12115A049
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/23/2012
From: Frank Ehrhardt
NRC/RGN-II/DRP/RPB2
To: Lynch T
Southern Nuclear Operating Co
References
Download: ML12115A049 (26)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 23, 2012 Mr. T. A. Lynch Site Vice President - Farley Southern Nuclear Operating Company, Inc.

7388 North State Highway 95 Columbia, AL 36319

SUBJECT:

PUBLIC MEETING

SUMMARY

- JOSEPH M. FARLEY NUCLEAR PLANT DOCKET NOS. 50-348 AND 50-364

Dear Mr. Lynch:

This refers to the meeting conducted on April 10, 2012, in Dothan, Alabama. The purpose of the meeting/open house session was to provide opportunities to discuss the annual assessment of Joseph M. Farley Nuclear Plant with the public for the period of January 1, 2011

- December 31, 2011.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4611.

Sincerely,

/RA/

Frank Ehrhardt, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-348 and 50-364 License Nos.: NPF-2 and NPF-8

Enclosures:

1. List of Attendees
2. Poster Boards
3. Powerpoint Handout cc w/encls: (See page 2)

_ _ ML12115A049__ G SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE /RA/ /RA By FErhardt for/ /RA By FErhardt for/

NAME FEhrhardt MMiller TLighty DATE 04/23/2012 4/23/2012 04/23/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO

SNC 2 cc w/encls:

S. Kuczynski D. W. Daughhetee Chairman, President and CEO Licensing Engineer Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution J. L. Pemberton T. D. Honeycutt SVP & General Counsel-Ops & SNC Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution D. G. Bost Bradley J. Adams Chief Nuclear Officer Vice President Southern Nuclear Operating Company, Inc. Fleet Operations Support Electronic Mail Distribution Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Dennis R. Madison Vice President N. J. Stringfellow Edwin I. Hatch Nuclear Plant Licensing Manager Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution Paula Marino L. P. Hill Vice President Licensing Supervisor Engineering Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution L. L. Crumpton T. E. Tynan Administrative Assistant, Sr.

Site Vice President Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant Electronic Mail Distribution Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution William D. Oldfield Principal Licensing Engineer M. J. Ajluni Joseph M. Farley Nuclear Plant Nuclear Licensing Director Electronic Mail Distribution Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Cheryl Greyheart Plant Manager Mark Williams Joseph M. Farley Nuclear Plant Commissioner Electronic Mail Distribution Georgia Department of Natural Resources Electronic Mail Distribution John G. Horn Site Support Manager B. D. McKinney, Jr. Joseph M. Farley Nuclear Plant Regulatory Response Manager Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution (cc w/encls - contd - See page 3)

SNC 3 cc w/encls contd:

Senior Resident Inspector U.S. Nuclear Regulatory Commission Joseph M. Farley Nuclear Plant U.S. NRC P. O. Box 620 Ashford, AL 36312 Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Mark Culver Chairman Houston County Commission P. O. Box 6406 Dothan, AL 36302 James L. McNees, CHP Director Office of Radiation Control Alabama Dept. of Public Health P. O. Box 303017 Montgomery, AL 36130-3017 Donald E. Williamson State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 30317 Montgomery, AL 36130-3017 Chuck Mueller Manager Policy and Radiation Program Georgia Department of Natural Resources Electronic Mail Distribution

SNC 4 Letter to Thomas A. Lynch from Frank Ehrhardt dated April 23, 2012

SUBJECT:

PUBLIC MEETING

SUMMARY

- JOSEPH M. FARLEY NUCLEAR PLANT -

DOCKET NOS. 50-348 AND 50-364 Distribution w/encls:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMFarley Resource NRC Strategic Plan Strategic Goals

  • Safety: Ensure adequate protection of public health and safety and the environment.
  • Security: Ensure adequate protection in the secure use and management of radioactive materials.

Strategic Objectives

  • Openness: The NRC appropriately informs and involves stakeholders in the regulatory process.
  • Effectiveness: NRC actions are high quality, efficient, timely, and realistic, to enable the safe and beneficial use of radioactive materials.
  • Operational Excellence: NRC operations use effective business methods and solutions to achieve excellence in accomplishing the agencys mission.

Enclosure 2

Nuclear Security &

Physical Protection Safeguards Security Inspections Force-on-Force Exercises Interagency Cooperation Intrusion Detection & Assessment Response &Offsite Assistance Threat Assessment Information Security Preventing Unauthorized Disclosure Enclosure 2

License Renewal Safety Review of Review of Environmental Impacts Aging Management Opportunities for Public Participation Enclosure 2

Spent Nuclear Fuel Safe and Secure Storage & Transport Assured By Comprehensive Regulations Detailed NRC Review Robust Cask & Package Designs Significant Experience Base Continued Oversight U.S. Independent Spent Fuel Storage Installations Trojan Columbia 1

Big Rock Monticello Point Nine Mile Pt 2 Kewaunee 3 DOE TMI-2 Storage Prairie Island Fitzpatrick Point 4 Ginna 5 DOE Idaho Spent Fuel Facility Beach Humboldt Bay LaCross 6

e 7 Zion Palisade 8 Fermi Perry s 9 6 5 Cook Davis Besse 7 1 Northeast:

Ft. Calhoun 10 11 13 Private Fuel Storage 4 2 Beaver Valley 1. Maine Yankee 3 12 14 2. Seabrook 15 3. Vermont Yankee Rancho Seco Ft Saint Vrain (vault storage)

Cooper 8 Midwest: 4. Yankee Rowe

1. Dresden 16 5. Pilgrim
2. GE Morris (wet) 6. Haddam Neck North Anna
3. Braidwood 7. Millstone Callaway 4. Lasalle 8. Indian Point Surry
5. Byron 9. Susquehanna Wolf Creek
6. Duane Arnold 10.Three Mile Island Diablo Canyon 7. Quad Cities 11. Limerick
8. Clinton 12. Peach Bottom Shearon Harris 13. Oyster Creek McGuire 14. Hope Creek Watts Bar
15. Salem Sequoyah Catawba Robinson 16. Calvert Cliffs San Onofre Arkansas Nuclear Oconee Browns Ferry Summer Brunswick One Palo Verde Vogtle Hatch Comanche Peak Grand Gulf Farley LEGEND As of August 2007: River Bend 31 Operating General Licensed ISFSIs at Reactor Sites Waterford Crystal River 18 Reactor Sites Pursuing a General licensed ISFSI South Texas Project 15 Specific Licensed ISFSIs (At or Away from Reactor Sites) St. Lucie

[No known sites are pursuing a future Specific Licensed ISFSI]

19 reactor sites have not announced intentions regarding ISFSI Turkey Point 30 States have at least one ISFSI Railroads Interstate Highways Disclaimer: This map provides only general information regarding the current and potential ISFSI licensees, based on various information sources that may be inexact and may change.

Enclosure 2

NRC Annual Assessment Summary Farley 2011 Southern Nuclear operated the plant safely and in a manner that preserved the public health and safety and protected the environment.

Farley Units 1 & 2 were in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2011.

Enclosure 2

NRC Inspection Activities Farley 2011 4703 Hours of Direct Inspection and Related Activities 3929Inspection hours 774 Plant Status hours (Includes Security & Plant walkdown) 2 Resident Inspectors (RIs) on site RIs complete multiple baseline inspections and document the results in 4 quarterly integrated inspection reports RIs continuously monitor licensee activities throughout the year 1 Reactive Inspection Security Special Inspection 3 Major Regional Team Inspections Triennial Fire Protection NFP 805 Transition Problem Identification & Resolution Component Design Basis Inspection Enclosure 2