SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1201 NRC SIM A (RO/SRO)

1201 NRC Simulator JPM A Page 2 of 9 RO/SRO JOB PERFORMANCE MEASURE Task: Reinstate source range detectors following a reactor trip.

Task #: 0000910501 Task Standard: Source range detectors are manually reinstated following a reactor trip.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: EPE 007 EA1.05 (4.0/4.1)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: I Name! Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 8 minutes Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

1201 NRC Simulator JPM A Page 3 of 9 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. ResettolC3Ol
3. If IC 301 is not available perform the following:
  • ResettolCl6
  • Trip the reactor
  • Insert malfunction NIO4A f:40
  • Allow simulator to run until Channel 2 IRM is <
4. Ensure TD AFW pump LCV are CLOSED
5. An extra operator will be required to acknowledge alarms.
6. ACKNOWLEDGE ALARMS
7. FREEZE SIMULATOR.
8. Provide a copy of ES-0.1, Reactor Trip Response
9. Save as a temporary IC, if repeat runs of JPM will be desired.
10. PLACE SIMULATOR IN RUN
11. After JPM is complete, delete the temporary IC, if used.

Tools/Equipment/Procedures Needed:

ES-0.1, Reactor Trip Response

References:

[ Reference Title Rev No.

F 1. ES-O.1 Reactor Trip Response 34

1201 NRC Simulator JPM A Page 4 of 9 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3
2. ES-0.1, Reactor Trip Response was entered and the crew just completed Step 13.

INITIATING CUES:

1. The SRO has directed you to continue the performance of ES-0.1, Reactor Trip Response starting at step 14.

1201 NRC Simulator JPM A Page 5 of 9 Start Time STEP Obtain a copy of ES-0.1, Reactor Trip Response 1  : SAT UNSAT Standard: Examinee obtains a copy of ES-0.1, Reactor Trip Response Q!L Provide a copy of ES-0.1, Reactor Trip Response Comment STEP 2  : 14. MONITOR tf source range channels SAT should be reinstated:

a CHECK intermediate range UNSAT

% power less than io 4

on operable channeis, Standard Examinee checks Channel 2 IRM % power N-36 less than 10% on (1 -Xl-92-5004A)

If examinee recommends transitioning to AOP-I.01 for IR NI failure, Qi provide the following cue, Another operator will perform that procedure and continue restoring the SRNL.

Cue If examinee recommends transitioning to step 15 provide the following cue, Another operator will perform step 15.

Examiner Channel 1 IRM % N-35 is failed at greater than 10% on (1-XI Note: 5003A)

Comment

1201 NRC Simulator JPM A Page 6 of 9 STEP 3  : 14, MONITOR if source range channels SAT should be reinstated:

UNSAT b CHECK source range channels REINSTATED.

Examinee checks both Source Range indicators N-31 (1-XI-92-5001A)

Standard: and N-32 (1 -XI-92-5002A) indicating low scale deflection (0) and transitions to the RNO Comment ALTERNATE PATH STEP 4  : SAT 14 MONITOR 1 source range channels should be reinstated. UNSAT Critical Step b RE NSTATE source range channels by s mul aneously placing both RM TRIP RESET-BLOCK switches to RESET posi on [M-4]

Standard Examinee places BOTh SRM Trip Reset-Block P-6 HS-92-5001 and 92-5002 to RESET.

Comment STEP 5  : 14. MONITOR if source range channeis SAT should be reinstated:

c. ENSURE at least one SRM and IRM UNSAT displayed on NR-4 recorder.

Standard Examinee selects one SRM and IRM Channel N-36 are displayed on NR-45 recorder (1-XR-92-5001).

Comment

1201 NRC Simulator JPM A Page 7 of 9 STEP 6  : 1& MONITOR tf source range channels SAT should be reinstated:

d. ENSURE audio count rate operation. UNSAT Examinee selects setting on Audio Multiplexer for a slow continuous Standard: beeping and adjusts volume as desired at Audio Count Rate Drawer, 1-XX-92-5039, on 1-M-13.

Comment MONITOR if source range channels should be reinstated:

STEP 8 14 MONITOR If source range channels SAT should be reinstated:

e. RESET shutdown monitor alarm UNSAT setpoints. [M-1 3] Critical Step Standard: E I

Comment

1201 NRC Simulator JPM A Page 8 of 9 STEP 9  : MONITOR f source range channels SAT

  • should be reinstated:

f WHEN shutdown monitor ALARM UNSAT

LEDs dark AND HIGH FLUX AT Critical Step SHUTDOWN bistable lights dark,
THEN PLACE HIGH R.UX AT SHUTDOWN
alarm block switches in NORMAL

[M-13]

Standard Examinee places HIGH FLUX AT SHUTDOWN switch in NORMAL on Source range Channel 1, 1-XX-92SOG1, panel M-13 Examiner Note: JPM step 10 may be performed before JPM step 9.

Comment STEP 10  : 14. MONITOR 1 source range channels SAT should be reinstated:

I t WHEN shutdown monitor ALARM UNSAT I LEDs dark AND HIGH FLUX AT Critical Step I SHUTDOWN bistable lights dark, THEN PLACE HIGH FLUX AT SHUTDOWN j alarm block switches in NORMAL.

[M-13]

Standard EXamiflee places HIGH FLUX AT SHUTDOWN switch in NORMAL or Source range Channel l1 I-XX-925OO2, çane1MI3 Corn ment Terminating The task is complete when the Examinee returns the JPM briefing Cue: sheet to the examiner.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Assume all independent and concurrent verifications are completed when called for by the procedure.

INITIAL CONDITIONS:

1. Unitl isinMODE3
2. ES-O.1, Reactor Trip Response was entered and the crew just completed Step 13.

INITIATING CUES:

1. The SRO has directed you to continue the performance of ES-O.1, Reactor Trip Response starting at step 14.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1201 NRC SIM B (RO)

1201 NRC Simulator JPM B Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task: Establish Excess Letdown Task#: 0040160101 Task Standard: Excess letdown placed in service and pressurizer level is steady or lowering..

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X KIA Reference/Ratings: 004 A4.06 (3.6/3.1)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name! Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 10 minutes Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

1201 NRC Simulator JPM B Page 3 of 10 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. ResettoIC3O3
3. If IC 303 is not available then perform the following:
  • Ensure normal letdown ISOLATED (FCVs-62-69, 70, 72, 73, 74 & 77 CLOSED)
  • Place charging in manual and run to minimum flow approx 30 gpm.
4. An extra operator will be required to acknowledge alarms.
5. ACKNOWLEDGE ALARMS
6. FREEZE SIMULATOR.
7. Provide a copy of EA-62-3 ESTABLISHING EXCESS LETDOWN.
8. P1-62-64 CAN BE MONITORED BY VIEWING POINT CVPSWHXIN AND SUBTRACTING 14.7
9. Save as a temporary IC; if repeat runs of JPM will be desired.
10. PLACE SIMULATOR IN RUN
11. After JPM is complete, delete the temporary IC, if used.

Tools/Equipment/Procedures Needed:

EA-62-3 ESTABLISHING EXCESS LETDOWN

References:

Reference Title Rev No.

EA-62-3 ESTABLISHING EXCESS LETDOWN 3

1201 NRC Simulator JPM B Page 4 of 10 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. NORMAL letdown has been isolated in response to indications of a small leak on the RCS per AOP-R.05
3. The leak has been isolated by taking letdown out of service.

INITIATING CUES:

1. The SRO has directed you to place excess letdown in service using EA-62-3.
2. All prerequisites are complete
3. Inform the SRO excess letdown is in service and pressurizer level is constant or lowering.

1201 NRC Simulator JPM B Page 5 of 10 Start Time 4.1 Placing Excess Letdown in Service NOTE If seal return valves FcV-62-61 or FcV-62-63 are closed, excess letdown flow will be routed to PRT via relief valve 62-636 Reopening FCV-62-i and FCV62-63 following a Phase A Isolation is addressed in applicable EOP steps STEP Obtain a copy of EA-62-3 ESTABLISHING EXCESS LETDOWN 1  : SAT UNSAT Standard Examinee obtains a copy of EA-62-3 ESTABLISHING EXCESS LETDOWN Cue Provide a marked up copy of EA-62-3 ESTABLISHING EXCESS LETDOWN.

Comment STEP 2  : I IF excess letdown is only letdown flowpath, SAT THEN CONTROL charging flow as necessary to prevent high pressurizer level.

u NSAT Examinee maintains charging near minimum (<55 gpm). Examinee will Standard: ensure expeditious procedure performance prevents Pressurizer level exceeding Hi Level Alarm.

Comment

1201 NRC Simulator JPM B Page 6 of 10 STEP 3  : Z IF high actMty levels in RCS are suspected, SAT THEN NOTIFY Radiological Control (Radcon) section to monitor plant UNSAT radiological conditions as required.

Standard: Examinee determines by observation of rad monitors that high activity is not suspected and N/As step.

If asked provide the following cue, Radcon/Chenistry has determined Cue that no high RCS activity is present.

Comment STEP 4  : & ENSURE CCS inlet to excess letdown heat exchanger [FCV-70-1 431 SAT OPEN UNSAT Examinee verifies FCV-70-143 is OPEN, by observing red light above Standard:

1-HS-70-143A is ON.

Comment STEP 5  : 4. ENSURE ocs outlet to excess letdown heat exchanger tFcV-70-851 OPEN.

1 1

SAT I UNSAT 1 Critical Step Standard: Examinee places HS-70-85 to OPEN.

HS-70-85 needs to be maintained in the OPEN position momentarily Examiner

. since it is an air operated valve, there is no malfunction inserted for note.

this JPM.

Comment

1201 NRC Simulator JPM B Page 7 of 10 STEP 6  : 5. VERIFY CC3 flow to excess letdowfl heat exchanger SAT greater than 230 gpm, as indicated orLtFI7O-841.

UNSAT Standard Examinee verifies CCS flow to excess letdown heat exchanger greater than 230 gpm by observing 1-Fl-70-84.

Comment STEP 7  : 6. ENSURE excess letdown divert valve IFCV-62-591 in NORMAL SAT UNSAT Examinee verifies FCV-62-59 is in the NORMAL position, by observing Standard left red light above 1-HS-62-59A is ON.

Comment STEP 8  : 7. OPEN excess letdown isolation valve [FCV42-541. SAT UNSAT Critical Step Standard: Examinee places HS-62-54 to OPEN.

Comment

1201 NRC Simulator JPM B Page 8 of 10 STEP 9 : OPEN excess letdown isolation valve [FCV-62-55[ SAT UNSAT Critical Step Standard: Examinee places HS-62-55 to OPEN.

Comment NOTE UNIT I ONLY Normally the temperature read on 1-TI-62-58 should be less than 200°F. If operation requires temperatures greater than 200°F, the pressure at I -PI62-64 (local indicator EL 690 Pnl. L-46) should be less than 100 psig to protect the Grinnell valves.

STEP 10 : 9. ADJUST excess letdown flow control valve [FCV-62-561 as necessary SAT to control flow WHILE maintaining heat exchanger outlet temperature

> less than 2OOF (24OF on Unit 1), as indicated on [Tl UNSAT Examinee slowly OPENS FCV-62-56A by rotating HIC-62-56A CCW Critical Step Standard: to increase excess letdown flow so as NOT to exceed 240°F on 1-TI-62-58.

If asked provide the following cue, AUO has been dispatched and is C ue.

on station.

Examiner Have the booth operator monitor computer point for indication of P1-Note 62-64.

Comment

1201 NRC Simulator JPM B Page 9 of 10 STEP 11  : 10. NOTIFY RADCQN excess letdown has been placed in service, SAT UNSAT Standard Examinee notifies RADCON excess letdown has been placed in service.

Comment STEP 12  : It RETURN TO procedure and step in effect. SAT UNSAT END OF TEXT Standard: Examinee addresses the procedure step.

Comment Terminating The task is complete when the Examinee returns the JPM briefing Cue: sheet to the examiner. STOP Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Assume all independent and concurrent verifications are completed when called for by the procedure.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. NORMAL letdown has been isolated in response to indications of a small leak on the RCS per AOP-R.05
3. The leak has been isolated by taking letdown out of service.

INITIATING CUES:

1. The SRO has directed you to place excess letdown in service using EA-62-3.
2. All prerequisites are complete
3. Inform the SRO excess letdown is in service and pressurizer level is constant or lowering.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1201 NRC SIM C (RO/SRO)

1201 NRC Simulator JPM C Page 2 of 13 ROISRO JOB PERFORMANCE MEASURE Task: Transfer to Hot Leg Recirculation Task#: 0000790501 Task Standard: Realign RHR to cold leg injection with a failure of a RHR hot leg injection valve to open.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: EPE 011 EA1 .11 (4.2/4.2)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name! Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 15 minutes Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

1201 NRC Simulator JPM C Page 3 of 13 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Resetto 10300
3. Ensure the following remote functions are inserted:
a. IRF RHR14f:i (FCV-63-i)
b. IRF SIRO6 f:0 (FCV-63-22) (Verify power on during setup)
c. IOR ZDIHS631 72A f:0 (Fails FCV-63-i 72 closed)
4. If IC 300 is not available perform the following:
a. Resetto 1024
b. Ensure THO1Af:10 is inserted
c. Trip RCPs
d. After automatic containment sump swapover is initiated, perform required alignment of ECCS to containment sump per ES-i .3.
e. Place operating power on FCV-63-1 (remote function IRE RHR1 4 f:1).
f. When RWST level decreases to 8% realign containment spray pump suction to containment sump per ES-i .3.
g. Ensure operating power ON FCV-63-22 (Check remote function main menu for IRE SIRO6 f:0, this task should have been performed in E-i).
h. Insert override ICR ZDIHS63172Af:0 (Fails [FCV-63-172] CLOSED)
5. An extra operator will be required to acknowledge alarms.
6. ACKNOWLEDGE ALARMS
7. FREEZE SIMULATOR.
8. Provide a copy of ES-i .4, Transfer to Hot Leg Recirculation
9. Save as a temporary IC, if repeat runs of JPM will be desired.

iO. PLACE SIMULATOR IN RUN ii. After JPM is complete, delete the temporary IC, if used.

Tools/Equipment/Procedures Needed:

ES-i .4, Transfer to Hot Leg Recirculation

References:

Reference Title Rev No.

ES-i .4 Transfer to Hot Leg Recirculation 6 DIRECTIONS TO TRAINEE:

1201 NRC Simulator JPM C Page 4 of 13 I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 in MODE 5 following an event.
2. All ECCS components and Containment Spray pumps are aligned and taking suction from containment sump per ES-i .3, Transfer to RHR Containment Sump.
3. RCS pressure is less than 180 psig.
4. Both RHR pumps are in service.
5. RHR spray is NOT in service.
6. 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> have elapsed since the time of the event.

INITIATING CUES:

1. You have been directed to transfer to hot leg recirculation using ES-i .4, Transfer to Hot Leg Recirculation.
2. Inform the SRO when complete.

1201 NRC Simulator JPM C Page 5 of 13 Start Time STEP Obtain a copy of ES-i .4, Transfer to Hot Leg Recirculation.

1  : SAT UNSAT Standard: Examinee obtains a copy of ES-i .4, Transfer to Hot Leg Recirculation.

J1 Provide a copy of ES-i .4, Transfer to Hot Leg Recirculation.

Comment STEP 2

  • DETERMlNEfRHRspray sroukI be isolated: SAT
a. CHECK RHR spray IN SERVICE: a GO TO Step 2 UNSAT
  • Train A RHR spray valve FCV-72-40 OPEN OR
  • Train B RHR spray valve FCV-72-41 OPEN.

Examinee determines RHR spray is NOT in service from the initiating cue Standard or by observing green lights above i-HS-72-40A Train A RHR spray valve and i-HS-72-4iA Train B RHR spray valve are ON and transitions to step 2.

Comment STEP 3  : 2. CHECK RHR pump A-A RUNNING SAT UNSAT Standard Examinee verities RHR pump iA-A running, by observing red light ON and green light OFF above i-HS-74-iOA RHR pump iA-A.

Comment

1201 NRC Simulator JPM C Page 6 of 13 STEP 4  : 3. ALIGN RHR Train A for hot leg SAT recirculation:

  • a. CLOSE RHR Train A cold leg UNSAT isolation valve FCV-63-93 Critical Step Standard: Examinee places 1-HS-63-93A, RHR CL Inj to Loop 2&3 to CLOSE.

Examiner Alarm on M-6D, window E6, Group 6 Monitor Lights Component Off Note: Normal will come in when 1 -FCV-63-93 is closed.

Comment STEP 5  : 3. ALIGN RHR Train A for hot leg SAT recirculation:

UNSAT Ii ENSURE RHR Train B discharge crosstie valve FCV-74-35 CLOSED.

Standard Examinee verifies 1 -FCV-74-35 CLOSED by observing green lights above 1 -HS-74-35A RHR HX 1 B crosstie valve are ON.

Comment STEP 6  : 3. ALIGN RI-jR Train A for hot leg SAT

. recirculation:

C. OPEN RHR Train A discharge UNSAT crosstie valve FCVJ4-33 Critical Step Standard: Examinee places 1-HS-74-33A RHR HX 18 crosstie isol to OPEN.

Comment

1201 NRC Simulator JPM C Page 7 of 13 STEP 7  : 3 ALIGN RHR Train A for hot leg recirculation: SAT ci OPEN RHR hot leg injection valve UNSAT FCV63-1 72 Examinee places 1-HS-63-172A, RHR HL lnj to Loops 1&3 to OPEN Standard: observes green lights above 1-HS-63-172A remain ON and transitions to RNO.

Comment ALTERNATE PATH STEP 8  : SAT

3. ALIGN RHR Train A for hot leg recirculation: U NSAT PERFORM the following:
1) ENSURE RHR hot leg injection FGV63-i72 CLOSED.

Standard: Examinee observes green lights above 1-HS-63-172A are ON.

Comment

1201 NRC Simulator JPM C Page 8 of 13 ALTERNATE PATH STEP 9  : SAT

3. ALIGN RHR Train A for hot leg recirculation: UNSAT Critical Step PERFORM the following:
2) ENSURE RHR Train A discharge crosstie valve FCV-74-33 CLOSED.

Standard: Examinee places 1-HS-74-33A, RHR HX 1A crosstie isol to CLOSE Comment ALTERNATE PATH STEP 10  : SAT

3. ALIGN R[IR Train A for hot leg recirculation: U NSAT Critical Step PERFORM the follong:
3) ENSURE RHR Train A cold leg valve FCV-63-93 OPEN.

Standard: Examines places 1-HS-63-93A, RHR CL lnj to Loop 2&3 to OPEN.

Examiner Alarm on M-6D, window E-6, Group 6 Monitor Lights Component Off Note: Normal will clear when 1 -FCV-63-93 is open.

Comment

1201 NRC Simulator JPM C Page 9 of 13 ALTERNATE PATH STEP 11  : SAT 3 ALIGN RHR Train A for hot leg recirculation: U NSAT PERFORM the following:

4) IF FcV-63i72 is known to be unavailable (NOT capable of opening from MCR),

THEN GO TO Step it Standard: Exam inee transitions to step 11.

Comment STEP 12  : i CHECKSIpUmpA-ARUNN1NG SAT UNSAT Examinee verifies SI pump 1A running, by observing red light ON and an d ar d*

green light OFF above 1-HS-63-1OA SI pump 1A.

Comment STEP 13  : 1Z ALIGN SI pump A-A for hot leg recircuiation: SAT UNSAT

a. ENSURE St Pump A-A STOPPED. Critical Step Standard: Examinee places 1-HS-63-1OA SI pump 1A, to STOP Comment

1201 NRC Simulator JPM C Page 10 of 13 STEP 14 12. ALIGN SI pump A-A for hot leg recirculation: SAT UNSAT

b. CLOSE SI Train A crosstie Critical Step FCV-631 52.

Standard: Examinee places 1-I-fS-63-152, SI Pump 1A CL Inj IsoI Loop 1-2-3-4 to CLOSE Examiner Alarm on M-6D, window E-6, Group 6 Monitor Lights Component Off Note: Normal will come in when 1-FCV-63-152 is closed.

Comment STEP 15 . 12 ALIGN SI pump A-A for hot leg recirculation: SAT UNSAT

c. WHEN FCV-63-152 closed.

ThEN Critical Step

, PERFORM the following:

1) OPEN SI Train A hot leg injection FCV-63-156:

Standard: Examinee places 1-HS-63-156, SI Pump 1A HL lnj Isol Loop 1&3 to OPEN Comment

1201 NRC Simulator JPM C Page 11 of 13 STEP 16  : 2. ALIGN SI pump A-A for hot leg recirculation: SAT UNSAT

c. WHEN FCV-63-i 52 closed THEN Critical Step PERFORM Itie following:
2) START SI pump A-A.

Standard: Examinee places 1-HS-63-1OA SI pump IA, to START Cue Provide the following cue, Another operator will complete the

. remaining steps in this procedure.

Comment Terminating The task is complete when the Examinee returns the JPM briefing Cue: sheet to the examiner. I Stop Time

1201 NRC Simulator JPM C 12 of 13 Hot Leg Recirculation Swapover:

Swapover is manually done by operators in the Main Control Room.

RHR Sequence:

  • Close A Train cold leg isolation valve FCV-63-93
  • Ensure RHR Train B discharge crosstie valve FCV-74-35 is closed
  • Open Train A crosstie valve FCV-74-33
  • Open RHR hot leg recirculation valve FCV-63-172
  • Close B Train cold leg isolation valve FCV-63-94 SI Sequence: One train is completed at a time.

A Train B Train Stop SI Pump A-A Stop SI Pump B-B Close Tm A Crosstie FCV-63-152 Close Tm B Crosstie FCV-63-1 53 Open Tm A H/L valve FCV-63-156 Open Tm B H/L valve FCV-63-1 57 Start SI Pump A-A Start SI Pump B-B After both SI pumps aligned for Hot Leg Recirculation Close FCV-63-22 SI pump CL injection

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Assume all independent and concurrent verifications are completed when called for by the procedure.

1. Unit 1 in MODE 5 following an event.
2. All ECCS components and Containment Spray pumps are aligned and taking suction from containment sump per ES-i .3, Transfer to RHR Containment Sump.
3. RCS pressure is less than 180 psig.
4. Both RHR pumps are in service.
5. RHR spray is NOT in service.
6. 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> have elapsed since the time of the event.

INITIATING CUES:

1. You have been directed to transfer to hot leg recirculation using ES-i .4, Transfer to Hot Leg Recirculation.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1201 NRC SIM D (RO/SRO)

1201 NRC Simulator JPM D Page 2 of 16 RO/SRO JOB PERFORMANCE MEASURE Task: Swap RHR Pumps (B Train to A Train) with Level in the Pressurizer Task#: 0050030101 Task Standard: A Train RHR is placed in service injecting to Loops 2 & 3 with a slight cooldown initiated.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: 005 A4.01 (3.6/3.4)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name! Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 11 minutes Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

1201 NRC Simulator JPM D Page 3 of 16 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. ResettolC3O2
3. Ensure B Train RHR is in service with flow aligned through FCV-63-93 to Loops 2 & 3.
4. An extra operator will be required to acknowledge alarms.
5. Override AN_OV_325 is in OFF as required.
6. ACKNOWLEDGE ALARMS
7. FREEZE SIMULATOR.
8. FI-74-12 CAN BE MONITORED BY VIEWING POINT rhf7412 multiplying by 7.2
9. Provide a copy of 0-SO-74-1, Residual Heat Removal System Section 8.3.1
10. Save as a temporary IC, if repeat runs of JPM will be desired.
11. PLACE SIMULATOR IN RUN
12. After JPM is complete, delete the temporary IC, if used.

Tools/EquipmentlProcedures Needed:

0-SO-74.-1, Residual Heat Removal System Section 8.3.1

References:

Reference Title Rev No.

. 0-SO-74-1 Residual Heat Removal System Section 79

1201 NRC Simulator JPM D Page 4 of 16 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 had been in Mode 5 for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
2. RCS boron is 1400 ppm and the previous shift determined that A Train RHR boron concentration is 1450 ppm.
3. Shutdown margin required boron concentration is 1200 ppm.
4. B Train RHR pump needs to be shutdown to allow MEG to add oil to the motor.
5. A Train RHR has been checked out locally by the Auxiliary Bldg. AUO and is ready for service.

INITIATING CUES:

1. You have been directed by the SRO to place A Train RHR in service and take B Train RHR out of service using 0-SO-74-1, Residual Heat Removal System Section 8.3.1.
2. All prerequisites for 0-SO-74-1, Residual Heat Removal System have been completed.
3. Maintain A Train injection flowpath to loops 2 & 3.
4. When A Train RHR is in service initiate a slow cooldown to 1200 F using 0-SO-74-1, Residual Heat Removal System step 8.3.1.7.
5. Inform the SRO when complete.

1201 NRC Simulator JPM D Page 5 of 16 Start Time STEP

1201 NRC Simulator JPM D Page 6 of 16 8.3 Swapping RHR Pumps with RCS level above Midloop Conditions.

NOTE If RHR Train to be placed in service has NOT been previously borated to greater than the minimum RCS boron concentration required for shutdown margin, Section 6.2 should be used to swap RHR trains.

8.3.1 Placing Train A in Service and Removing Train B from Service.

CAUTION CCS flow should be adjusted to provide adequate flow through the RHR Hx to prevent RHR Hx CCS outlet temperature from exceeding 145°F. The RHR Hx CCS outlet temperature alarm will come in at 115°F.

NOTE The following steps may require operators in both heat exchanger rooms and one outside the pump rooms.

STEP 2 [1] IF adjustment is required on CCS flow through RHR Hxs

. THEN SAT ENSURE [FCV-70-156] RHR I-tx A CCS outlet is THROTTLED UNSAT Examinee verifies 1-FCV-70-156 RHR Hx A CCS outlet throttled by Standard: observing red and green lights above 1-HS-70-156A RHR HX 1A OUTLET ISOL is ON Exm,er Operator may decide to keep 1-FCV-70-156 Open Comment

1201 NRC Simulator JPM D Page 7 of 16 STEP 3  : [21 ENSURE [FCV-74-161 RHR HxA outlet is CLOSED SAT UNSAT Examinee verifies 1-FCV-74-16 RHR Hx B Outlet is CLOSED by Standard: observing 100% output on 1-HIC-74-16A RHR Hx 1A Outlet Flow Control.

Comment CAUTIONS

1) Failure to maintain shutdown cooling flow rate for an RHR pump at the maximum possible could result in reduced thrust bearing life. tC.3]
2) If RHR pressure downstream of pumps exceeds 600 psig with RHR aLigned for Shutdown Cooling, then RHR discharge pressure must be reduced below 600 psig or RHR isolated from the RCS within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

NOTE RHR motor lower bearing oil level will rise after pump is started and may rise above sightglass The presence of ol can be veritled by a golden tint or a milk color (two different oils approved) in sghtglass.

STEP 4  : [31 START RHR Pump A-A with FHS-74-IOA1.

SAT UNSAT Critical Step Standard: Examinee places 1-HS-74-1OA, RHR Pump 1A to START.

Comment

1201 NRC Simulator JPM D Page 8 of 16 STEP 5  : 4] VERiFY [FcV-74-121 RHR Pump A-A miniflow OPENS SAT or greater than 500 gpm is indicated on Fl-74-12.

UNSAT Examinee verities 1-FCV-74-12 by observing red light above 1-HS Standard: 12A RHR Pump 1A miniflow is ON or checks with AUO locally to verify

>500 gpm flow indicated on local flow indicator 1-Fl-47-12.

Examiner Have the booth operator monitor computer point for indication of 1-Fl-Note: 47-12.

Comment CAUTIONS

1) To reduce vibration across FCV-74-16 and FCV-74-28 (RHR Mx Outlet Valves).

RHR must be aligned to only two cold legs with one train in service.

2) Operating RHR pumps in parallel (HCV-74-36 and HCV-74-37 OPEN OR 74-530 and 74-51 OPEN) and on minifiow for> 10 minutes may result in pump damage due to one pump dead-heading. [C.2 [C.13]

NOTE Step 83.1 f5.2] and 8.3.1 E5.3] may be :pelforrned together to maintain continuous flow delivered to RCS STEP 6  : [51 iF aligning Train A RHR coding to loops 2 and 3 SAT THEN PERFORM the following: UNSAT

[Si] ENSURE IFCV-63-931 OPEN Standar& Examinee verifies 1-HS-63-93 RHR CL INJ TO LOOPS 2&3 to OPEN by observing red light above HS-63-93 ON.

Comment

1201 NRC Simulator JPM D Page 9 of 16 STEP 7  : [52] ADJUST 1FCV741 61 to establish ifow from Train A SAT RHR.

UNSAT Standard Examinee rotates 1-HIC-74-16A RHR HX 1A Outlet Flow Control clockwise to establish flow Comment TD [53] ADJUST IFCV-74-281 AND [PCV4442I to reduce Train 8

BRHRflow.

UNSAT Examinee rotates 1-HIC-74-16A RHR HX 1A Outlet Flow Control counter clockwise to reduce flow Standard:

Examinee rotates 1-HIC-74-32A RHR HX 1A Bypass Flow Control counter clockwise to reduce flow Comment STEP [54] VERIFY rFcv-74-241 RHR Pump B-B minifTow OPENS 9 SAT

. or greater than 500 gpm is indicated on FI-74-24 UNSAT Examinee verifies 1-FCV-74-24 RHR Pump B-B minif low OPENS by Standard: observing red light above 1-HS-74-24A ON or checks with AUO locally to verify >500 gpm flow indicated on local flow indicator 1-Fl-47-24.

Comment If asked provide the following cue, 1-FI-74-24 indicates 550 gpm.

1201 NRC Simulator JPM D Page 10 of 16 STEP 10  : [5.51 CLOSE FFCV-74451 RHR Hx B Crosstie IsoL SAT UNSAT Critical Step Standard: Examinee places 1-HS-74-35A, RHR Hx 18 Crosstie Isol to CLOSE Comment STEP 11  : [5.6] ENSURE IFCV-74-331 RHR Hx A Crosstie Iso! OPEN.

SAT

  • UNSAT Examinee verifies 1-FCV-74-33, RHR Hx A Crosstie Isol to OPEN by Standard: observing red light above 1HS-74-33A RHR Hx 1A Crosstie Isol is ON.

Comment

[5.7] OPEN [VLV-74-530] RHR Hx A to Letdown Hx.

STEP 12  : SAT UNSAT Examinee dIrects an AUO to OPEN I-HCV-74-53 RHR Critical Step Standard: -

Letdown Hx.

Cue If asked provide the following cue, An AUO will manually open 1-HCV-74-530 RHR Hx B to Letdown Hx.

Examiner Direct the Booth Operator to modify remote function RHRO3 to 100 Comment

1201 NRC Simulator JPM D Page 11 of 16 STEP 13  : [5.8] STOP RHR Pump B-B with [HS-74-20A1. SAT UNSAT Critical Step Standard: Examinee places I-HS-74-20A RHR la Pump to STOP Comment

[59] OPEN fl-tCV-74461 RHR Hx A Bypass STEP 14 SAT UNSAT Critical Step Standard: Examinee directs an AUO to OFEN 1$1CV-7438 RHR Hx A Bypass Cue If asked provide the following cue, An AUO will manually open 1-

. HCV-74-37, RHR Hx B Bypass.

Examiner Direct the Booth Operator to modify remote function RHRO6 to 100 Comment

1201 NRC Simulator JPM D Page 12 of 16 STEP 15  : [5:10] CLOSE IHCV-74471 RHR Hx B Bypass SAT UNSAT Critical Step Standard: Examinee directs an AUO to CLOSE 1-HCV-74-37, RHR Hx B Bypass Cue If asked provide the foflowing cue, An AUO will manually close 1-

. HCV-74-37, RHR Hx B Bypass.

Examiner Direct the Booth Operator to modify remote function RHRO7 to 0 Comment STEP 16  : [511] CLOSE Pt LV-74-5311 RHR Hx B to Letdown Hx.

SAT UNSAT Critical Step Standard Examinee directs an AUO to CLOSE t-HCV-74-531, RHR Fix B to Letdown Hx Cue If asked provide the following cue, An AUO will manually close 1-

. HCV-74-531, RHR Hx B to Letdown Hx.

Examiner Direct the Booth Operator to modify remote function RHRO4 to 0 Comment

1201 NRC Simulator JPM D Page l3of 16 STEP 17 [5.12] ENSURE IFCV-63-941 CLOSED.

SAT UNSAT Standar& Examinee places 1-HS-74-94 RHR-CL INJ to LOOPS 1&4 CLOSED by observing GREEN light above HS-63-93 ON Comment

[5.13J INDEPENDENTLY VERIFY the foUowng valves:

STEP 18  : SAT UNSAT Standard: Examinee addresses procedure step.

Comment

1201 NRC Simulator JPM D Page 14 of 16 CAUTIONS 1> To reduce vibration across FCV-74-l 6 and FCV-74-28 (RHR Hx Outlet Valves>,

RHR must be aligned to only two cold legs with one train in service.

2) Operating RHR pumps in parallel (HCV-74-36 and HCV-74-37 OPEN OR 74-530 and 74431 OPEN) and on miniflow for> 10 minutes may result in pump damage due to one pump dead-heading. [C.2] [C.13]

NOTE Step 8.3.1 t6.2] and 8.3.1t6.3] may be performed together to ensure continuous flow delivered to RC&

[81 IF aligning Train A RHR cooling to loops 1 and 4, STEP 19 THEN SAT PERFORM the following:

U NSAT Standard: Examinee determines this procedure step is not applicable from the initiating cue and proceeds to step 8.1.3.7.

Comment NOTE One or both of the valves in the next step may be throttled to maintain RCS at desired temperature.

[7] THROTTLE one or both of the following to maintain desired STEP 20  : cling rate (NIA if not throttled): SAT VALVE NO. FUNCTiON INITIALS UNSAT FCV-74-16 RHR Hx A Ouflet FCV-74-32 RHR Hx Bypass Examinee positions 1-HIC-74-16A, RHR Hx 1A Outlet Flow Control to Standard: LOWER and 1-HIC-74-32A, RHR Hx 1A & lB Bypass flow Control to obtain desired cooldown rate.

Comment

1201 NRC Simulator JPM D Page 15 of 16 STEP 21  : {8J WHEN injection flow is> 1250 gpm, SAT THEN VERIFY IFCV-74-121 RHR Pump A-A miniflow is CLOSED UNSAT Standard Examinee verifies 1-FCV-74-12 RHR Pump A-A, miniflow is CLOSED by observing green light above 1-HS-74-12 ON.

Comment STEP 22  : M water is to be removed from Train B Hx, SAT THEN CLOSE 1FCV-7O1531 UNSAT Standard: Examinee determines this procedure step is not applicable from the cue.

Cue: If asked provide the following cue, Cooling water will not be removed from Train A Hx Comment Terminating The task is complete when the Examinee returns the JPM briefing Cue: sheet to the examiner. STOP Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Assume all independent and concurrent verifications are completed when called for by the procedure.

INITIAL CONDITIONS:

1. Unit 1 had been in Mode 5 for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
2. RCS boron is 1400 ppm and the previous shift determined that A Train RHR boron concentration is 1450 ppm.
3. Shutdown margin required boron concentration is 1200 ppm.
4. B Train RHR pump needs to be shutdown to allow MEG to add oil to the motor.
5. A Train RHR has been checked out locally by the Auxiliary Bldg. AUO and is ready for service.

INITIATING CUES:

1. You have been directed by the SRO to place A Train RHR in service and take B Train RHR out of service using 0-SO-74-1, Residual Heat Removal System Section 8.3.1.
2. All prerequisites for 0-SO-74-1, Residual Heat Removal System have been completed.
3. Maintain A Train injection flowpath to loops 2 & 3.
4. When A Train RHR is in service initiate a slow cooldown to 1200 F using 0-SO-74-1, Residual Heat Removal System step 8.3.1.7.
5. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1201 NRC SIM E (RO/SRO)

1201 NRC Simulator JPM E Page 2 of 8 RO/SRO JOB PERFORMANCE MEASURE Task: Place 1 B H2 Analyzer In Service Task#: 0280030101 Task Standard: Place Ui B Train H2 Analyzer in service for a post maintenance test.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: 028 A4.03 (3.1/3.3)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: I Name! Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 5 minutes Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

1201 NRC Simulator JPM E Page 3 of 8 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. ResettolCl6
3. Place the following handswitches to CLOSE or OFF
  • HS-43-21 OA
  • HS-43-207
  • HS-43-208.
4. An extra operator will be required to acknowledge alarms.
5. ACKNOWLEDGE ALARMS
6. FREEZE SIMULATOR.
7. Provide a copy of 0-SO-43-4, Hydrogen Analyzer Section 5.2 & 5.4
8. Save as a temporary IC, if repeat runs of JPM will be desired.
9. PLACE SIMULATOR IN RUN
10. After JPM is complete, delete the temporary IC, it used.

Tools/Equipment/Procedures Needed:

0-SO-43-4 Section 5.2 & 5.4

References:

Reference Title Rev No.

. 0-SO-43-4 Hydrogen Analyzer 6

1201 NRC Simulator JPM E Page 4 of 8 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit us in MODE 1.
2. Maintenance has been completed on the Train B H2 Analyzer remote panel.
3. The clearance for the Train B H2 Analyzer has been released.
4. Post maintenance test requires placing the analyzer in service for a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

INITIATING CUES:

1. The SRO has directed you to place the Train B H2 Analyzer in standby in preparation for the PMT using 0-SO-43-4 Hydrogen Analyzer, section 5.2 starting at step 5.
2. All prerequisites are complete
3. Inform the SRO when complete.

1201 NRC SimulatorJPM E Page 5 of 8 Start Time STEP 1 Obtain a copy of 0-SO-43-4 Hydrogen Analyzer

SAT UNSAT Standard: Examinee obtains a copy of 0-SO-43-4 Hydrogen Analyzer QL Provide a marked up copy of 0-SO-43-4 Hydrogen Analyzer, section 5.2 Comment STEP 2 [5] ENSURE Cntmt H 2 Analyzer inlet valve [FSV-43-2071 in the P-AUTO position (located on Mi 0) SAT UN SAT Critical Step Standard:

Comment STEP  : [6] IF placing Unit I Hydrogen Analyzer in STANDBY. THEN 3 SAT PLACE Analyzer inlet valve handswitch Ii -HS-43-4521 for

[1 -FSV43-4521 and [1 -FSV43-45) in the P-AUTO position UNSAT (located in 480V Shutdown BOardroOm 1A2 near Hdrogen Analyzer)

Standard: Examinee directs an AUO to perform the procedure step If asked provide the following cue, AUO acknowledges and reports ue.

the procedure step is complete.

Comment

1201 NRC Simulator JPM E Page 6 of 8 STEP 4  : [fl ENSURE Hydrogen Analyzer outlet valve [FSV-43-208]

SAT in P-AUTO (located on N1-10).

. UNSAT Critical Step Standard: Examinee places I-HS-43-208, CNTMT H2 ANALYZER FAN B OUTLET in P-AUTO Comment STEP [8] VERIFY Low Analyzer Temperature light on remote panel 5 AT

. goes out UNSAT Standard: Examinee directs an AUC to perform the procedure step Cue If asked provide the following cue, AUO acknowledges and reports the Low Analyzer Temperature light on remote panel OUT.

Comment STEP 6 [9] ENSURE Cntmt H 2 Anayzer Fan B Control Switch tHS43-21OA in the STANDBY position (located on M-10) SAT UNSAT Critical Step Standar& Examin pLaces Cntmt 1-12 Analyzer Fan B Control Switch I-HS 2IOA in STANDBY.

Comment

1201 NRC Simulator JPM E Page 7 of 8 STEP 7  : [10] PERFORM Independent Verification for the following:

SAT UNSAT Standard: Examinee addresses the procedure step.

Comment Terminating The task is complete when the Examinee returns the JPM briefing Cue: sheet to the examiner.

Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Assume all independent and concurrent verifications are completed when called for by the procedure.

INITIAL CONDmONS:

1. Unit 1 is in MODE 1.
2. Maintenance has been completed on the Train B H2 Analyzer remote panel.
3. The clearance for the Train B H2 Analyzer has been released.
4. Post maintenance test requires placing the analyzer in service for a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

INITIATING CUES:

1. The SRO has directed you to place the Train B H2 Analyzer in standby in preparation for the PMT using O-SO-43-4 Hydrogen Analyzer, section 5.2 starting at step 5.
2. All prerequisites are complete
3. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1201 NRC SIM F (RO/SRO)

1201 NRC Simulator JPM F Page 2 of 11 RO/SRO JOB PERFORMANCE MEASURE Task: Perform DIG Load Test on lA-A D/G and initiate a shutdown when a high crankcase condition develops.

Task#: 0640020101 Task Standard: The examinee will perform a DIG Operability Test using 1-SI-OPS-082-007.A and emergency stop within 3 minutes of the receipt of the DIESEL GEN lA-A CRANKCASE PRESS HIGH ENGINE 1 OR 2 alarm.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X KIA Reference/Ratings: 064 P4.01 (4.0/4.3)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name/Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 20 minutes Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

1201 NRC Simulator JPM F Page 3 of 11 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. ResettolCl6
3. An extra operator will be required to acknowledge alarms.
4. Start the 1A EDG using 1-Sl-OPS-082-007.A, Electrical Power System Diesel Generator lA-A, Appendix C AMBIENT MANUAL START METHOD
5. At step 12 Booth Operator insert remote function EGRO7f:1 to reset 86LOR
6. ACKNOWLEDGE ALARMS
7. FREEZE SIMULATOR.
8. Provide a copy of 1 -Sl-OPS-082-007.A, Electrical Power System Diesel Generator 1 A-A completed through step 6.1.9.
9. Save as a temporary IC, if repeat runs of JPM will be desired.
10. PLACE SIMULATOR IN RUN
11. At step 27, Booth Operator insert annunciator override AN_OV_923 f:2 ON.
12. It directed by the Examiner insert malt EGO2A ON
13. After JPM is complete, delete the temporary IC, if used.

Tools/Equipment/Procedures Needed:

1-SI-OPS-082-007.A, Electrical Power System Diesel Generator lA-A, Appendix C AMBIENT MANUAL START M ETHOD

References:

Reference Title Rev NoJ 1 -Sl-OPS-082-007.A Electrical Power System Diesel Generator 1 A-A 50 0-AR-M26-B Annunciator 0-XA-55-268 28

1201 NRC Simulator JPM F Page 4 of 11 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Uniti andUnit2areinMODEl.
2. lA-A DIG is INOPERABLE due to maintenance
3. Maintenance has been completed on the lA-A D/G and the clearance has been removed.
4. All personnel required to perform the test are on station.
5. All Section 4.0 PREREQUISITE ACTIONS of 1-SI-OPS-082-007.A are complete.
6. Section 6.1 of 1-SI-OPS-082-007.A has been completed through step 6.1.9.

INITIATING CUES:

1. The SRO has directed you to load the 1 A EDG using 1-Sl-OPS-082-007.A starting at step 6.1.10
2. Inform the SRO when complete.

1201 NRC Simulator JPM F Page 5 of 11 Start Time STEP . Obtain a copy of 1 -Sl-OPS-082-007.A, Electrical Power System Diesel 1 SAT Generator lA-A, Appendix C AMBIENT MANUAL START METHOD UNSAT Standard: Examinee obtains a copy of 1 -Sl-OPS-082-007.A, Electrical Power System Diesel Generator 1 A-A, c Provide a copy of 1 -Sl-OPS-082-007.A, Electrical Power System Diesel Generator lA-A, completed through step 6.1.9 Comment STEP 2  : Ambient Start Performance (continued)

SAT (1Qj PERFORM The fdilatng to wipe the Automatic Voltage Control Rheostat UNSAT

[1011 RECORD voltage from [O-Et-824[

Volts Standard: Examinee records voltage from 0-El-82-4, DG lA-A INCOMING VOLTAGE.

Comment

1201 NRC Simulator JPM F Page 6 of 11 STEP 3 PERFORM the foowTng to wipe the Automatic Voltage Control

. Rheostat SAT

[1021 ENSURE 10-HS-82-121 DO IA-A Voitage Regulator UNSAT S1tch in the PULL-P-AUTO position.

Standard Examinee verifies 0-HS-82-12 DG lA-A VOLTAGE REGULATOR is in the PULL-P-AUTO position.

Comment STEP 4 j1QJ PERFORM the folawing to wipe the Automatic Voltage Control

. Rheostat SAT

[10.31 LOWER vo[tage to 6700 volts on [0-E!-82-4] USING UNSAT

[0-HS-82-12].

Standard Examnee places 0-HS-82-12 DG lA-A VOLTAGE REGULATOR to LOWER (COUNTER-CLOCKWISE) and attains 6700 volts on El-82-4.

Comment STEP 5 PERFORM the following to wipe the Automatic Voltage Control

. Rheostat SAT

[10.4} RAISE voltage to 7300 volts on IO-EI-82-41 USING

[O-HS-82-1 2]. UNSAT Standard Examinee places 0-HS-82-12 DG lA-A VOLTAGE REGULATOR to RAISE (CLOCKWISE) and attains 7300 volts on EI-82-4.

Comment

1201 NRC Simulator JPM F Page 7 of 11 STEP 6 [101 PERFORM Ue following to wipe tle Automac Voltage Cantro

. Rheostat SAT

[10.51 RETURN voltage to value recorded in 6.1[1O.1j. UNSAT Standar& Examinee places O-HS-82-12 to LOWER (COUNTER-CLOCKWISE) and lowers voltage to the step 10.1 value.

Comment

[11J PLACE [O-HS-82181, DG lA-A Mode Seector Switch n the STEP 7  : PARALLEL positon. SAT UNSAT Critical Step Standard:

Comment

[12J ADJUST FO-HS-82i31, DG IA-A Speed Control Switch to STEP 8 obtain a sflchroscope indicatkxi of s1o1y rotating in me SAT LFAS1I direction UNSAT Examinee adjusts 0-HS-82-1 3 DG 1 A-A Speed Control Switch such that Standard: synchroscope (Xl-82-31) is moving slowly in the fast direction (slowly clockwise).

Comment

1201 NRC Simulator JPM F Pafle 8 of 11 NOTES

1) With Ambient Start being performed, the generator must be loaded between 3.96 and 4.4 MW immediately after breaker 1912 is closed.
2) During steps &I [1 51 and 61 Ii&] the Load vs. VAR limits of Attachment 1 must be observed when loading the Diesel Generator. The bad requirements of between 3.96 to 4.4 maJ be reduced to 2.2 MW if both units are in MODES and/or 6.
3) When closing the Diesei Generator Output Breaker at the 12 oclock position, consideration should be given to the speed of rotation of the synchroscope needle and the response time it takes to close the breaker.
4) The following table provides an approximation of expected values at various DG loading plateaus. These values shall be monitored to provide alternative M-26 indications thus ensuring proper diesel generator loading. The values given are calculated approximations and may vary due to system variables. (e.g. If amps are 370 and Mvar have been adjusted to 2.0 Mvar then V should be appiox. 4.0.)

MW Mv Amps (0-El-82-IOA) {0-El-82-1 IA) (0-EI-82-9R) 0.5 MW 0.5 Mvar 60 Amps 1.0MW OJ5Mvar iQOAmps 2OMW 1.OMvar 1&SArrçs 3.0 MW 1.0 Mvaf 260 Arrs 4.0 MW 1.5 Mvar 350 Arrçs 4.0 MW 2.0 Mvar 370 Arrs 4.2 MW 1.5 Mvar 370 Arrps 4.2 MW 2.0 Mvar 385 Arrs 4,4 MW 1.5 Mvar 385 Arrs 4.4 MW 2.0 Mvar 400 Arrps 4.8MW 1.5Mvar 4l5Arnps

$8 MW 2.0 Mvar 430 Amps 2Hr rating limitations apply

5) CSST C Lit. Y, Tap Position Indication on 0-ECB-4 should be observed prior to and during paralleting to the 6.9 kv Shutdown Board. Tap changer operation during this time can cause a DIG voltage change.
  • [131 ENSURE [IhHS-82-121, DG IA-A Voltage Regulator Switch in STEP 9 PULL-P-AUTO position, AND SAT ADJUST to match incoming voltage with running voltage. UNSAT Standard: Examinee adjusts DIG voltage such that incoming voltage (EI-82-4) and running voltage (EI-82-5) are approximately equal.

Comment

1201 NRC SimulatorJPM F Page 9 of 1 1 STEP 10  : I Start of Cntical Step(s) I SAT

[141 WHEN the Synchroscope DG IA-A [0-XI-82-11 indicates 12 odock posnon. THEN UNSAT CLOSE breaker [19121 via 11-RS-576A1, 1912 DO IA-A to SD SD 1A-\ AND Critical Ste START stopwatch.

End of Critical Step(s) I Examinee places 1-HS-57-46A, 1912 DQ lA-A to SD BO IA-A to Standard: CLOSE when O-X1-82-1 indicates +/-10 degrees of top deact center of 12 oclock position and breaker 1912 DG IAAto SD BD IA-A CLOSES.

Cue Provide the following cue, Another operator will operate the stopwatch.

Comment MOTE Steps 61(151 and 6.1(16] must be completed within 64) second&

[151 IMMEDIATELY LOAD DiG 1 A-A to 1.0 MW by performing STEP 11 .

. SAT

[15.11 PLACE 1O-HS-82-131, DO IA-A Speed Control Switch in RAISE and obtain 1.0 MW on 10-El-82-IOAI DO IA-A UNSAT Megawatts.

Examinee places 0-HS-1 3 DG lA-A Speed Control Switch to RAISE Standard: CLOCKWISE) and attains 1.0 MW on 0-El-82-1 OA DG 1 A-A Megawatts in less than 60 seconds Examiner When the examinee raises EDG load direct the Booth Operator insert Note: annunciator override AN_CV_923 f:2.

Comment

1201 NRC Simulator JPM F Page 10 of 11 ANNUNCIATOR O-XA-55-26A DIESEL GEN 14-A CRANKCASE PRESS HIGH ENGINE I OR 2 ALTERNATE PATH STEP 12  : SAT Corrective [1] IF DIG rjnnnq Th no aI accdent bIackout or Sfl Actions aresent. ThEN UNSAT ENSURE DIG shutdown by depres-sirg emergency stop Critical Step Standard:

Direct the booth operator to trip the 1 A EDG if the examinee fails to Examiner manually emergency trip the 1A EDG within 3 minutes of the receipt of Note: the DIESEL GEN lA-A CRANKCASE PRESS HIGH ENGINE 1 OR 2 alarm.

Comment Terminating The task is complete when the Examinee depresses emergency Cue: stop pushbutton O-HS-82-17A, DG lA-A EMERGENCY STOP. STOP Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Assume all independent and concurrent verifications are completed when called for by the procedure.

INITIAL CONDITIONS:

1. Unitl andUnit2areinMODEl.
2. lA-A DIG is INOPERABLE due to maintenance
3. Maintenance has been completed on the lA-A D/G and the clearance has been removed.
4. All personnel required to perform the test are on station.
5. All Section 4.0 PREREQUISITE ACTIONS of 1-SI-OPS-082-007.A are complete.
6. Section 6.1 of 1 -SI-OPS-082-007.A has been completed through step 6.1.9.

INITIATING CUES:

1. The SRO has directed you to load the 1 A EDG using 1-SI-OPS-082-007.A starting at step 6.1.10
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1201 NRC SIM G (RO/SRO)

1201 NRC Simulator JPM G Page 2 of 12 ROISRO JOB PERFORMANCE MEASURE Task: Emergency Mode Control Room Isolation due to High Radiation Task#: 0880980101 Task Standard: The examinee will manually place one train of Emergency Control Room Ventilation in service and isolate Normal Control Room Ventilation.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: APE 061 AA1 .01 (3.6/3.6)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name I Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 15 minutes Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

1201 NRC Simulator JPM G Page 3 of 12 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. ResettolCl6
3. An extra operator will be required to acknowledge alarms.
4. ACKNOWLEDGE ALARMS
5. FREEZE SIMULATOR.
6. When directed insert the following:
  • IMF CHO7A, failure of Train A Control Room Isolation
  • IMF CHO7B, failure of Train B Control Room Isolation
  • IMF RM90125 to 10000 ramp 300 to set RM-90-125, Control Room Rad monitor, to a high rad condition.
  • I ME RM9O1 26 to 10000 ramp 300 to set RM-90-1 26, Control Room Rad monitor, to a high rad condition.
  • Override AN_OV_1 255 to ON delay 10 to set Control Room Isolation Train A alarm
  • Override AN_OV_i 262 to ON delay 10 to set Control Room Isolation Train B alarm
7. Save as a temporary IC, if repeat runs of JPM will be desired.
8. PLACE SIMULATOR IN RUN when directed by the Lead Examiner
9. After JPM is complete, delete the temporary IC, if used.

Tools/Equipment/Procedures Needed:

0-SO-30-2 Control Room Isolation

References:

Reference Title Rev No.

0-SO-30-2 Control Room Isolation 14 1-AR-M6-C CVCS-HEAT TRACE-UHI 34 0-AR-M12-B COMMON RADIATION MONITOR 29

1201 NRC Simulator JPM G Page 4 of 12 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. You are the Unit 1 CR0.

INITIATING CUES:

1. Respond to plant conditions.

1201 NRC Simulator JPM G Page 5 of 12 Start Time CONTROL ROOM CONTROL ROOM ISOLATI ON ISOLATION TRAIN A TRAIN B CorrectIve [1] ENSURE Control Room lsolatiOru STEP 1 : Acio SAT REFER TO Section 81 of 0-50-30.2, Emergency Mode Control Room Isolation. [C.4]

UNSAT Standard: Examinee responds to alarm using 1 -AR-M6C window E-5 or E-6 and refers to 0-SO-30-2 Control Room Isolation.

Examiner The examinee may place HS 31A-7A and HS 31A-38A Control Bldg Isol Note: Train A and B to ACTUATE in an attempt to manually actuate a Control Bldg Isolation.

Examiner Inserted simulator malfunction disables the Control Building Isolation Note: automatic and manual isolation signals.

Examiner Examinee may address the M12B alarms in the next JPM step, if not Note: proceed to JPM step 3 on the next page.

Comment

1201 NRC Simulator JPM G Page 6 of 12 O-RA-9Oi25A O-RA9O-I26A MAIN CNTL RM MAIN CNTL RM INTAKE MON INTAKE MON HIGH RAD HIGH RAO Corrective [1] IF Control Room isolation signal is in, via 1XA-S5-&C window E-5 EP 2 Actions or E6 in alarm THEN SAT REFER TO G-SO-30-2, Cortrot Room tsoian.

[21 REQUEST RADCON to sw-ey (or radiological hazards.

U NSAT

[3] PERFORM O-SO-30-2, Ccntiol Room solotion, to reccer from control room isdation Standard Examinee responds to alarm using O-AR-M12B window C-7 or D-5 and refers to 0-SO-30-2 Control Room Isolation.

Q If asked acknowledge communication to Radcon.

Examiner Note: May have been previously performed.

Comment STEP Obtain a copy of 0-SO-30-2 Control Room Isolation 3  : SAT UNSAT Standard: Examinee obtains a copy of 0-SO-30-2 Control Room Isolation Qu Provide a copy of 0-SO-30-2 Control Room Isolation Section 8.1 Cue If asked provide the following cue, O-SO-30-2 Control Room Isolation section 4 is complete.

Comment

1201 NRC Simulator JPM G Page 7 of 12 STEP 4  : [1] ACKNOWLEDGE Control Room Ventilation Isolation alarm, SAT UNSAT Standard: Examinee acknowledges CR1 alarm.

Comment STEP 5 : [2] iF CR1 is from a valid SIS or High Radiation signal, THEN SAT NOTIFY RADCON to monitor Control Building el. 732 work UNSAT areas for habitability impact Examinee determines that alarm is valid by observing RM-90-1 25 and Standard: 126 alarms or by verification in ICS and notifies the Radcon to take air samples and determine if the MCR must be evacuated.

Q!A. If asked acknowledge communication to the Radcon.

Comment

[31 ENSURE either Control Building A/C AHU RUNNING and STEP 6 . associated AHU inlet OPEN: SAT UNSAT CONTROL 5LDG RUNNING AHU INLET OPEN AICAHU A C O-FCO-311-20 C 8 0 O-FCO-31 1-23 0 Examinee verifies that B Train Control Building A/C AHU is running and Standar& 0-FCO-31 1 -23 is open by observing red light on Xl-31 1 -23A (Panel 1 -M

6) or red light above 0-HS-23A is ON and red light for indicator 0-Xl-31 1-23 (Panel 1-M-1 1) is ON Comment

1201 NRC Simulator JPM G Page 8 of 12 STEP 7 : [4] iF Control Building A/C AHUs stopped 7 THEN SAT DISPATCH personnel to:

UNSAT

[41] OPEN Mechanical equipment room door C-39

[42] OPEN MCR door C-48 or C-56 Standard Examinee verifies Control Building A/C AHUs are running and addresses the step as not applicable.

Comment

[5] ENSURE either Electhcal Board Room Chilfer RUNNING and STEP 8 associated AHU inlet OPEN: SAT UNSAT ELECTRICAL RUNNING AHU INLET OPEN BOARD ROOM AJC AHU A C O-FCO-31 1-27 C B C O-FCO-31 1-28 C Examinee verifies that B Train Electrical Board Room NC AHU is running Standard and 0-FCO-31 1-28 is open by observing red light above 0-HS-31 1 -28A ELECT BD ROOM NC AHU B is ON and red light for indicator 0-Xl-31 1-28 ELECT BD RM AHU B INLET is ON.

Comment

1201 NRC Simulator JPM G Page 9 of 12 STEP 9 ALTERNATE PATh SAT

[6j ENSURE either Control Building Emergency Air Cleanup fan RUNNING and associated fan inlet OPEN: UNSAT Critical Step CONTROL BLDG RUNNING FAN INLET OPEN EMERGENCY AIR CLEANUP FAN A D O-FCO-311-9 C B C O-FCO-311-11 C Examinee places O-HS-31 t-6A CNTL BLDG EMER AIR CLEAN U FANAORO4-IS-311-IOACNTL BLDG UP FAN B toSTAR1I Examinee verifies damper 0-FCO-31 1-9 is open by observing red light Standard: for indicator 0-XI-31 1-27 ON OR Examinee verifies damper 0-FCO-31 1-11 is open by observing red light for indicator 0-Xl-31 1-28 ON both fans in service is acceptable.

)osition indication verification is not critical

1201 NRC Simulator JPM G Page 10 of 12 STEP 10 ALTERNATE PATH SAT

[Tj ENSURE at least one Emergency Air Pressurizing Fan RUNNING and associated fan inlet OPEN: UNSAT Critical Step CONTROL BLDG RUNNING FAN INLET OPEN EMERGENCY AIR CLEANUP FAN A C Q-FCO-311-108 C B C O-FCO-311-109 C ExamineeplacesO-HS-3lli08ACNTL BLDG EMERG PRESS FAN A OR 0-HS-31 I-109A CNTL BLDG EMERG PRESS FAN B to STARTS Examinee verifies damper 0-FCO-31 1-108 is open by observing red light Standard: for indicator 0-Xl-31 1-27 ON OR Examinee verifies damper 0-FCO-31 1-109 is open by observing red light for indicator 0-Xl-31 1 -28 ON Examiner . .

Note: Placing both fans in service is acceptable.

Examiner Note: The damper position indication verification is not critical Comment STEP 11  : ALTERNATE PATH SAT

[8] ENSURE MCR and Spreading Room Fresh Air Fans STOPPED: N AT

    • Critical Step

[8.11 Spreading Room Supply Fan.

Standard: Examinee places O-HS-311-36A Spreading Room. Supply Fan to STOP Comment

1201 NRC Simulator JPM G Page 11 of 12 STEP 12 [8] ENSURE MCR and Spreading Room Fresh Air Fans

. STOPPED: SAT UNSAT

[8.2] Spreading Room Exhaust Fan A.

Critical Step Standard Examinee verifies Spreading Room Exhaust Fan A is stopped by observing green lights above HS-311-79A0N.

Comment STEP 13 ALTERNATE PATH

SAT 18] ENSURE MCR and Spreading Room Fresh Air Fans STOPPED: UNSAT Critical Step

[8.3] Spreading Room Exhaust Fan B.

Standarc[ Examinee places 0-HS-311-80A Spreading Room Exhaust Fan B to STOP Comment Terminating Provide the following cue, another operator will complete the Cue: remaining steps of this procedure. S 0 Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Assume all independent and concurrent verifications are completed when called for by the procedure.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. You are the Unit 1 CR0.

INITIATING CUES:

1. Respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1201 NRC SIM H (RO/SRO)

1201 NRC Simulator JPM H Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task: Respond to a Leak in the Component Cooling Water System.

Task #: 0000260501 Task Standard:

Examinee manually trips the Reactor and manually trips the Reactor Coolant Pumps.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: APE 026 1 .05 (3.1/3.1)

Method of Testing:

Simulated Performance: Actual Performance: X Evaluation Method:

Simulator X In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name I Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 12 minutes Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

1201 NRC Simulator JPM H Page 3 of 14 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. ResettolCl6
3. Insert the following malfunctions:
  • CC2O, 1 -FCV-70-63 fails to open automatically.
4. An extra operator will be required to acknowledge alarms.
5. ACKNOWLEDGE ALARMS
6. FREEZE SIMULATOR.
7. When directed insert the following malfunction:
  • CCO1 35, Component Cooling Line Break
8. Save as a temporary IC, if repeat runs of JPM will be desired.
9. PLACE SIMULATOR IN RUN
10. After JPM is complete, delete the temporary IC, if used.

Tools/EquipmentlProcedures Needed:

0-AR-M27-B-B Component Cooling AOP-M.03 Loss Of Component Cooling Water

References:

Reference Title Rev No.

0-AR-M27-B-B Component Cooling 17 AOP-M.03 Loss Of Component Cooling Water 14

1201 NRC Simulator JPM H Page 4 of 14 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. You are the Unit 1 CR0 INITIATING CUES:
1. Respond to plant conditions.

1201 NRC Simulator JPM H Page 5 of 14 Start Time UNIT 1 CCS SURGE TK LVL LO AUTO MAKEUP INFJIATEO CHECK irge tank eveI hyobsering f1iJ7O-63A1.

STEP 1  : SAT UNSAT Examinee checks CCS surge tank level decreasing by observing 1-Ll Standard: 99A CCS SURGE TK A OUTLET LEVEL B Header and 1 -Ll-70-63A CCS SURGE TK A INTLET LEVEL A Header.

Examiner The examinee may address alarm window C-2 which starts on JPM step Note: 4 on the next page.

Comment

[2 VERIFY 1-LCV-70-63 OPEN STEP 2  : SAT UNSAT Standar& Examinee places 1-HS-70-63A CCS Surge Tank A Inlet Isolation to OPEN.

Comment

1201 NRC Simulator JPM H Page 6 of 14 operator for local inspection to determine proNem.

STEP SAT

[41 VERIFY proper valve agnnient in accordance with 1-S0-70-1, Component Cooling WoterSystem Train A, and 0-SO-b-i Component Cooling Water System Train B UNSAT

[5] MONITOR level in both surge tanks to determine seal leakage return problems.

[6] MONITOR leveL iise n pocket sump for possible CCS leak inside containment

[7] F sufficient level cannot be maintained, THEN GO TO AOP-M.03. Loss of Component Coong Water for errrgency makeut instructions, [C.iJ Standard Examinee dispatches an operator to investigate the leak and transitions to AOP-M.03 Loss Of Component Cooling Water.

IL If asked acknowledge the direction to investigate the leak.

Comment UNT1 CCS SURGE TANK LEVEL ABNORMAL

. [1] CHECK swge tank level on 0-M-270 l observing STEP 4 (1-L170-99NB1. SAT UNSAT Examinee checks CCS surge tank level decreasing by observing 1 -LI Standard: 99A CCS SURGE TK A OUTLET LEVEL B Header and 1 -LI-70-63A CCS SURGE TK A INTLET LEVEL A Header.

Comment

1201 NRC Simulator JPM H Page 7 of 14

[2) iF SU taflJ( level l THEN STEP 5 SAT UNSAT Standard: Examinee addresses the step as not applicable and goes to step 3.

Comment

[3) [F surge tank level is Io ThEN STEP 6  : SAT

[aj DISPATCH operator to investigate proberm

[b] IF suflicient level cannot be maintained, ThEN GO TO AORMO3. Loss of Componenl Cooling Water. UNSAT Standard Examinee dispatches an operator to investigate the leak and transitions to AOP-M.03 Loss Of Component Cooling Water.

d2 If asked acknowledge the direction to investigate the leak.

Comment STEP 7 Obtain a copy of AOP-M.03 Loss Of Component Cooling Water

SAT UNSAT Standard Examinee obtains a copy of AOP-M03 Loss Of Component Cooling Water Provide copy of AOP-M.03 Loss Of Component Cooling Water Comment

1201 NRC Simulator JPM H Page 8 of 14 I DIAGNOSE the taHure:

STEP 8 SAT GOTO

[_F...

SECTION PAGE UNSAT Train A Surge Tank level lowering below 61%

[1(2)-LI-70-63A1 Train A CCS Headers high or low 110w a Rx Bldg Header

  • Misc Equipment Header 23 16 a SFPHXSupptyHeader a Train A ESF Keader Train A temperatures rising in conjunction with abnormal 110w Examinee observes Train A Surge Tank level lowering below 61% on 1-Standard: LI-70-63A CCS SURGE TK A INTLET LEVEL A Header and selects section 2.3 Comment CAUTION
  • If Train A CCS flow is lost and CANNOT be restored promptly OR if RCP motor thrust bearing temp alarm (M-5B, E4) is received.

then RCPs must be stopped in Step 1 to prevent damage.

a If any Containment Spray Pump is running with NO CCS cooling, spray pump may experience bearing failure after 10 minutes.

NOTE If reactor must be tripped, the CR0 or an extra UO should be assigned to continue with this AOP.

I MONITOR the following:

STEP 9  : SAT a REACTOR COOLANT PUMPS MOTOR THRUST BEARING TEMP UNSAT HIGH annunciator DARK. [M-56, E-31 CCS flow established to Rx Bldg Supply Header. [Fi-70-142, O-M-27BJ Examinee monitors REACTOR COOLANT PUMPS MOTOR THRUST BEARING TEMP HIGH annunciator DARK. [M-5B, E-3]

Standard:

AND CCS flow established to Rx Bldg Supply Header by observing 1 -FI 142, Rx BLDG SUPPLY HDR FLOW on panel 0-M-27B Comment

1201 NRC Simulator JPM H Page 9 of 14 STEP 2. DISPATCH operatocs with radios to Aux 10 SAT Bldg to locate failure and perform valve manipulauons.

UNSAT Standard: Examinee dispatches operators with radios to Auxiliary Building.

Cue If asked acknowledge the direction to locate failure and perform valve manipulations.

Comment STEP 11 -

DiSPATCH an operator with radio to perform Appendix A, Operation of SAT App R Valves Required by Section 23 UNSAT Standard Examinee dispatches operators with radios to perform Appendix A, Operation of App. R Valves Required by Section 2.3.

Qia If asked acknowledge the direction to perform Appendix A.

Comment

1201 NRC Simulator JPM H Page 10 of 14 NOTE

  • When Train A CCS is out of service, the affected units Train A CCPs, SI Pumps, and RHR Pumps are INOPERABLE for ECCS purposes due to riot being able to fullill their design function for sump recirculatiori (due to toss of CCS to RHR HX)
  • If necessary, the affected CCPs, Si Pumps, and RHR Pumps can be operated without OCS cooling water to mechanical seal HXs. fC.4]

STEP EVALUATE Tech Specs and EPIP-i 12 SAT USING Appendix H.

UNSAT Standard: Examinee addresses the procedure step If asked acknowledge the direction to evaluate Tech Specs and EPIP-1.

Comment STEP 13  : 5. CHECK ERCW flows NORMAL for present plant codrtions: SAT

. 2-Fl-67-61, 2A Supply Header

. 2-Fl-67-62, 2B Supply Header Examinee checks ERCW flows normal by observing the following indicators:

  • 1 -Fl-67-61, 1 A Supply Header Standard:
  • 2-Fl-67-62, 28 Supply Header Comment

1201 NRC Simulator JPM H Page 11 of 14 NOTE

  • In tile event of a A train line break, the surge tank baffle prevents the train from draining to less than 57% indicated level.
  • Appendix G lists expected responses to various CCS surge tank levels.

ALTERNATE PATH STEP 14  : SAT

6. MONITOR Train A CCS surge tank level UNSAT between 65% and 85%:
  • 1 (2)-U-7G-63A, Unit 1(2) A CCS Surge Tank Level.

Standard Examinee observes 1 -Ll-70-63A CCS SURGE TK A INLET LEVEL Header A, less than 65% and transitions to the RNO step Comment ALTERNATE PATH STEP 15  : SAT IF CCS surge tank level is less than 64%,

THEN UNSAT ENSURE surge tank auto makeup starts.

Examinee observes CCS surge tank level is less than 64% and Standard: manually places 1 -HS-70-83A CCS Surge Tank A Inlet Isolation to OPEN.

Examiner Note: May have been previously performed.

Comment

1201 NRC Simulator JPM H Page 12 of 14 ALTERNATE PATH STEP 16  : SAT

7. MONITOR Train A CS:

UNSAT

  • Train A GCS surge tank level greater than 20%
  • at least one Train A CCS pump running and dehvering stable Dow Standard Examinee monitors Train A CCS surge tank level trending to or less than 20% and transitions to the RNO step.

Examiner If CCS Surge Tank level is > 20%, the examinee will continue with steps Note: 8, 9, and 10 and return to step 7 (this step) to perform the RNO actions..

Comment ALTERNATE PATH STEP 17 SAT IF any Train A cCS pump is cavtatng OR loss of surge tank level is imminent.

UNSAT THEN Critical Step STOP and LOCK OUT affected CCS pump(s).

Standard: Examinee places 1 -HS-70-38A, CCS pump 1 B-B in STOP PULL TO LOCK Comment

1201 NRC Simulator JPM H Page 13 of 14 STEP 18  : ALTERNATE PATH SAT IF Train A CCS flow is last, THEN PERFORM the following for affected unit: Critical Step

a. IF affected unit in Mode 1 or 2, THEN:
1) TRIP reactor.

Standard: Eaminee places RTI OR RT2 ReactorTrip Switch to TRIP Comment STEP ALTERNATE PATH 19  : SAT IF Train A CCS flow is last, THEN PERFORM the fbNowing for affected unit: Critical Step a iF affected unit in Mode 1 012, THEN:

2) WHEN reactor is tripped, THEN STOP RCPs r

I-KS-686O Reactor Coolant PumpS HS-6-73 ReactorCoolarit Pm4 Comment Terminating Provide the following cue, Another operator will complete the Cue: remaining steps in this procedure. STOP Stop Time

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Assume all independent and concurrent verifications are completed when called for by the procedure.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. You are the Unit 1 CR0 INITIATING CUES:
1. Respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1201 NRC INPLANT I (RO/SRO)

1201 NRC Plant JPM I Page 2 of 9 RO/SRO JOB PERFORMANCE MEASURE Task: Local Control of Charging Flow (2-FCV-62-93)

Task#: 0040390104 Task Standard: 2-FCV-62-93 placed in local manual control and charging/seal flow has been adjusted to nominal values.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A ReferencelRatings: APE 028 AA1 .07 (3.3/3.3)

Method of Testing:

Simulated Performance: X Actual Performance:

Evaluation Method:

Simulator In-Plant X Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name! Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 10 minutes Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

1201 NRC Plant JPM I Page 3 of 9 SPECIAL INSTRUCTIONS TO EVALUATOR:

Tools/Equipment/Procedures Needed:

2-SO-62-1, section 8.4

References:

Reference Title Rev No.

2-SO 1 CVCS 62 READ TO OPERATOR HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit2isin Model
2. Pressurizer level is on program.
3. Normal letdown and charging are in service with 2A-A CCP running
4. Plant conditions require local control of 2-FCV-62-93 (charging) for maintenance on the normal controller.
5. All prerequisite actions are completed.
6. 2-HIC-62-93 charging flow controller is failing to properly control pressurizer level in automatic.
7. Troubleshooting has revealed that the flow modifier (2-FM-62-93B) must be replaced/repaired.

INITIATING CUES:

1. The Unit 2 RD has directed to establish local control of 2-FCV-62-93 using 2-SO-62-l, CVCS section 8.4.
2. Adjust charging flow as necessary to as determined by the control room operator.
3. Inform the RD when complete.

1201 NRC Plant JPM I Page 4 of 9 Start Time STEP Obtain a copy of 2-SO-62-1, CVCS section 8.4.

1 : SAT UNSAT Standard: Examinee obtains a copy of 2-SO-62-1, CVCS section 8.4.

Provide a copy of 2-SO-62-1, CVCS section 8.4.

Comment STEP 2 : [1] OBTAIN permission from the Unit 2 US/SRO to locally SAT control 2-FCV-62-93.

UNSAT Standard Examinee obtains permission from Unit 2 SRO to locally control 2-FCV-62-93.

Cue If asked provide the following cue, The Unit 2 RO has given you permission to locally control 2-FCV-62-93.

Examiner . . . . ..

note: Permission was implied during the initiating cue Comment

1201 NRC Plant JPM I Page 5 of 9

[2] ESTABLISH communication between the local operator at STEP 3 SAT

. panel 2-L-1 12A and the Unit operator.

UNSAT Standard Examinee simulates establishing radio communications between UO and local operator.

Cue If asked acknowledge establishing communications with the Control Room Comment STEP 4  : [3] ENSURE that a CCP is in service and that f2-FCV-62-981 SAT and [2-FCV-62-99j are OPEN.

UNSAT Examinee simulates contacting the Control Room and determines Standard: CCP is in service and that [2-FCV-62-98] and [2-FCV-62-99] are OPEN.

Cue If asked provide the following cue, A charging pump is in service and [2-FCV-62-98] and [2-FCV-62-99] are OPEN.

Comment

1201 NRC Plant JPM I Page 6 of 9 NOTE Charging flow abnormal Annunciator may actuate during transfer.

STEP 5  : [4] MATCH the setpoint (red pen) and the actual reading SAT (black pen) using 12-HLC-62-93B1.

UNSAT Critical step Standard Examinee simulates turning 2HlC-62-93B CHARGING HEADER FLOW CONL clockwise to raise the setpoint (red pen).

When the examinee locates 2-HIC-62-938 CHARGING HEADER Cue: FLOW CONT. provide the following cue, The black indicator is 34%

and the red indicator is 0%.

After the examinee simulates rotating 2-HIC-62-93B CHARGING Cue: HEADER FLOW CONT. clockwise provide the following cue, The black indicator is 34% and the red indicator is 34%.

Examiner Turning knob clockwise will raise setpoint. (Direction to turn during note JPM depends on as found position of red pen in relation to black pen)

Comment

[5] PLACE 12-HIC-62-93B] charging flow control in MANUAL. SAT STEP 6 UNSAT Critical step Standard mI rotates 2-HIC-62-936 CHARGING HEADER FLOW to MANUAL Cue When the examinee simulates rotating 2-HIC-62-93B provide the

. following cue, 2-HIC-62-93B is in MANUAL.

Comment

1201 NRC Plant JPM I Page 7 of 9 STEP 7  : [6] VERIFY [2-Xl-62-931 on panel 2-M-5 is illuminated. SAT UNSAT Standard: Examinee simulates contacting the Control Room and determines 2-XI-62-93 on panel 2-M-5 is illuminated.

Cue: If asked provide the following cue, 2-Xl-62-93 on panel 2-M-5 is illuminated.

Comment NOTE Charging header flow can be monitored on 2-Fl-62-93B on panel 2-Li i 2A.

[7] ADJUST charging flow as directed by Unit operator. SAT UNSAT Critical step Examinee raises flow by turning knob for 2-HIC-62-93B CHARGING HEADER FLOW CONT. clockwise.

When asked provide the following cue, The Unit 2 RO reports charging flow is 80 gpm and directs you to raise flow to 87 gpm.

After the flow adjustment provide the following cue, Another operator will complete the remaining steps of this procedure.

Turning knob for 2-HIC-62-93B CHARGING HEADER FLOW CONT.

clockwise will raise flow, counterclockwise will reduce flow.

Examinee may observe 2-Fl-62-93B CHARGING HEADER FLOW while monitoring flow.

1201 NRC Plant JPM I Page 8 of 9 Terminating The task is complete when the Examinee returns the JPM briefing Cue: STOP sheet to the examiner Stop Time

JPM BRIEFING SHEET DIRECTIONS TO EXAM INEE:

All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit2isinModel
2. Pressurizer level is on program.
3. Normal letdown and charging are in service with 2A-A COP running
4. Plant conditions require local control of 2-FCV-62-93 (charging) for maintenance on the normal controller.
5. All prerequisite actions are completed.
6. 2-HIC62-93 charging flow controller is failing to properly control pressurizer level in automatic.
7. Troubleshooting has revealed that the flow modifier (2-FM-62-93B) must be replaced/repaired.

INITIATING CUES:

1. The Unit 2 RO has directed to establish local control of 2-FCV-62-93 using 2-SO-62-1, CVCS section 8.4.
2. Adjust charging flow as necessary to as determined by the control room operator.
3. Inform the RO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1201 NRC INPLANT J (RO/SRO)

1201 NRC Plant JPM J Page 2 of 8 RO/SRO JOB PERFORMANCE MEASURE Task: Local Manual Control of a S/G PORV Task#: 0000010504 Task Standard: The Exam inee establishes local manual control of Unit 1 S/G #1 PORV by use of the local manual handwheel.

Alternate Path: YES: X NO:

Time Critical Task: YES: NO: X K/A Reference/Ratings: EPE 038 EA1.16 (4.4/4.3)

Method of Testing:

Simulated Performance: X Actual Performance:

Evaluation Method:

Simulator In-Plant X Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name I Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 10 minutes Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

1201 NRC PIantJPMJ Page 3 of 8 SPECIAL INSTRUCTIONS TO EVALUATOR:

Tools/Equipment/Procedures Needed:

EA-1 -2 Local Control of S/G PORVS

References:

L Reference Title Rev No.

EA-1 -2 Local Control of S/G PORVS 4 READ TO OPERATOR HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Uniti is in MODE3
2. E-3, Steam Generator Tube Rupture is in progress.

INITIATING CUES:

1. The Unit 1 RO has directed you, the Unit 1 Control Bldg AUC to take local control and open S/G #1 atmospheric relief using EA-1-2, Local Control of S/G PORVs.
2. Inform the RO when complete.

1201 NRC Plant JPM J Page 4 of 8 Start Time 3.0 PRECAUTIONS AND LIMITATIONS 3.1 Precautions B. When using the atmospheric relief dog handwheel to open the PORV, turning the dog handwheel clockwise opens the atmospheric relief and turning the dog handwheel counterclockwise allows the atmospheric relief to close.

Obtain a copy of EA-1 -2, Local Control of SIG PORVs STEP 1  : SAT UNSAT Standard: Examinee obtains a copy of EA-1 -2, Local Control of SIG PORVs QLQ Provide a copy of EA-1 -2, Local Control of SIG PORVs Comment STEP 2  : 41 Section Applicability SAT

1. SELECT applicable unit: UNSAT

. Uniti

. Unit2 Standard: Examinee selects Unit 1 as the applicable unit.

Comment

1201 NRC Plant JPM J Page 5 of 8 STEP  : 2. SELECT SIG(s) requiring local control of its atmospheric relief; 3 SAT

. S/G1 UNSAT

. S/G2

. 31G3

. SIG4 Standard Examinee selects S/G 1 as the S/G requiring local control of its atmospheric relief.

Comment STEP 4  : 3. IF throttling of atmospheric relief(s) desired, SAT THEN GO TO Section 42. UNSAT Standard: Examinee transitions to section 4.2 Comment

1201 NRC Plant JPM J Page 6 of 8 4.2 ThrottlIng Atmospheric Reliefs NOTES

  • PCV-1-5 (SIG 1) and PCV-1-23 (SIG 3) fail closed on loss of Train A air.
  • PCV-1-12 (S/G 2) and PCV-1-30 (SIG 4) fail closed on loss of Train B air.
  • Unit 2 Only: Cheater wrench (staged locally> may be needed to throttle 2-PCV-1-30 (SIG #4).

STEP 5  : 1. ESTABLISH radio communications between UO and local operator. SAT UNSAT Standard Examinee simulates establishing radio communications between UO and local operator.

Cue If asked acknowledge establishing communications with the Control Room Comment ALTERNATE PATH STEP 6  : SAT

2. IF control air available, UNSAT THEN PERFORM the following for selected S/G(s):

Examinee determines control air is not available and proceeds to step Standard:

When the examinee locates 1 -HCV-1 -6 controller for 1 -PCV-1 -5, C

provide the following cue, Air pressure is 0.

If the examinee looks at air pressure coming from main header (on C

pressure regulator), provide the following cue, Air pressure is 0.

Cue If examinee contacts the control room, acknowledge communication.

Comment

1201 NRC Plant JPM J Page 7 of 8 ALTERNATE PATH STEP 7 : SAT

3. IF control air NOT available, UNSAT THEN USE dog handwheel(s) to control atmospheric relief(s) as directed by Critical step I UO by performing the following as necessary:
  • TURN dog handwheel clockwise to open atmospheric relief.

Standar& Examines simulates turning dog handwheel fox 1-PCV-1-5 clockwise to open atmospheric< relief.

After the examinee has located the local operator for 1 -PCV-1 -5 Qki provide the following cue, The Unit 1 RO has directed you to open 1 -PCV-1 -5w After the examinee has simulated opening 1 -PCV-1 -5 provide the Q following cue, Time has been compressed, the Unit 1 RO has directed you to close 1-PCV-1-5.

Comment ALTERNATE PATH STEP 8  : . . .>

SAT 1 3. IF control air NOT available, THEN UNSAT USE dog handwheel(s) to control atmospheric relief(s) as directed by Critical step I UO by performing the following as necessary:

  • TURN dog handwheel counterclockwise to close atmospheric relief.

Standard Examinee simulates turning dog, handwheelfor 1-POV1-5 coirnter clockwise to close atmosph&ic relief After the examinee has simulated closing 1-PCV-1-5, provide the Q following cue, Another operator will perform the remaining steps of this procedure.

Comment Terminating The task is complete when the Examinee returns the JPM briefing ue. sheet to the examiner.

Stop Time

JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:

All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Uniti is in MODE3
2. E-3, Steam Generator Tube Rupture is in progress.

INITIATING CUES:

1. The Unit 1 RO has directed you, the Unit 1 Control Bldg AUO to take local control and open S/G #1 atmospheric relief using EA-1 -2, Local Control of S/G PORVs.
2. Inform the RO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 1201 NRC INPLANT K (RO/SRO)

1201 NRC Plant JPM K Page 2 of 9 RO/SRO JOB PERFORMANCE MEASURE Task: Refilling the Spent Fuel Pit (EA-78-1)

Task#: 0330330104 Task Standard: The examinee refills the spent fuel pit during a Spent Fuel Pit Level Low level event.

Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: 033 A2.02 32/3.5 Method of Testing:

Simulated Performance: X Actual Performance:

Evaluation Method:

Simulator In-Plant X Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator: /

Name! Signature DATE Performance Rating: SAT: UNSAT:

Validation Time: 17 minutes Total Time:

Performance Time: Start Time: Finish Time:

COMMENTS

1201 NRC PIantJPMK Page 3 of 9 SPECIAL INSTRUCTIONS TO EVALUATOR:

Tools/EquipmentlProcedures Needed:

EA-78-1, Refilling the Spent Fuel Pit

References:

Reference Title Rev No.

EA-78-1 Refilling the Spent Fuel Pit 4 READ TO OPERATOR HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Uniti isin MODEl
2. The Spent Fuel Pit level is dropping abnormally.
3. Spent Fuel Pit level is 725 5.5.
4. Demineralized water storage tank level is 85%.
5. Alarm M-15-B-E3 LS-59-18OAIB DEM WTR AND CASK DECON SYS ABN CONDITION is DARK
6. Radiological conditions for the area have been assessed and are acceptable for personnel entry.

INITIATING CUE:

1. The Unit 1 RO has directed you, the Unit 1 Auxiliary Bldg AUO to refill the spent fuel pit to above 726.5 from the demineralized water system using EA-78-1.
2. Inform the RO when complete.

1201 NRC Plant JPM K Page 4 of 9 Start Time CAUTION SFP area habitability and expected radiological conditions shall be considered prior to dispatching personnel for local actions.

NOTE EDMG-2 Appendix J provides alternative guidance for makeup if personnel CANNOT saf&y reach the SFP area.

1. REFER TO Appendix A for determining SFP level.

NOTE SFP refill should only be initiated when directed by MCR or TSC.

Obtain a copy of EA-78-1, Refilling the Spent Fuel Pit STEP 1  : SAT UNSAT Standard: Examinee obtains a copy of EA-78-1, Refilling the Spent Fuel Pit Provide a copy of EA-78-1, Refilling the Spent Fuel Pit Comment STE P 2  : SAT

2. IF SFP is to be refilled using Demin Water, UNSAT THEN GO TO Section 42.

Standard: Examinee transitions to section 4.2 Comment

1201 NRC Plant JPM K Page 5 of 9 4.2 Refilling Spent Fuel Pit From Demineralized Water System CAUTiON I Performing this section could reduce SFP boron concentration to below 2000 ppm.

CAUTION 2 During Dry Cask loading Iunloading, Spent Fuel Pit Boron concentration shall be maintained in accordance with the restrictions in 0-GO-17. An alternate means of borated makeup must be established prior to reducing the boron concentration to less than the limit due to Demin Water makeup.

NOTE A M-5 and Breakaway lock key will be required to unlock valves.

STEP 3  : 1. VERIFY demineraHzed water AVAILABLE. SAT UNSAT Examinee reviews initial conditions and determines alarm M-15-B-E3 St an d ar d*

LS-59-1 8OAJB is DARK or requests Control Room to get level Cue If asked provide the following cue, Demin Water Head tank Level is 85%.

Comment STEP 4  : 2. ESTABLISH communications between operators, SAT if possible, prior to commencing flow.

UNSAT Standard: Examinee establishes communications with the Control Room Cue If asked acknowledge establishing communications with the Control Room Comment

1201 NRC PIantJPMK Page 6 of 9 STEP 5  : 3. UNLOCK and OPEN demineralizer water makeup to SFP, SAT

[O-VLV-78-5141.

1 [Aux Bldg, elev 714, by SFP heat exchangerj UNSAT Critical step Standard amut locates and simulates opening O-VLV-78-51 DEMINERAUZER WATER MAKEUP TO SFP When the examinee locates the valve provide the following cue, The Cue valve stem follower is down.

Provide the following cue the examinee simulates positioning the Cue valve, HW turned several times in the counter clockwise direction and is now snug and the valve stem follower is up.

Comment SPENT FUEL PIT LEVEL INDICATOR WATER WATER ABOVE ABOVE RACKS FUEL EL 727.5 26-7 27-8 EL 126.5 25-T° 26-B EL 725.5 24-7 25-B EL 724.5 23-7 24-S Determine desired SFP level.

STEP 6  : SAT UNSAT Examinee refers to EA-78-1, Appendix A Determining Spent Fuel Pit Standard: Level and determines Spent Fuel Pit Level is adequate using the initiating cue.

Is asked, provide the following cue, Point to 726.5 on EA-78-1, Cue Appendix A Determining Spent Fuel Pit Level.

Examiner Location of the Spent Fuel Pit Level indicator is on the West wall of the Note: SFP and is viewed from the east side of the SEP elevation 734.

Comment

1201 NRC Plant JPM K Page 7 of 9 STEP 7  : 4. WHEN desired SFP level established, SAT I THEN CLOSE and LOCK UNSAT demineralizer water makeup to SFP [O-VLVJ85141.

[Aux Bldg, elev 714, by SFP heat exchangerl Critical step Emines locates and simulates closing O-VLV78-51 4 DEMINERALIZER StandardS WATER MAKEUP TO SEP.

When the examinee locates the valve provide the following cue, The Cue valve stem follower is up.

Provide the following cue the examinee simulates positioning the Cue valve, HW turned several times in the clockwise direction and is now snug and the valve stem follower is down.

Comment STEP 8  : 5. VERIFY SFP bOron concentration: SAT

a. NOTIFY Chem Lab to sample SFP boron concentration.

UNSAT

b. IF SFP boron concentration less than 2000 ppm OR less than applicable limit from O-GQ-17 (if cask limits in effect),

THEN CONSULT Chem Lab and RAISE SFP boron concentration as required.

Standard: Examinee simulates contacting the Chem Lab to sample the SEP.

Cue If asked acknowledge establishing communications with the Chem Lab.

Comment

1201 NRC Plant JPM K Page 8 of 9 STEP 9  : 6. GO TO Section 4.1, step in effect. SAT UNSAT END OF SECTION Standard: Examinee returns JPM BRIEFING SHEET to the examiner.

Comment Terminating The task is complete when the Examinee returns JPM BRIEFING Cue: SHEET to the examiner.

Stop Time

JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:

All steps shall be simulated for this JPM. WHEN ENTERING A UNIT TRIP HAZARD ZONE ENSURE YOU DO NOT TOUCH ANY SWITCHES WITHIN THAT ZONE. You will be provided initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. Assume all independent and concurrent verifications are completed when called for by the procedure. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1
2. The Spent Fuel Pit level is dropping abnormally.
3. Spent Fuel Pit level is 725 5.5.
4. Demineralized water storage tank level is 85%.
5. Alarm M-15-B-E3 LS-59-18OAIB DEM WTR AND CASK DECON SYS ABN CONDITION is DARK
6. Radiological conditions for the area have been assessed and are acceptable for personnel entry.

INITIATING CUE:

1. The Unit 1 RO has directed you, the Unit 1 Auxiliary Bldg AUO to refill the spent fuel pit to above 726.5 from the demineralized water system using EA-78-1.
2. Inform the RO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.