MONTHYEARML1023101632010-08-23023 August 2010 Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Amendment Request - Addition of Analytical Methodology to (COLR) (TAC Nos. ME4262 & ME4263) Project stage: Acceptance Review ML1100400032011-01-0303 January 2011 E-mail Request for Additional Information Addition of Analytical Methodology to COLR Project stage: RAI ML1102700892011-01-26026 January 2011 Response Request for Additional Information (Rai), Proposed License Amendment Request (Lar), Addition of Analytical Methodology to COLR Project stage: Request ML1113701372011-05-16016 May 2011 Supplemental Information to Support Proposed License Amendment Request (LAR) Addition of Analytical Methodology to COLR Project stage: Supplement ML11165A0242011-06-15015 June 2011 Request for Additional Information Project stage: RAI ML12054A1622012-02-29029 February 2012 Issuance of Amendments Regarding Addition of Analytical Methodology to Core Operating Limits Reports for the Critical Heat Flux Correlation (TACs ME4262 and ME4263) Project stage: Approval ML12066A2082012-03-13013 March 2012 Correction to Issuance of Amendments Regarding Addition of Analytical Methodology to Core Operating Limits Reported for the Critical Heat Flux Correlation Project stage: Approval 2011-05-16
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 13, 2012 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center SOOO Dominion Boulevard Glen Allen, VA 23060-6711 SUB..IECT: NORTH ANNA POWER STATION, UNITS 1 AND 2 - CORRECTION LETTER RE: ISSUANCE OF AMENDMENTS REGARDING ADDITION OF AN ANALYTICAL METHODOLOGY TO CORE OPERATING LIMITS REPORTS FOR THE CRITICAL HEAT FLUX CORRELATION (TAC NOS. ME4262 AND ME4263)
Dear Mr. Heacock:
By letter dated February 29, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 120S4A163), the U.S. Nuclear Regulatory Commission (NRC) has issued the Amendment Nos. 266 and 247 to Renewed Facility Operating License Nos. NPF-4 and NPF-7 for the North Anna Power Station Units 1 and 2 (NAPS 1 and 2), respectively. The amendments change the Technical Specifications (TSs) in response to your application dated July 19, 2010, as supplemented September 9, 2010, January 26, May 16, and June 23, 2011.
These amendments revise TS S.6.S.b, "Core Operating Limits Report (COLR)," to include "Appendix C, Qualification of the Westinghouse WRB-2M CHF Correlation in the Dominion VIPRE-D Computer Code." This would allow NAPS to use the VIPRE-DIWRB-2M and VIPRE-DIW-3 correlation pairs to perform licensing calculations with Westinghouse Robust Fuel Assembly (RFA-2) fuel in the cores.
Because of an inadvertent error, licensing Page 3 for NAPS Units 1 and 2, show incorrect Maximum Power Level and a missing Amendment Number. The enclosures to this letter provide corrected Page 3 for NAPS Units 1 and 2.
D. Heacock -2 Please contact me, if you have any questions regarding this correction letter.
Sincerely,
. V. Sreenivas, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339
Enclosures:
- 1. Corrected Page 3 for NAPS, Unit 1 Amendment No. 266 to License No. NPF-4
- 2. Corrected Page 3 for NAPS, Unit 2 Amendment No. 247 to License No. NPF-7 cc w/encls: Distribution via Listserv
(2) Pursuant to the Act and 10 CFR Part 70. VEPCO to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report; (3) Pursuant to the Act and 10 CFR Parts 3D, 40, and 70, VEPCO to receive.
possess, and use at any time any byproduct, source. and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30,40, and 70, VEPCO to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material, without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or component; and (5) Pursuant to the Act and 10 CFR Parts 30 and 70, VEPCO to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 cm Chapter I:
Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations. and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level VEPCO is authorized to operate the North Anna Power Station, Unit No.1. at reactor core power levels not in excess of 2940 megawatts (thenna!).
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 266 ,are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications.
NORTH ANNA - UNIT 1. Renewed License No. NPF-4 Amendment No. 266 Corrected by letter dated March 13,2012
-3 (3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, VEPCO to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 3D, 40, and 70, VEPCQ to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material, without restriction to chemical or physical tonn, tor sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30,40, and 70, VEPCQ to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed license shall be deemed to contain and is suPject to the conditions specified in the Commission's regulations as set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules. regulations, and orders of the Commission now or hereafter in effect: and is subject to the additional conditions specified or incorporated below:
(1) Maximum PQ\Yer Level VEPCO Is authorized to operate the facility at steady state reactor core power levels not in excess of 2940 megawatts (thermal).
(2) Technical SpecifICations The Technical S~catlons contained in Appendix A, as revised through Amendment No. 247 are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3) Additional Conditions The matters specified in the following conditions shall be completed to the satisfaction of the Commission within the stated time periods following the issuance of the condition or within the operational restrictions indicated. The removal of these conditions shall be made by an amendment to the renevved license supported by a favorable evaluation by the Commission:
- a. IfVEPCO plans to remove or to make significant changes in the normal operation of equipment that corirols the amount of radioactivity in effluents from the North Anna Power Station, the NORTH ANNA - UNIT 2 Renewed License N9. NPF-7 Amendment ttl. 247 Corrected by letter dated March 13,2012
D. Heacock -2 Please contact me, if you have any questions regarding this correction letter.
Sincerely, IRA!
Dr. V. Sreenivas, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339
Enclosures:
- 1. Corrected Page 3 for NAPS, Unit 1 Amendment No. 266 to License No. NPF-4
- 2. Corrected Page 3 for NAPS, Unit 2 Amendment No. 247 to License No. NPF-7 cc w/encls: Distribution via Listserv DISTRI BUTION:
Public LPL2-1 RlF RidsN rrDorlLpl2-1 RidsNrrDssSnpb RidsN rrPMNorthAnna RidsAcrsAcnw_MailCTR RidsNrrLASFigueroa RidsNrrDirsltsb RidsOgcRp RidsNrrDorlDpr RidsRgn2MailCente M. Panicker, NRRlDSS ADAMS Accession No. ML12066A208 OFFICE NRRlLPL2-1/PM NRRlLPL2-1/LA NRRlLPL2-1/BC NRRlLPL2-1/PM NAME VSreenivas SFigueroa NSalgado VSreenivas DATE 03/07/12 03/07/12 03/08/12 03/13/12 OFFICIAL RECORD COpy