|
---|
Category:Letter
MONTHYEARNL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator IR 05000424/20240032024-10-30030 October 2024 – Integrated Inspection Report 05000424/2024003 and 05000425/2024003 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 ML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) ML24120A2832024-04-30030 April 2024 Project Manager Reassignment 2024-09-09
[Table view] Category:Meeting Notice
MONTHYEARPMNS20241406, Pre-Submittal Meeting Regarding a Proposed License Amendment Request to Revise Various Technical Specification Shutdown Actions Mode Change Restrictions2024-11-0707 November 2024 Pre-Submittal Meeting Regarding a Proposed License Amendment Request to Revise Various Technical Specification Shutdown Actions Mode Change Restrictions PMNS20241263, Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Increase Flexibility in Mode Restraints2024-10-0202 October 2024 Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Increase Flexibility in Mode Restraints PMNS20241255, Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2024-10-0101 October 2024 Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes PMNS20240906, Southern Nuclear Operating Company (SNC) Fleet Physical Barrier Exemptions2024-07-11011 July 2024 Southern Nuclear Operating Company (SNC) Fleet Physical Barrier Exemptions PMNS20240744, Pre-submittal Meeting with Southern Nuclear Operating Company to Discuss a Proposed License Amandement Request to Revise TS 3.3.8 Engineered Safety Feature Actuation System Instrumentation, for Vogtle Units 3 and 42024-06-13013 June 2024 Pre-submittal Meeting with Southern Nuclear Operating Company to Discuss a Proposed License Amandement Request to Revise TS 3.3.8 Engineered Safety Feature Actuation System Instrumentation, for Vogtle Units 3 and 4 PMNS20240750, Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Technical Specification (TS) 3.8.2, DC (Direct Current) Sources - Shutdown, for Vogtle Electric Generating Plant (Vogtle), Units 3 and 42024-06-0404 June 2024 Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Technical Specification (TS) 3.8.2, DC (Direct Current) Sources - Shutdown, for Vogtle Electric Generating Plant (Vogtle), Units 3 and 4 PMNS20240691, Southern Nuclear Operating Company (SNC) Fleet Physical Barrier Exemptions2024-05-21021 May 2024 Southern Nuclear Operating Company (SNC) Fleet Physical Barrier Exemptions PMNS20240662, Notice of Meeting with Southern Nuclear Operating Company (SNC) Regarding the Steam Generator (SG) Tube Inspection Report for Vogtle, Unit 12024-05-13013 May 2024 Notice of Meeting with Southern Nuclear Operating Company (SNC) Regarding the Steam Generator (SG) Tube Inspection Report for Vogtle, Unit 1 PMNS20240471, Annual Assessment Meeting2024-04-17017 April 2024 Annual Assessment Meeting PMNS20240400, Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Revise Condition a (One Valve or Damper Inoperable) of Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), for Vogtle, Units 3 and2024-04-0404 April 2024 Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Revise Condition a (One Valve or Damper Inoperable) of Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), for Vogtle, Units 3 and 4 PMNS20240399, Notice of Meeting with Southern Nuclear Operating Company2024-03-19019 March 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240397, Notice of Meeting with Southern Nuclear Operating Company2024-03-19019 March 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240396, Notice of Meeting with Southern Nuclear Operating Company2024-03-19019 March 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240398, Notice of Meeting with Southern Nuclear Operating Company2024-03-19019 March 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240379, Pre-Submittal Meeting Regarding Proposed Alternative Requests to Extend Exam Interval for Specific Components at Joseph M. Farley Nuclear Plant, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1 and 22024-03-15015 March 2024 Pre-Submittal Meeting Regarding Proposed Alternative Requests to Extend Exam Interval for Specific Components at Joseph M. Farley Nuclear Plant, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1 and 2 PMNS20240263, Pre-Submittal Meeting Between NRC and Southern Nuclear Operating Company (SNC) for a Proposed License Amendment Request Related to TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections, at Vogtle, Units 3 and 42024-02-22022 February 2024 Pre-Submittal Meeting Between NRC and Southern Nuclear Operating Company (SNC) for a Proposed License Amendment Request Related to TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections, at Vogtle, Units 3 and 4 PMNS20240143, Notice of Meeting with Southern Nuclear Operating Company2024-02-0101 February 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240141, Notice of Meeting with Southern Nuclear Operating Company2024-02-0101 February 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240140, Notice of Meeting with Southern Nuclear Operating Company2024-02-0101 February 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240142, Notice of Meeting with Southern Nuclear Operating Company2024-02-0101 February 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20231396, Pre-Submittal Meeting with Southern Nuclear Operating Company (SNC) Regarding a Proposed Relief Request for Explosively Actuated Valves at Vogtle Electric Generating Plant (Vogtle), Units 3 and 42023-12-15015 December 2023 Pre-Submittal Meeting with Southern Nuclear Operating Company (SNC) Regarding a Proposed Relief Request for Explosively Actuated Valves at Vogtle Electric Generating Plant (Vogtle), Units 3 and 4 PMNS20231383, Pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) Regarding the Proposed Transition of the Vogtle Electric Generating Plant, Units 3 and 4 Ndqam Into the SNC Fleet QATR2023-12-11011 December 2023 Pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) Regarding the Proposed Transition of the Vogtle Electric Generating Plant, Units 3 and 4 Ndqam Into the SNC Fleet QATR PMNS20231364, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231363, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231365, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231356, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231357, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231360, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231359, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231355, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231358, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231347, Notice of Public, pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) to Discuss a Proposed Fleet License Amendment Request (LAR) for Farley, Hatch, and Vogtle2023-11-29029 November 2023 Notice of Public, pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) to Discuss a Proposed Fleet License Amendment Request (LAR) for Farley, Hatch, and Vogtle PMNS20231198, Closed Meeting - Security-Related - SNC Fleet Physical Barriers Exemptions.The Basis for the Closed Meeting Is the Discussion of Official Use Only - Security-Related Information2023-10-25025 October 2023 Closed Meeting - Security-Related - SNC Fleet Physical Barriers Exemptions.The Basis for the Closed Meeting Is the Discussion of Official Use Only - Security-Related Information PMNS20231197, Pre-Submittal Meeting for Proposed License Amendment Request (LAR) to Reduce Ultimate Heat Sink (UHS) and Nuclear Service Cooling Water (NSCW) Fan Mission Times2023-10-24024 October 2023 Pre-Submittal Meeting for Proposed License Amendment Request (LAR) to Reduce Ultimate Heat Sink (UHS) and Nuclear Service Cooling Water (NSCW) Fan Mission Times PMNS20231113, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231119, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231114, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231115, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231112, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231111, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231116, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231118, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231117, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20230993, Pre-Submittal Meeting for a Proposed License Amendment Request to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves)2023-09-14014 September 2023 Pre-Submittal Meeting for a Proposed License Amendment Request to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) PMNS20231004, Notice of Meeting with Southern Nuclear Operating Company2023-09-0707 September 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231002, Notice of Meeting with Southern Nuclear Operating Company2023-09-0707 September 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231001, Notice of Meeting with Southern Nuclear Operating Company2023-09-0707 September 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231003, Notice of Meeting with Southern Nuclear Operating Company2023-09-0707 September 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20230909, Notice of Meeting with Southern Nuclear Operating Company2023-08-29029 August 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20230802, Notice of Meeting with Southern Nuclear Operating Company2023-08-11011 August 2023 Notice of Meeting with Southern Nuclear Operating Company 2024-07-11
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 9, 2012 Mr. Tom E. Tynan Vice President - Vogtle Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830
SUBJECT:
MEETING ANNOUNCEMENT - PUBLIC MEETING/OPEN HOUSE VOGTLE ELECTRIC GENERATING PLANT, DOCKET NOS. 50-424 & 50-425
Dear Mr. Tynan:
This letter confirms a Category 3 public meeting which has been scheduled for March 29, 2012, at 6:00 p.m. - 6:45 p.m. (EDT). The enclosed meeting notice provides additional details. The purpose of the meeting is to provide opportunities to discuss the annual assessment of Vogtle Electric Generating Plant with the public. The NRC will be available to ensure the publics issues and concerns are understood and considered.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 997-4611.
Sincerely,
/RA/
Frank Ehrhardt, Chief Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-424 and 50-425 License Nos.: NPF-68 and NPF-81
Enclosure:
Public Meeting Agenda
_ ML12069A036 ________________ X SUNSI REVIEW COMPLETE SMS OFFICE RII:DRP RII:DRP SIGNATURE /RA/ /RA/
NAME M. Miller F. Ehrhardt DATE 3/ 9 /12 3/9 /12 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO SNC 2 cc w/encl:
Division of Radiological Health E. G. Anners TN Dept. of Environment & Conservation Licensing Engineer Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution B. D. McKinney, Jr.
Regulatory Response Manager N. J. Stringfellow Southern Nuclear Operating Company, Inc. Licensing Manager Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Hickox, T. Mark Vogtle Electric Generating Plant Paula Marino Electronic Mail Distribution Vice President Engineering M. J. Ajluni Southern Nuclear Operating Company, Inc.
Nuclear Licensing Director Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Bob Masse Resident Manager Sandra Threatt, Manager Vogtle Electric Generating Plant Nuclear Response and Emergency Oglethorpe Power Corporation Environmental Surveillance Electronic Mail Distribution Bureau of Land and Waste Management Department of Health and Environmental Moanica Caston Control Vice President and General Counsel Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution T. D. Honeycutt Regulatory Response Supervisor S. C. Swanson Southern Nuclear Operating Company, Inc. Site Support Manager Electronic Mail Distribution Vogtle Electric Generating Plant Electronic Mail Distribution D. G. Bost Chief Nuclear Officer Chris Clark Southern Nuclear Operating Company, Inc. Commissioner Electronic Mail Distribution Georgia Department of Natural Resources Electronic Mail Distribution Bradley J. Adams Vice President Lee Foley Fleet Operations Support Manager of Contracts Generation Southern Nuclear Operating Company, Inc. Oglethorpe Power Corporation Electronic Mail Distribution Electronic Mail Distribution R. D. Baker (cc w/encl contd - See next page)
Licensing Supervisor Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
SNC 3 (cc w/encl contd)
F. Allen Barnes Office of the County Commissioner Director Burke County Commission Environmental Protection Division Electronic Mail Distribution Georgia Department of Natural Resources Electronic Mail Distribution Arthur H. Domby, Esq.
Troutman Sanders Cynthia A. Sanders Electronic Mail Distribution Radioactive Materials Program Manager Environmental Protection Division Director Georgia Department of Natural Resources Consumers' Utility Counsel Division Electronic Mail Distribution Govenor's Office of Consumer Affairs 2 M. L. King, Jr. Drive James A. Sommerville Plaza Level East; Suite 356 Program Coordination Branch Chief Atlanta, GA 30334-4600 Environmental Protection Division Georgia Department of Natural Resources Susan E. Jenkins Electronic Mail Distribution Director, Division of Waste Management Bureau of Land and Waste Management James C. Hardeman S.C. Department of Health and Environmental Radiation Program Manager Environmental Control Environmental Protection Division Electronic Mail Distribution Georgia Department of Natural Resources Electronic Mail Distribution Ted V. Jackson Emergency Response and Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Office of the Attorney General Electronic Mail Distribution
SNC 4 Letter to Tom E. Tynan from Frank Ehrhardt dated March 9, 2012
SUBJECT:
MEETING ANNOUNCEMENT - PUBLIC MEETING/OPEN HOUSE VOGTLE ELECTRIC GENERATING PLANT, DOCKET NOS. 50-424 & 50-425 Distribution w/encl:
Region II Administrators Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS RIDSNRRPMVogtle Resource L Douglas, RII RIDSNRRDIRS OE Mail PUBLIC
SUBJECT:
PUBLIC MEETING/OPEN HOUSE REGARDING VOGTLE ELECTRIC GENERATING PLANT ANNUAL ASSESSMENT FACILITY: Vogtle Electric Generating Plant DOCKET: 50-424 and 50-425 DATE & TIME: Thursday, March 29, 2012, at 6:00 p.m. (EDT) 6:00 p.m. - 6:45 p.m. - Open House and Poster Session LOCATION: Augusta Technical College Waynesboro Campus 216 Georgia Highway 24 S (Auditorium)
Waynesboro, GA 30830 PURPOSE:
The purpose of the meeting/open house session is to provide opportunities to discuss the annual assessment of Vogtle Electric Generating Plant with the public. The Annual Assessment Letter is accessible from the Publicly Available Records (PARS) component of NRC's document system (ADAMS) (ML12065A203) or http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/vog_2011q 4.pdf The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g.,
Braille, large print), please notify the NRCs meeting contact, listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
CATEGORY: This is a Category 3 meeting: The public is invited to fully participate in this meeting/open house. The NRC will be available to ensure the publics issues and concerns are understood and considered by the NRC.
NRC OFFICE(S) Region II PARTICIPATING:
Enclosure
2 OTHER None ORGANIZATIONS PARTICIPATING:
PARTICIPANTS: NRC (partial list)
F. Ehrhardt, Chief, Reactor Projects Branch 2, Division of Reactor Projects, Region II L. Cain, Senior Resident Inspector, Vogtle Generating Plant T. Chandler, Resident Inspector, Vogtle Generating Plant MEETING Frank Ehrhardt, NRC, RII CONTACT: (404) 997-4611 Frank.Ehrhardt@nrc.gov AUDIO TELE- Not Available CONFERENCE:
VIDEO- Not Available CONFERENCE:
Enclosure