Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

March 14, 2012

Mr. Jon A. Franke

Vice President, Crystal River Nuclear Plant

Crystal River Nuclear Plant (NA2C)

15760 W. Power Line Street

Crystal River, FL 34428-6708

SUBJECT:

CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NOTIFICATION

OF INSPECTION AND REQUEST FOR INFORMATION 05000302/2012503

Dear Mr. Franke:

During the period of April 30 - May 4, 2012, the NRC will conduct a supplemental inspection at

the Crystal River 3 Nuclear Plant. The inspection will evaluate activities in the Emergency

Preparedness cornerstone using NRC Inspection Procedures (IP) 95001, Supplemental

Inspection for One or Two White Inputs in a Strategic Performance Area.

To minimize the impact to your on-site resources and to ensure a productive inspection, we

have enclosed a request for documents needed for this inspection. It is important that all of

these documents are up to date and complete, thereby minimizing the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Dan Westcott of your organization. If there

are any questions about this inspection or the material requested, please contact the lead

inspector, Mark Speck at (404) 997-4759.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

PROGRESS ENERGY

2

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian Bonser, Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No.

50-302

License No.

DPR-72

Enclosure:

Supplemental Inspection

Document Request List

cc w/encl.: (See page 3)

ML12076A161

X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED

OFFICE

RII: DRS/PSB1

RII: DRS/PSB1

SIGNATURE

RA/MS

RA/BB

NAME

M. SPECK

B. BONSER

DATE

03/14/2012

03/14/2012

E-MAIL COPY?

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

PROGRESS ENERGY

3

cc w/encl:

Kelvin Henderson

General Manager

Nuclear Fleet Operations

Progress Energy

Electronic Mail Distribution

Robert J. Duncan II

Vice President

Nuclear Operations

Progress Energy

Electronic Mail Distribution

Brian C. McCabe

Manager, Nuclear Oversight

Shearon Harris Nuclear Power Plant

Progress Energy

Electronic Mail Distribution

Terry Hobbs

Plant General Manager

Crystal River Nuclear Plant (NA2C)

15760 W. Power Line Street

Crystal River, FL 34428-6708

Stephen J. Cahill

Director - Engineering Nuclear

Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

R. Alexander Glenn

General Counsel

Progress Energy

Electronic Mail Distribution

Jeffrey R. Swartz

Director Site Operations

Crystal River Nuclear Plant

Electronic Mail Distribution

Donna B. Alexander

Manager, Nuclear Regulatory Affairs

(interim)

Progress Energy

Electronic Mail Distribution

Thomas Sapporito

Consulting Associate

(Public Correspondence Only)

Post Office Box 8413

Jupiter, FL 33468

William A. Passetti

Chief

Florida Bureau of Radiation Control

Department of Health

Electronic Mail Distribution

Daniel R. Westcott

Supervisor

Licensing & Regulatory Programs

Crystal River Nuclear Plant (NA1B)

Electronic Mail Distribution

Joseph W. Donahue

Vice President

Nuclear Oversight

Progress Energy

Electronic Mail Distribution

Jack E. Huegel

Manager, Nuclear Oversight

Crystal River Nuclear Plant

Electronic Mail Distribution

David T. Conley

Senior Counsel

Legal Department

Progress Energy

Electronic Mail Distribution

Mark Rigsby

Manager, Support Services - Nuclear

Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

Crystal River Nuclear Generating Plant

U.S. NRC

6745 N Tallahassee Rd

Crystal River, FL 34428

Attorney General

Department of Legal Affairs

The Capitol PL-01

Tallahassee, FL 32399-1050

(cc w/ encl. continued on page 4)

PROGRESS ENERGY

4

cc w/encl.: (continued from pg. 3)

Bryan Koon

Director

Florida Division of Emergency Management

Electronic Mail Distribution

Chairman

Board of County Commissioners

Citrus County

110 N. Apopka Avenue

Inverness, FL 36250

Enclosure

Document Request List

Inspection Dates:

April 30 - May 4, 2012

Inspection Procedures:

IP 95001 Supplemental Inspection for One or Two White Inputs in

a Strategic Performance Area

Note: This is a list of the documents to be delivered to the NRC Region II Office (Attention:

Mark Speck, 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257) and/or

provided to the inspectors upon arrival onsite for the inspection. The current version of these

documents is expected unless specified otherwise. Electronic media is preferred, if readily

available (the preferred file format is Word or searchable .pdf files on CDROM or thumb

drive). Please organize the information as it is arranged below (e.g. a folder labeled

Miscellaneous). It is not the intent that large or burdensome data be scanned for this purpose.

This data will be inspected using original documentation. If there are questions regarding the

documents requested, please do not hesitate to contact the inspector.

Final causal analysis, extent of condition analysis, extent of cause analysis documents

related to the NOV

List of analysis team members, team charter, qualifications of team members

Documentation of corrective actions taken and/or proposed determined to be

appropriate for all root and contributing causes (e.g. procedure changes, training

requirements, records, etc.)

Actions performed or proposed determined to be adequate to demonstrate/verify

effectiveness of corrective actions

Results of any effectiveness reviews, audits, self-assessments, mock inspections, etc.

used to validate preparation for the inspection

Site procedures governing causal analysis performance and corrective action program

procedures

Documentation (evaluations, calculations, etc.) of how emergency action level radiation

monitor thresholds were determined

Lead Inspector Contact Information:

Mark E. Speck

(404) 997-4759

mark.speck@nrc.gov