ML12076A161
| ML12076A161 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/14/2012 |
| From: | Brian Bonser NRC/RGN-II/DRS/PSB1 |
| To: | Franke J Progress Energy Florida |
| References | |
| IR-12-503 | |
| Download: ML12076A161 (6) | |
See also: IR 05000302/2012503
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
March 14, 2012
Mr. Jon A. Franke
Vice President, Crystal River Nuclear Plant
Crystal River Nuclear Plant (NA2C)
15760 W. Power Line Street
Crystal River, FL 34428-6708
SUBJECT:
CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NOTIFICATION
OF INSPECTION AND REQUEST FOR INFORMATION 05000302/2012503
Dear Mr. Franke:
During the period of April 30 - May 4, 2012, the NRC will conduct a supplemental inspection at
the Crystal River 3 Nuclear Plant. The inspection will evaluate activities in the Emergency
Preparedness cornerstone using NRC Inspection Procedures (IP) 95001, Supplemental
Inspection for One or Two White Inputs in a Strategic Performance Area.
To minimize the impact to your on-site resources and to ensure a productive inspection, we
have enclosed a request for documents needed for this inspection. It is important that all of
these documents are up to date and complete, thereby minimizing the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Dan Westcott of your organization. If there
are any questions about this inspection or the material requested, please contact the lead
inspector, Mark Speck at (404) 997-4759.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
PROGRESS ENERGY
2
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Brian Bonser, Chief
Plant Support Branch 1
Division of Reactor Safety
Docket No.
50-302
License No.
Enclosure:
Supplemental Inspection
Document Request List
cc w/encl.: (See page 3)
X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED
OFFICE
RII: DRS/PSB1
RII: DRS/PSB1
SIGNATURE
RA/MS
RA/BB
NAME
M. SPECK
B. BONSER
DATE
03/14/2012
03/14/2012
E-MAIL COPY?
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
PROGRESS ENERGY
3
cc w/encl:
Kelvin Henderson
General Manager
Nuclear Fleet Operations
Progress Energy
Electronic Mail Distribution
Robert J. Duncan II
Vice President
Nuclear Operations
Progress Energy
Electronic Mail Distribution
Brian C. McCabe
Manager, Nuclear Oversight
Shearon Harris Nuclear Power Plant
Progress Energy
Electronic Mail Distribution
Terry Hobbs
Plant General Manager
Crystal River Nuclear Plant (NA2C)
15760 W. Power Line Street
Crystal River, FL 34428-6708
Stephen J. Cahill
Director - Engineering Nuclear
Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution
R. Alexander Glenn
General Counsel
Progress Energy
Electronic Mail Distribution
Jeffrey R. Swartz
Director Site Operations
Crystal River Nuclear Plant
Electronic Mail Distribution
Donna B. Alexander
Manager, Nuclear Regulatory Affairs
(interim)
Progress Energy
Electronic Mail Distribution
Thomas Sapporito
Consulting Associate
(Public Correspondence Only)
Post Office Box 8413
Jupiter, FL 33468
William A. Passetti
Chief
Florida Bureau of Radiation Control
Department of Health
Electronic Mail Distribution
Daniel R. Westcott
Supervisor
Licensing & Regulatory Programs
Crystal River Nuclear Plant (NA1B)
Electronic Mail Distribution
Joseph W. Donahue
Vice President
Nuclear Oversight
Progress Energy
Electronic Mail Distribution
Jack E. Huegel
Manager, Nuclear Oversight
Crystal River Nuclear Plant
Electronic Mail Distribution
David T. Conley
Senior Counsel
Legal Department
Progress Energy
Electronic Mail Distribution
Mark Rigsby
Manager, Support Services - Nuclear
Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution
Senior Resident Inspector
U.S. Nuclear Regulatory Commission
Crystal River Nuclear Generating Plant
U.S. NRC
6745 N Tallahassee Rd
Crystal River, FL 34428
Attorney General
Department of Legal Affairs
The Capitol PL-01
Tallahassee, FL 32399-1050
(cc w/ encl. continued on page 4)
PROGRESS ENERGY
4
cc w/encl.: (continued from pg. 3)
Bryan Koon
Director
Florida Division of Emergency Management
Electronic Mail Distribution
Chairman
Board of County Commissioners
Citrus County
110 N. Apopka Avenue
Inverness, FL 36250
Enclosure
Document Request List
Inspection Dates:
April 30 - May 4, 2012
Inspection Procedures:
IP 95001 Supplemental Inspection for One or Two White Inputs in
a Strategic Performance Area
Note: This is a list of the documents to be delivered to the NRC Region II Office (Attention:
Mark Speck, 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257) and/or
provided to the inspectors upon arrival onsite for the inspection. The current version of these
documents is expected unless specified otherwise. Electronic media is preferred, if readily
available (the preferred file format is Word or searchable .pdf files on CDROM or thumb
drive). Please organize the information as it is arranged below (e.g. a folder labeled
Miscellaneous). It is not the intent that large or burdensome data be scanned for this purpose.
This data will be inspected using original documentation. If there are questions regarding the
documents requested, please do not hesitate to contact the inspector.
Final causal analysis, extent of condition analysis, extent of cause analysis documents
related to the NOV
List of analysis team members, team charter, qualifications of team members
Documentation of corrective actions taken and/or proposed determined to be
appropriate for all root and contributing causes (e.g. procedure changes, training
requirements, records, etc.)
Actions performed or proposed determined to be adequate to demonstrate/verify
effectiveness of corrective actions
Results of any effectiveness reviews, audits, self-assessments, mock inspections, etc.
used to validate preparation for the inspection
Site procedures governing causal analysis performance and corrective action program
procedures
Documentation (evaluations, calculations, etc.) of how emergency action level radiation
monitor thresholds were determined
Lead Inspector Contact Information:
Mark E. Speck
(404) 997-4759
mark.speck@nrc.gov