Letter Sequence RAI |
|---|
|
|
MONTHYEARML12079A0342012-03-12012 March 2012 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-3-08) Project stage: Request ML1208001502012-03-19019 March 2012 Acceptance Review Email, Relief Request RR-ENG-3-08, Deferral of Code Repair of Flaws in U2 Essential Cooling Water Class 3 Piping Until Restart from Current Refueling Outage Scheduled for Mid-April 2012 Project stage: Acceptance Review ML1208200982012-03-22022 March 2012 Request for Additional Information, Relief Request RR-ENG-3-08, Deferral of Code Repair of Flaws in Essential Cooling Water Class 3 Piping Until Restart from Refueling Outage Scheduled for Mid-April 2012 Project stage: RAI ML1208200972012-03-22022 March 2012 Email, Request for Additional Information, Relief Request RR-ENG-3-08, Deferral of Code Repair of Flaws in Essential Cooling Water Class 3 Piping Until Restart from Refueling Outage Scheduled for Mid-April 2012 Project stage: RAI NOC-AE-12002829, Response to Request for Additional Information for Relief Request RR-ENG-3-08 (Essential Cooling Water System)2012-04-10010 April 2012 Response to Request for Additional Information for Relief Request RR-ENG-3-08 (Essential Cooling Water System) Project stage: Response to RAI ML12110A0852012-04-10010 April 2012 Response to Request for Additional Information for Relief Request RR-ENG-3-08 (Essential Cooling Water System) Project stage: Response to RAI ML1210403612012-04-13013 April 2012 Email, Verbal Authorization of Relief Request RR-ENG-3-08, Deferral of Code Repair of Flaws in U2 Essential Cooling Water Class 3 Piping Until Restart from Current Refueling Outage Scheduled for Mid-April 2012 Project stage: Approval NOC-AE-12002893, Amended Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System Relief Request RR-ENG-3-082012-08-0606 August 2012 Amended Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System Relief Request RR-ENG-3-08 Project stage: Request ML12228A2932012-08-0606 August 2012 Amended Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System Relief Request RR-ENG-3-08 Project stage: Request ML12201A2562012-08-16016 August 2012 Relief Request RR-ENG-3-08, Deferral of Code Repair of Flaws in U2 Essential Cooling Water Class 3 Piping Until Restart from Current Refueling Outage Scheduled for Mid-April 2012 Project stage: Approval 2012-04-10
[Table View] |
Text
From:
Singal, Balwant Sent:
Thursday, March 22, 2012 9:46 AM To:
'Harrison, Albon' Cc:
Walker, Philip; Rudland, David
Subject:
Request for Additional Information - Relief Request RR-ENG-3-08 (TAC ME8159)
Attachments:
ME8159-RAI.docx Wayne:
By letter dated March 12, 2012, (Agencywide Document Access Management System (ADAMS)
Accession No. ML12079A034), STP Nuclear Operating Company (the licensee) submitted for U.S. Nuclear Regulatory Commission (NRC) review and approval Relief Request RR-ENG-3-08 for South Texas Project (STP), Unit 2. The licensee requested relief from IWA-5250 of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code.
To complete its review, the NRC staff request for additional information (RAI) described in the attachment.
STP Nuclear Operating Company has requested for an expedited review (approval by April 7, 2012) in support of the upcoming STP, Unit 2 refueling outage. The NRC staff may not be able to process the request formally, however, it was agreed that the NRC staff will provide temporary verbal authorization as per provisions of LIC-102, Relief Request Reviews based on the results of its review. You are requested to provide a formal response to the RAI by March 29, 2012 to enable the NRC to complete its review before processing of the temporary verbal authorization. Please note that any delay in providing the responses to RAI by requested date may impact the temporary verbal authorization schedule.
Please advise if RAI clarification conference call is needed. Also, please treat this e-mail as forma request for additional information.
Thanks.
Balwant K. Singal Senior Project Manager (Comanche Peak, STP, and Palo Verde)